-
1
-
-
0033906893
-
Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
-
DOI 10.1016/S0925-5273(99)00048-1
-
Botta-Genoulaz, V., 2000. Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. International Journal of Production Economics, 64(1), 101-111. (Pubitemid 30557647)
-
(2000)
International Journal of Production Economics
, vol.64
, Issue.1
, pp. 101-111
-
-
Botta-Genoulaz, V.1
-
2
-
-
0014807274
-
A heuristic algorithm for the n-job, m-machine scheduling problem
-
Campbell, H. G., Dudek, R. A., and Smith, M. L., 1970. A heuristic algorithm for the n-job, m-machine scheduling problem. Management Science, 16(10), 630-637.
-
(1970)
Management Science
, vol.16
, Issue.10
, pp. 630-637
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
3
-
-
51749104450
-
A framework for generating product production information for mass customization
-
Dean, P. R., Tu, Y. L., and Xue, D., 2008. A framework for generating product production information for mass customization. International Journal of Advanced Manufacturing Technology, 38 (11-12), 1244-1259.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.38
, Issue.11-12
, pp. 1244-1259
-
-
Dean, P.R.1
Tu, Y.L.2
Xue, D.3
-
4
-
-
57049138869
-
An information system for one-of-a-kind production
-
Dean, P. R., Tu, Y. L., and Xue, D., 2009. An information system for one-of-a-kind production. International Journal of Production Research, 47(4), 1071-1087.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.4
, pp. 1071-1087
-
-
Dean, P.R.1
Tu, Y.L.2
Xue, D.3
-
5
-
-
9744246863
-
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
-
Framinan, J. M., Gupta, J. N. D., and Leisten, R., 2004. A review and classification of heuristics for permutation flow-shop scheduling with makespan objective. Journal of the Operational Research Society, 55(12), 1243-1255.
-
(2004)
Journal of the Operational Research Society
, vol.55
, Issue.12
, pp. 1243-1255
-
-
Framinan, J.M.1
Gupta, J.N.D.2
Leisten, R.3
-
6
-
-
0002536833
-
Simulation for analysis of scheduling rules for a flexible manufacturing system
-
Goyal, S. K., et al., 1995. Simulation for analysis of scheduling rules for a flexible manufacturing system. Integrated Manufacturing Systems, 6(5), 21-26.
-
(1995)
Integrated Manufacturing Systems
, vol.6
, Issue.5
, pp. 21-26
-
-
Goyal, S.K.1
-
7
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
Graham, R., et al., 1979. Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5, 287-326.
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 287-326
-
-
Graham, R.1
-
8
-
-
27144552649
-
Flowshop research after five decades
-
Gupta, J. N. D. and Stafford Jr, E. F., 2006. Flowshop research after five decades. European Journal of Operational Research, 169(3), 699-711.
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 699-711
-
-
Gupta, J.N.D.1
Stafford Jr., E.F.2
-
9
-
-
0003075019
-
Optimal two-and three-stage production schedules with set-up times included
-
Johnson, D. S., 1954. Optimal two-and three-stage production schedules with set-up times included. Naval Research Logistics Quarterly, 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, D.S.1
-
10
-
-
0019010962
-
Heuristics for flow-shop scheduling
-
King, J. R. and Spachis, A. S., 1980. Heuristics for flow-shop scheduling. International Journal of Production Research, 18(3), 345-357.
-
(1980)
International Journal of Production Research
, vol.18
, Issue.3
, pp. 345-357
-
-
King, J.R.1
Spachis, A.S.2
-
12
-
-
0032599588
-
Hybrid flow shop scheduling: A survey
-
Linn, R. and Zhang, W., 1999. Hybrid flow shop scheduling: a survey. Computers & Industrial Engineering, 37(1), 57-61.
-
(1999)
Computers & Industrial Engineering
, vol.37
, Issue.1
, pp. 57-61
-
-
Linn, R.1
Zhang, W.2
-
13
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
DOI 10.1016/0305-0483(83)90088-9
-
Nawaz, M., Enscore Jr, E. E., and Ham, I., 1983. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. OMEGA The International Journal of Management Science, 11(1), 91-95. (Pubitemid 13193807)
-
(1983)
Omega
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
14
-
-
79952752799
-
-
Available from:, Accessed 30 April 2010
-
OR, 2008. Available from: http//people.brunel.ac.uk/~mastjjb/jeb/orlib/ flowshopinfo.html [Accessed 30 April 2010].
-
(2008)
-
-
-
16
-
-
0031198746
-
Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach
-
PII S1042296X97059065
-
Park, S. C., Raman, N., and Shaw, M. J., 1997. Adaptive scheduling in dynamic flexible manufacturing systems: a dynamic rule selection approach. IEEE Transactions on Robotics and Automation, 13(4), 486-502. (Pubitemid 127763308)
-
(1997)
IEEE Transactions on Robotics and Automation
, vol.13
, Issue.4
, pp. 486-502
-
-
Park, S.C.1
Raman, N.2
Shaw, M.J.3
-
18
-
-
13444251134
-
A comprehensive review and evaluation of permutation flowshop heuristics
-
DOI 10.1016/j.ejor.2004.04.017, PII S0377221704002553, Project Management and Scheduling
-
Ruiz, R. and Maroto, C, 2005. A comprehensive review and evaluation of permutation flowshop heuristics. European Journal of Operational Research, 165(2), 479-494. (Pubitemid 40206377)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 479-494
-
-
Ruiz, R.1
Maroto, C.2
-
19
-
-
0027201278
-
Benchmarks for basic scheduling problems
-
DOI 10.1016/0377-2217(93)90182-M
-
Taillard, E., 1993. Benchmarks for basic scheduling problems. European Journal of Operational Research, 64(2), 278-285. (Pubitemid 23599340)
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.2
, pp. 278-285
-
-
Taillard, E.1
-
20
-
-
0141636340
-
A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage
-
Thornton, H. W. and Hunsucker, J. L., 2004. A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage. European Journal of Operational Research, 152(1), 96-114.
-
(2004)
European Journal of Operational Research
, vol.152
, Issue.1
, pp. 96-114
-
-
Thornton, H.W.1
Hunsucker, J.L.2
-
21
-
-
10844296288
-
A framework for production planning and control in a virtual OKP company
-
Dearborn, MI: Society of Manufacturing Engineers
-
Tu, Y. L., 1996a. A framework for production planning and control in a virtual OKP company. Transactions of the North American Manufacturing Research Institute of SME. Vol. 24, Dearborn, MI: Society of Manufacturing Engineers, 121-126.
-
(1996)
Transactions of the North American Manufacturing Research Institute of SME
, vol.24
, pp. 121-126
-
-
Tu, Y.L.1
-
22
-
-
0030212351
-
Automatic scheduling and control of a ship welding assembly line
-
Tu, Y. L., 1996b. Automatic scheduling and control of a ship welding assembly line. Computers in Industry, 29(3), 169-177.
-
(1996)
Computers in Industry
, vol.29
, Issue.3
, pp. 169-177
-
-
Tu, Y.L.1
-
23
-
-
33745220037
-
Flexible flow shop scheduling: Optimum, heuristics and artificial intelligence solutions
-
DOI 10.1111/j.1468-0394.2005.00297.x
-
Wang, H., 2005. Flexible flow shop scheduling: optimum, heuristic and artificial intelligence solutions. Expert Systems, 22(2), 78-85. (Pubitemid 43906636)
-
(2005)
Expert Systems
, vol.22
, Issue.2
, pp. 78-85
-
-
Wang, H.1
|