메뉴 건너뛰기




Volumn , Issue , 2010, Pages 1640-1645

A proposed study on facility planning and design in manufacturing process

Author keywords

Facility planning; Layout optimization; Simulation

Indexed keywords

FACILITY DESIGNS; FACILITY LAYOUT DESIGN; FACILITY PLANNING; FACILITY PLANNING AND DESIGN; IDLE TIME; LAYOUT OPTIMIZATION; MANUFACTURING IS; MANUFACTURING PROCESS; MATERIAL HANDLING; MATERIAL HANDLING COSTS; PRODUCT FLOW; PRODUCTION LINE; RESEARCH DIRECTIONS; SIMULATION; SIMULATION TECHNIQUE; SPATIAL ENVIRONMENTS; TOTAL COSTS;

EID: 79952394550     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (15)

References (25)
  • 2
    • 33745835822 scopus 로고    scopus 로고
    • An empirical comparison of Tabu Search, Simulated Annealing, and Genetic Algorithms for facilities location problems
    • DOI 10.1016/j.ijpe.2005.08.010, PII S0925527306000971
    • Arostegui. M, Kadipasaoglu. S., Khumawala. B. 2006. An empirical comparison of Tabu Search, Simulated Annealing,and Genetic Algorithms for facilities location problems. Springerlink International journal of Production Economics 103 (2006) 742-754 (Pubitemid 44038504)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 742-754
    • Arostegui Jr., M.A.1    Kadipasaoglu, S.N.2    Khumawala, B.M.3
  • 5
    • 33750466515 scopus 로고    scopus 로고
    • Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions
    • DOI 10.1016/j.ejor.2005.08.027, PII S0377221705009045
    • Balakrishnan. J, Cheng, C.H.; 2007. Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions, European Journal of Operational Research. Ed.177. page 281-309. (Pubitemid 44647603)
    • (2007) European Journal of Operational Research , vol.177 , Issue.1 , pp. 281-309
    • Balakrishnan, J.1    Cheng, C.H.2
  • 6
    • 39749151554 scopus 로고    scopus 로고
    • A Simulation based experimental design to analyze factors affecting production flow time
    • Ekren, B.Y., Ornek, A.M., 2008. A Simulation based experimental design to analyze factors affecting production flow time, Simulation Modeling Practice & Theory vol. 16, p. 278-293
    • (2008) Simulation Modeling Practice & Theory , vol.16 , pp. 278-293
    • Ekren, B.Y.1    Ornek, A.M.2
  • 7
    • 79952396930 scopus 로고    scopus 로고
    • Online accessed 1 September 2009
    • Flexsim archieves. 2009. Flexsim simulation software-overview. Online accessed 1 September 2009. http://www.flexsim.com/products/flexsim.
    • (2009) Flexsim Simulation Software-overview
  • 11
    • 0034802698 scopus 로고    scopus 로고
    • Application of a layout/material handling design method to a furnace area in a 300 mm wafer fab
    • DOI 10.1007/s001700170193
    • Hesen, P. M. C., Renders. P. J. J. and Rooda. J. E., 2001, Application of a Layout/Material Handling Design Method to a Furnace Area in a 300 mm Wafer Fab. Springerlink International journal of Advanced Manufacturing Technology 17: pp 216-220. (Pubitemid 32914819)
    • (2001) International Journal of Advanced Manufacturing Technology , vol.17 , Issue.3 , pp. 216-220
    • Hesen, P.M.C.1    Renders, P.J.J.2    Rooda, J.E.3
  • 12
    • 9744221295 scopus 로고    scopus 로고
    • Comparison of solution procedure to the facility layout problem
    • Houshyar, A., and White, B. 1997. Comparison of solution Procedure to the Facility Layout Problem. Journal of Computers in Industrial Engineering. Vol 32, no. 1 pp. 77-78.
    • (1997) Journal of Computers in Industrial Engineering , vol.32 , Issue.1 , pp. 77-78
    • Houshyar, A.1    White, B.2
  • 14
    • 0035803536 scopus 로고    scopus 로고
    • Design and analysis of a virtual factory layout
    • DOI 10.1016/S0924-0136(01)00908-6, PII S0924013601009086
    • Iqbal.M, and Hashmi. M.S.J, 2001). Design and Analysis of a virtual factory layout. Elsevier International journal of Materials Processing Technology 118 (2001). Pp 403-410. (Pubitemid 33148017)
    • (2001) Journal of Materials Processing Technology , vol.118 , Issue.1-3 , pp. 403-410
    • Iqbal, M.1    Hashmi, M.S.J.2
  • 15
    • 0042629657 scopus 로고    scopus 로고
    • Solving the failure-to-fit problem for plant layout: By changing department shapes and sizes
    • Lin, J.L., Foote, B., Pulat, S., Chang, C.H., and Cheung, J.Y. 1996. Solving the failure-to-fit problem for plant layout: by changing department shapes and sizes. European journal of Operation Research. Vol. 89, pp. 135-146. (Pubitemid 126386768)
    • (1996) European Journal of Operational Research , vol.89 , Issue.1-2 , pp. 135-146
    • Lin, J.-L.1    Foote, B.2    Pulat, S.3    Chang, C.-H.4    Cheung, J.Y.5
  • 16
    • 0024700889 scopus 로고
    • Multiple objective facility layout: A heuristic to generate efficient alternatives
    • Malakooti, B. 1989. Multiple objective facility layout: a heuristic to generate efficient alternatives. International journal of Production Research. Vol. 27. No. 7, pp 1225-1238.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1225-1238
    • Malakooti, B.1
  • 18
    • 79952373994 scopus 로고    scopus 로고
    • Anals of the Oradea University, Fascicle of Managament and Technology Engineering
    • Nica, M. Lucian, Ganea, M. Donka, G. 2008. Simulation of Queues in Manufacturing Systems, Anals of the Oradea University, Fascicle of Managament and Technology Engineering, Vol. VII. Page 56-61.
    • (2008) Simulation of Queues in Manufacturing Systems , vol.7 , pp. 56-61
    • Nica, M.L.1    Ganea, M.2    Donka, G.3
  • 19
    • 0031122987 scopus 로고    scopus 로고
    • Advances in discrete material handling system design
    • April 1997. @printed in India
    • Rajagopalan. S, Heragu. S, 1997. Advances in discrete material handling system design. Sadhana, vol 22, part 2, April 1997, pp.281-292.@printed in India.
    • (1997) Sadhana , vol.22 , Issue.PART 2 , pp. 281-292
    • Rajagopalan, S.1    Heragu, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.