-
2
-
-
21244436499
-
Design aspects for wide-area monitoring and control systems
-
May
-
M. Zima, M. Larsson, P. Korba, C. Rehtanz, and G. Andersson, "Design aspects for wide-area monitoring and control systems," Proc. IEEE, vol. 93, no. 5, pp. 970-996, May 2005.
-
(2005)
Proc. IEEE
, vol.93
, Issue.5
, pp. 970-996
-
-
Zima, M.1
Larsson, M.2
Korba, P.3
Rehtanz, C.4
Andersson, G.5
-
3
-
-
67650703200
-
Optimal placement of phasor measurement units using immunity genetic algorithm
-
Jul.
-
F. Aminifar, C. Lucas, A. Khodaei, and M. Fotuhi-Firuzabad, "Optimal placement of phasor measurement units using immunity genetic algorithm," IEEE Trans. Power Del., vol. 24, no. 3, pp. 1014-1020, Jul. 2009.
-
(2009)
IEEE Trans. Power Del.
, vol.24
, Issue.3
, pp. 1014-1020
-
-
Aminifar, F.1
Lucas, C.2
Khodaei, A.3
Fotuhi-Firuzabad, M.4
-
4
-
-
76649145107
-
Contingency-constrained PMU placement in power networks
-
Feb.
-
F. Aminifar, A. Khodaei, M. Fotuhi-Firuzabad, and M. Shahidehpour, "Contingency-constrained PMU placement in power networks," IEEE Trans. Power Syst., vol. 25, no. 1, pp. 516-523, Feb. 2010.
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.1
, pp. 516-523
-
-
Aminifar, F.1
Khodaei, A.2
Fotuhi-Firuzabad, M.3
Shahidehpour, M.4
-
5
-
-
67650074157
-
Evaluating multiple reliability indices of regional networks in wide area measurement system
-
Oct.
-
Y. Wang, W. Li, J. Lu, and H. Liu, "Evaluating multiple reliability indices of regional networks in wide area measurement system," Elect. Power Syst. Res., vol. 73, no. 10, pp. 1353-1359, Oct. 2009.
-
(2009)
Elect. Power Syst. Res.
, vol.73
, Issue.10
, pp. 1353-1359
-
-
Wang, Y.1
Li, W.2
Lu, J.3
Liu, H.4
-
6
-
-
79960041897
-
Observability enhancement by optimal PMU placement considering random power system outages
-
F. Aminifar, M. Fotuhi-Firuzabad, M. Shahidehpour, and A. Khodaei, "Observability enhancement by optimal PMU placement considering random power system outages," Energy Syst., vol. 2, 2011.
-
Energy Syst.
, vol.2
, pp. 2011
-
-
Aminifar, F.1
Fotuhi-Firuzabad, M.2
Shahidehpour, M.3
Khodaei, A.4
-
7
-
-
54049116233
-
Optimal multistage scheduling of PMU placement: An ILP approach
-
Oct.
-
D. Dua, S. Dambhare, R. K. Gajbhiye, and S. A. Soman, "Optimal multistage scheduling of PMU placement: An ILP approach," IEEE Trans. Power Del., vol. 23, no. 4, pp. 1812-1820, Oct. 2006.
-
(2006)
IEEE Trans. Power Del.
, vol.23
, Issue.4
, pp. 1812-1820
-
-
Dua, D.1
Dambhare, S.2
Gajbhiye, R.K.3
Soman, S.A.4
-
8
-
-
0037292302
-
Nondominated sorting genetic algorithm for optimal phasor measurement placement
-
Feb.
-
B. Milosevic and M. Begovic, "Nondominated sorting genetic algorithm for optimal phasor measurement placement," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 69-75, Feb. 2003.
-
(2003)
IEEE Trans. Power Syst.
, vol.18
, Issue.1
, pp. 69-75
-
-
Milosevic, B.1
Begovic, M.2
-
9
-
-
52149096751
-
A hybrid algorithm based on BPSO and immune mechanism for PMU optimization placement
-
Jun.
-
P. Chunhua and X. Xuesong, "A hybrid algorithm based on BPSO and immune mechanism for PMU optimization placement," in Proc. World Congr. Intel. Control Automation, Jun. 2008, pp. 7036-7040.
-
(2008)
Proc. World Congr. Intel. Control Automation
, pp. 7036-7040
-
-
Chunhua, P.1
Xuesong, X.2
-
10
-
-
58249125350
-
Placement of synchronized measurements for power system observability
-
Jan.
-
S. Chakrabarti, E. Kyriakides, and D. G. Eliades, "Placement of synchronized measurements for power system observability," IEEE Trans. Power Del., vol. 24, no. 1, pp. 12-19, Jan. 2009.
-
(2009)
IEEE Trans. Power Del.
, vol.24
, Issue.1
, pp. 12-19
-
-
Chakrabarti, S.1
Kyriakides, E.2
Eliades, D.G.3
-
12
-
-
0025798735
-
Reliabilty assessment of the operational functions of a power system control center
-
L. Wang, P. P. Gelberger, and N. Ramani, "Reliability assessment of the operational functions of a power system control center," in Proc. Inst. Eng. Technol. Prob. Methods Appl. Elec. Power Syst., Jul. 1991, pp. 229-234. (Pubitemid 21727908)
-
(1991)
IEE Conference Publication
, Issue.338
, pp. 229-234
-
-
Wang, L.1
Gelberger, P.P.2
Ramani, N.3
-
13
-
-
27844462056
-
Phasor measurement unit placement techniques for complete and incomplete observability
-
DOI 10.1109/TPWRD.2005.855457
-
R. F. Nuqui and A. G. Phadke, "Phasor measurement unit placement techniques for complete and incomplete observability," IEEE Trans. Power Del., vol. 20, no. 4, pp. 2381-2388, Oct. 2005. (Pubitemid 41638211)
-
(2005)
IEEE Transactions on Power Delivery
, vol.20
, Issue.4
, pp. 2381-2388
-
-
Nuqui, R.F.1
Phadke, A.G.2
-
15
-
-
84873683424
-
-
The IBM ILOG CPLEX website. [Online]. Available: http://www-01. ibm.com/software/integration/optimization/cplex-optimizer/
-
The IBM ILOG CPLEX Website
-
-
-
16
-
-
9244247321
-
Market-based transmission expansion planning
-
Nov.
-
M. O. Buygi, G. Balzer, H. M. Shanechi, and M. Shahidehpour, "Market-based transmission expansion planning," IEEE Trans. Power Syst., vol. 19, no. 4, pp. 2060-2067, Nov. 2004.
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, Issue.4
, pp. 2060-2067
-
-
Buygi, M.O.1
Balzer, G.2
Shanechi, H.M.3
Shahidehpour, M.4
-
17
-
-
77957009928
-
Reliability modeling of PMUs using fuzzy sets
-
Oct.
-
F. Aminifar, S. Bagheri-Shouraki, M. Fotuhi-Firuzabad, and M. Shahidehpour, "Reliability modeling of PMUs using fuzzy sets," IEEE Trans. Power Del., vol. 25, no. 10, pp. 2384-2391, Oct. 2010.
-
(2010)
IEEE Trans. Power Del.
, vol.25
, Issue.10
, pp. 2384-2391
-
-
Aminifar, F.1
Bagheri-Shouraki, S.2
Fotuhi-Firuzabad, M.3
Shahidehpour, M.4
-
18
-
-
43849102333
-
The measurement outage table and state estimation
-
DOI 10.1109/TPWRS.2008.920727
-
M. J. Rice and G. T. Heydt, "The measurement outage table and state estimation," IEEE Trans. Power Syst., vol. 23, no. 2, pp. 353-360, May 2008. (Pubitemid 351695813)
-
(2008)
IEEE Transactions on Power Systems
, vol.23
, Issue.2
, pp. 353-360
-
-
Rice, M.J.1
Heydt, G.T.2
|