메뉴 건너뛰기




Volumn 33, Issue 4, 2011, Pages 1054-1061

Chronological simulation for transmission reliability margin evaluation with time varying loads

Author keywords

Available transfer capability; Composite system; Linear programming; Monte Carlo method; Power system reliability

Indexed keywords

AVAILABLE TRANSFER CAPABILITY; COMPOSITE SYSTEM; HOURLY LOAD; IEEE-RELIABILITY TEST SYSTEM; INTERIOR-POINT METHOD; LINEAR OPTIMAL POWER FLOW; MONTE CARLO; POWER SYSTEM RELIABILITY; RISK LEVELS; SEQUENTIAL SIMULATION; SIGNIFICANT IMPACTS; SYSTEM STATE; TIME DEPENDENT; TIME VARYING LOADS; TRANSMISSION RELIABILITY MARGIN;

EID: 79952448126     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijepes.2011.01.024     Document Type: Article
Times cited : (16)

References (32)
  • 1
    • 0033892010 scopus 로고    scopus 로고
    • Transmission management in the deregulated environment
    • DOI 10.1109/5.823997
    • R.D. Christie, B.F. Wollenberg, and I. Wangensteen Transmission management in the deregulated environment Proc IEEE 88 February 2000 170 195 (Pubitemid 30558108)
    • (2000) Proceedings of the IEEE , vol.88 , Issue.2 , pp. 170-195
    • Christie, R.D.1    Wollenberg, B.F.2    Wangensteen, I.3
  • 2
    • 0032656412 scopus 로고    scopus 로고
    • Optimal dispatch under transmission contracts
    • R.S. Fang, and A.K. David Optimal dispatch under transmission contracts IEEE Trans Power Syst 14 May 1999 732 737
    • (1999) IEEE Trans Power Syst , vol.14 , Issue.MAY , pp. 732-737
    • Fang, R.S.1    David, A.K.2
  • 3
    • 0032592996 scopus 로고    scopus 로고
    • Transmission congestion management in a electricity market
    • R.S. Fang, and A.K. David Transmission congestion management in a electricity market IEEE Trans Power Syst 14 August 1999 877 883
    • (1999) IEEE Trans Power Syst , vol.14 , Issue.AUGUST , pp. 877-883
    • Fang, R.S.1    David, A.K.2
  • 4
    • 0842330560 scopus 로고    scopus 로고
    • Available transfer capability - Definitions and determinations
    • North American Reliability Council (NERC) June
    • North American Reliability Council (NERC). Available transfer capability - definitions and determinations. NERC report; June 1996.
    • (1996) NERC Report
  • 5
    • 0030214347 scopus 로고    scopus 로고
    • A methodology for probabilistic simultaneous transfer capability analysis
    • F. Xia, and A.P.S. Meliopoulos A methodology for probabilistic simultaneous transfer capability analysis IEEE Trans Power Syst 11 August 1996 1269 1278 (Pubitemid 126781280)
    • (1996) IEEE Transactions on Power Systems , vol.11 , Issue.3 , pp. 1269-1278
    • Xia, F.1    Meliopoulos, A.P.S.2
  • 7
    • 0031144205 scopus 로고    scopus 로고
    • Simultaneous transfer capability assessment by combining interior point methods and Monte Carlo simulation
    • J.C.O. Mello, A.C.G. Melo, and S. Granville Simultaneous transfer capability assessment by combining interior point methods and Monte Carlo simulation IEEE Trans Power Syst 12 May 1997 736 742 (Pubitemid 127771433)
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.2 , pp. 736-742
    • Mello, J.C.O.1    Melo, A.C.G.2    Granville, S.3
  • 8
    • 0037353222 scopus 로고    scopus 로고
    • Calculation of risk and statistical indices associated with available transfer capability
    • Y. Ou, and C. Singh Calculation of risk and statistical indices associated with available transfer capability IEE Proc - Gener Transm Distrib 150 March 2003 239 244
    • (2003) IEE Proc - Gener Transm Distrib , vol.150 , Issue.MARCH , pp. 239-244
    • Ou, Y.1    Singh, C.2
  • 9
    • 1442314512 scopus 로고    scopus 로고
    • Consideration of an appropriate TTC by probabilistic approach
    • K. Audomvongseree, and A. Yokoyama Consideration of an appropriate TTC by probabilistic approach IEEE Trans Power Syst 19 February 2004 375 383
    • (2004) IEEE Trans Power Syst , vol.19 , Issue.FEBRUARY , pp. 375-383
    • Audomvongseree, K.1    Yokoyama, A.2
  • 10
    • 70449726950 scopus 로고    scopus 로고
    • A probabilistic modeling based approach for total transfer capability enhancement using FACTS devices
    • M.A. Khaburi, and M.R. Haghifam A probabilistic modeling based approach for total transfer capability enhancement using FACTS devices Int J Electr Power Energy Syst 32 January 2010 12 16
    • (2010) Int J Electr Power Energy Syst , vol.32 , Issue.JANUARY , pp. 12-16
    • Khaburi, M.A.1    Haghifam, M.R.2
  • 12
    • 84954446992 scopus 로고    scopus 로고
    • Assesement of the congestion costs and the risk of curtailment associated with available transfer capability (ATC)
    • Cornire B, Martin L, Vitet S, Hadjsaid N, Phadke AG. Assesement of the congestion costs and the risk of curtailment associated with available transfer capability (ATC). In: Proceedings of power engineering society winter meeting; 2000. p. 891-6.
    • (2000) Proceedings of Power Engineering Society Winter Meeting , pp. 891-896
    • Cornière, B.M.1
  • 13
    • 0347946933 scopus 로고    scopus 로고
    • Evaluation of transfer capabilities of transmission systems in competitive environments
    • A.M. Leite da Silva, J.G.C. Costa, L.A.F. Manso, and G.J. Anders Evaluation of transfer capabilities of transmission systems in competitive environments Int J Electr Power Energy Syst 26 August 2004 257 263
    • (2004) Int J Electr Power Energy Syst , vol.26 , Issue.AUGUST , pp. 257-263
    • Leite Da Silva, A.M.1    Costa, J.G.C.2    Manso, L.A.F.3    Anders, G.J.4
  • 16
    • 0018494744 scopus 로고
    • A bounded set theoretical approach to reliability modelling and calculations for composite generation-transmission systems
    • DOI 10.1016/0142-0615(79)90012-7
    • H.K. Chong, and T.S. Dillon A bounded set theoretical approach to reliability modelling and calculations for composite generation-transmission systems Int J Electr Power Energy Syst 1 1979 95 106 (Pubitemid 10454054)
    • (1979) International Journal of Electrical Power and Energy System , vol.1 , Issue.2 , pp. 95-106
    • Cheong, H.K.1    Dillon, T.S.2
  • 18
    • 0028465843 scopus 로고
    • Reliability assessment of composite hydrothermal generation and transmission systems using sequential simulation
    • J.R. Ubeda, and R.N. Allan Reliability assessment of composite hydrothermal generation and transmission systems using sequential simulation IEE Proc - Gener Transm Distrib 141 July 1994 257 262
    • (1994) IEE Proc - Gener Transm Distrib , vol.141 , Issue.JULY , pp. 257-262
    • Ubeda, J.R.1    Allan, R.N.2
  • 19
    • 0029354288 scopus 로고
    • Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads
    • A. Sankarakrishnan, and R. Billinton Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads IEEE Trans Power Syst 10 August 1995 1540 1545
    • (1995) IEEE Trans Power Syst , vol.10 , Issue.AUGUST , pp. 1540-1545
    • Sankarakrishnan, A.1    Billinton, R.2
  • 20
    • 33947301253 scopus 로고    scopus 로고
    • Sequential probabilistic methods for power system operation and planning
    • Task Force 13 of Advisory Group 38.03
    • Task Force 13 of Advisory Group 38.03 Sequential probabilistic methods for power system operation and planning Électra 179 August 1998 69 99
    • (1998) Électra , vol.179 , Issue.AUGUST , pp. 69-99
  • 21
  • 22
    • 69649109337 scopus 로고    scopus 로고
    • Probabilistic evaluation of reserve requirements of generating systems with renewable power sources: The Portuguese and Spanish cases
    • M. Matos, J.P. Lopes, M. Rosa, R. Ferreira, A.M. Leite da Silva, and W. Sales Probabilistic evaluation of reserve requirements of generating systems with renewable power sources: the Portuguese and Spanish cases Int J Electr Power Energy Syst 31 October 2009 562 569
    • (2009) Int J Electr Power Energy Syst , vol.31 , Issue.OCTOBER , pp. 562-569
    • Matos, M.1    Lopes, J.P.2    Rosa, M.3    Ferreira, R.4    Leite Da Silva, A.M.5    Sales, W.6
  • 23
    • 74149088163 scopus 로고    scopus 로고
    • Sensitivity of system operating considerations in generating capacity adequacy evaluation
    • R. Billinton, and D. Huang Sensitivity of system operating considerations in generating capacity adequacy evaluation Int J Electr Power Energy Syst 32 March 2010 178186
    • (2010) Int J Electr Power Energy Syst , vol.32 , Issue.MARCH , pp. 178186
    • Billinton, R.1    Huang, D.2
  • 24
    • 0024053999 scopus 로고
    • Monte Carlo approach in planning studies - An application to IEEE RTS
    • O. Bertoldi, L. Salvaderi, and S. Scalcino Monte Carlo approach in planning studies - an application to IEEE RTS IEEE Trans Power Systs 3 August 1988 1146 1154
    • (1988) IEEE Trans Power Systs , vol.3 , Issue.AUGUST , pp. 1146-1154
    • Bertoldi, O.1    Salvaderi, L.2    Scalcino, S.3
  • 25
    • 0032116549 scopus 로고    scopus 로고
    • Reconciling pool and contract dispatch in open access transmission operations
    • A.K. David Reconciling pool and contract dispatch in open access transmission operations IEE Proc - Gener Transm Distrib 145 July 1998 468 472 (Pubitemid 128729350)
    • (1998) IEE Proceedings: Generation, Transmission and Distribution , vol.145 , Issue.4 , pp. 468-472
    • David, A.K.1
  • 27
    • 0034138478 scopus 로고    scopus 로고
    • Assessment of available transfer capability of transmission systems
    • G. Hamoud Assessment of available transfer capability of transmission systems IEEE Trans Power Systs 15 February 2000 27 32
    • (2000) IEEE Trans Power Systs , vol.15 , Issue.FEBRUARY , pp. 27-32
    • Hamoud, G.1
  • 29
    • 0018321631 scopus 로고
    • Review of linear programming applied to power system scheduling
    • Stott B, Marinho JL, Alsa O. Review of linear programming applied to power system scheduling. In: Proceedings of IEEE PICA conference, Cleveland; 1979. p. 142-54. (Pubitemid 9449842)
    • (1979) Proceedings of IEEE PICA Conference , pp. 142-154
    • Stott, B.1    Marinho, J.L.2    Alsac, O.3
  • 31
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE RTS Task Force of APM Subcommittee
    • IEEE RTS Task Force of APM Subcommittee IEEE reliability test system IEEE Trans Power Apparatus Syst 98 November/December 1979 2054 2057
    • (1979) IEEE Trans Power Apparatus Syst , vol.98 , Issue.NOVEMBER AND DECEMBER , pp. 2054-2057
  • 32
    • 0034186793 scopus 로고    scopus 로고
    • Influence of temperature and load forecast uncertainty an estimates of power generation production costs
    • J. Valenzuela, M. Mazumdar, and A. Kapoor Influence of temperature and load forecast uncertainty an estimates of power generation production costs IEEE Trans Power Systs 15 May 2000 668 674
    • (2000) IEEE Trans Power Systs , vol.15 , Issue.MAY , pp. 668-674
    • Valenzuela, J.1    Mazumdar, M.2    Kapoor, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.