메뉴 건너뛰기




Volumn 27, Issue 1, 2011, Pages 255-260

Biomass power plant site selection modeling and decision optimization

Author keywords

Biomass; Linear programming; Power plants; Site selection

Indexed keywords

BIOMASS POWER PLANTS; DECISION MAKERS; INSTALLED CAPACITY; LINEAR PROGRAMMING MODELS; MINIMUM COST; MINIMUM ENERGY; TRANSPORT COSTS; TRANSPORTATION FUELS;

EID: 79953085058     PISSN: 10026819     EISSN: None     Source Type: Journal    
DOI: 10.3969/j.issn.1002-6819.2011.01.041     Document Type: Article
Times cited : (9)

References (16)
  • 1
    • 79953123924 scopus 로고    scopus 로고
    • Chinese source
    • 2009, 9(2):37-41.
    • (2009) , vol.9 , Issue.2 , pp. 37-41
  • 2
    • 79953069074 scopus 로고    scopus 로고
    • Chinese source
    • 2007, 19(7):124-126.
    • (2007) , vol.19 , Issue.7 , pp. 124-126
  • 3
    • 77949267067 scopus 로고    scopus 로고
    • A mathematical model for transporting the biomass to biomass based power plant
    • Jagtar Singh, Panesar B S, Sharma S K. A mathematical model for transporting the biomass to biomass based power plant[J]. Biomass and Bioenercy, 2010, 34(4): 483-488.
    • (2010) Biomass and Bioenercy , vol.34 , Issue.4 , pp. 483-488
    • Singh, J.1    Panesar, B.S.2    Sharma, S.K.3
  • 4
    • 79953083590 scopus 로고    scopus 로고
    • Chinese source
    • 2008, 8(2):305-313.
    • (2008) , vol.8 , Issue.2 , pp. 305-313
  • 5
    • 0028665777 scopus 로고
    • A grey dynamic programming for waste-management planning under uncertainty
    • Huang G H, Baetz B W, Patry G G, et al. A grey dynamic programming for waste-management planning under uncertainty[J]. Journal of Urban Planning and Development, 1994, 120(3): 132-156.
    • (1994) Journal of Urban Planning and Development , vol.120 , Issue.3 , pp. 132-156
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 6
    • 79953124894 scopus 로고    scopus 로고
    • Chinese source
    • 2008, 36(6):73-76.
    • (2008) , vol.36 , Issue.6 , pp. 73-76
  • 7
    • 0040676744 scopus 로고    scopus 로고
    • Trash flow allocation: planning under uncertainty
    • Huang G H, Baetz B W, Patry G G. Trash flow allocation: planning under uncertainty[J]. Interfaces, 1998, 28(6): 36-55.
    • (1998) Interfaces , vol.28 , Issue.6 , pp. 36-55
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 8
    • 59049089649 scopus 로고    scopus 로고
    • An optimization model for multi-biomass tri-generation energy supply
    • Rentizelas A, Tatsiopoulos I P, Tolis A. An optimization model for multi-biomass tri-generation energy supply[J]. Biomass and Bioenergy, 2009, 33(2): 223-233.
    • (2009) Biomass and Bioenergy , vol.33 , Issue.2 , pp. 223-233
    • Rentizelas, A.1    Tatsiopoulos, I.P.2    Tolis, A.3
  • 9
    • 0000666441 scopus 로고
    • Grey integer programming: an application to waste management planning under uncertainty
    • Huang G H, Baetz B W, Patry G G. Grey integer programming: an application to waste management planning under uncertainty[J]. European Journal of Operational Research, 1995, 83(3): 594-620.
    • (1995) European Journal of Operational Research , vol.83 , Issue.3 , pp. 594-620
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 10
    • 0029485968 scopus 로고
    • Grey fuzzy integer programming: an application to regional waste management planning under uncertainty
    • Huang G H, Baetz B W, Patry G G. Grey fuzzy integer programming: an application to regional waste management planning under uncertainty [J]. Socio-Economic Planning Sciences, 1995, 29(1): 17-38.
    • (1995) Socio-Economic Planning Sciences , vol.29 , Issue.1 , pp. 17-38
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 11
    • 0029710472 scopus 로고    scopus 로고
    • IPWM: An interval parameter water quality management model
    • Huang G H. IPWM: An interval parameter water quality management model[J]. Engineer Optimization, 1996, 26(2): 79-103.
    • (1996) Engineer Optimization , vol.26 , Issue.2 , pp. 79-103
    • Huang, G.H.1
  • 12
    • 84963455687 scopus 로고
    • A grey linear programming approach for municipal solid waste management planning under uncertainty
    • Huang G H, Baetz B W, Patry G G. A grey linear programming approach for municipal solid waste management planning under uncertainty[J]. Civil Engineering Systems, 1992, 9(4): 319-335.
    • (1992) Civil Engineering Systems , vol.9 , Issue.4 , pp. 319-335
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 13
    • 35648935574 scopus 로고    scopus 로고
    • A participatory systems approach to modeling social, economic, and ecological components of bioenergy
    • Thomas S Buchholz, Timothy A Volk, Valerie A Luzadis. A participatory systems approach to modeling social, economic, and ecological components of bioenergy[J]. Energy Policy, 2007, 35(12): 6084-6094.
    • (2007) Energy Policy , vol.35 , Issue.12 , pp. 6084-6094
    • Buchholz, T.S.1    Volk, T.A.2    Luzadis, V.A.3
  • 14
    • 0037208273 scopus 로고    scopus 로고
    • Biomass power cost and optimum plant size in western Canada
    • Amit Kumar, Jay B Cameron, Peter C Flynn. Biomass power cost and optimum plant size in western Canada [J]. Biomass and Bioenergy, 2003, 24(6): 445-464.
    • (2003) Biomass and Bioenergy , vol.24 , Issue.6 , pp. 445-464
    • Kumar, A.1    Cameron, J.B.2    Flynn, P.C.3
  • 15
    • 42949088433 scopus 로고    scopus 로고
    • Economic, energy and environment analysis on biomass collection process
    • Xing Aihua, Liu Gang, Wang Yao. Economic, energy and environment analysis on biomass collection process [J]. The Chinese Journal of Process Engineering, 2008, 8(2): 305-313.
    • (2008) The Chinese Journal of Process Engineering , vol.8 , Issue.2 , pp. 305-313
    • Xing, A.1    Liu, G.2    Wang, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.