메뉴 건너뛰기




Volumn 1, Issue , 2009, Pages 529-539

Practical prediction of creep, shrinkage and durability of concrete in Japan

Author keywords

[No Author keywords available]

Indexed keywords

CONCRETE STRUCTURES; FUTURE CHALLENGES; TEST DATA; TIME DEPENDENT BEHAVIOR; TIME-DEPENDENT;

EID: 79952347402     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (9)

References (12)
  • 1
    • 51649142942 scopus 로고
    • Structural Engineering Report 94-10/603c: Northwestern University. Published as draft RILEM recommendation in Materials and Structures (RILEM Paris) 415-430 488-495
    • Bažant, Z.P. & Baweja, S. 1994. Creep and shrinkage prediction model for analysis and design of concrete structures - Model B3. Structural Engineering Report 94-10/603c: Northwestern University. Published as draft RILEM recommendation in Materials and Structures (RILEM Paris), 28 (1995), 357-365, 415-430, 488-495.
    • (1994) Creep and Shrinkage Prediction Model for Analysis and Design of Concrete Structures - Model B3 , vol.28 , Issue.1995 , pp. 357-365
    • Bažant, Z.P.1    Baweja, S.2
  • 2
    • 79952338123 scopus 로고
    • Creep behavior of prestressed concrete bridge over ten years
    • Kyoto, Japan, 17-20 October 1993
    • Hata, Y. et al., 1993. Creep Behavior of Prestressed Concrete Bridge over ten years. Proc. of FIP Symposium '93, Kyoto, Japan, 17-20 October 1993: 305-310.
    • (1993) Proc. of FIP Symposium '93 , pp. 305-310
    • Hata, Y.1
  • 3
    • 79952342556 scopus 로고
    • Long-term measurement of tsukiyono bridge superstructure
    • (in Japanese)
    • Hata, Y. & Hirooka, M. 1985. Long-term measurement of Tsukiyono bridge superstructure. Journal of Prestressed Concrete 27 (1): 39-47. (in Japanese)
    • (1985) Journal of Prestressed Concrete , vol.27 , Issue.1 , pp. 39-47
    • Hata, Y.1    Hirooka, M.2
  • 4
    • 79952322956 scopus 로고    scopus 로고
    • Presumption of prestress and cause of large displacement in center hinge PC box girder by released stress method
    • (in Japanese)
    • Hida, K. et al., 2005. Presumption of prestress and cause of large displacement in center hinge PC box girder by released stress method. Collected papers on civil engineering structures and materials 21. (in Japanese).
    • (2005) Collected Papers on Civil Engineering Structures and Materials , vol.21
    • Hida, K.1
  • 5
    • 79952335387 scopus 로고    scopus 로고
    • Improvement of drivability by connecting the center hinge
    • (in Japanese)
    • Itoh, K. et al., 2004. Improvement of drivability by connecting the center hinge. EXTEC No.69 18 (1): 32-37. (in Japanese)
    • (2004) EXTEC No. 69 , vol.18 , Issue.1 , pp. 32-37
    • Itoh, K.1
  • 7
    • 39149120456 scopus 로고    scopus 로고
    • Box girder bridge deflections-why is the initial trend deceptive?
    • ristek, V et al., 2006. Box Girder Bridge Deflections-Why is the initial trend deceptive?. Concrete International 28 (1): 55-63.
    • (2006) Concrete International , vol.28 , Issue.1 , pp. 55-63
    • Ristek, V.1
  • 8
    • 79952352883 scopus 로고
    • Rehabilitation of mikanagi bridge
    • (in Japanese)
    • akai, K. 1983. Rehabilitation of Mikanagi Bridge. Bridge and Foundation Engineering 17 (8): 86-89. (in Japanese)
    • (1983) Bridge and Foundation Engineering , vol.17 , Issue.8 , pp. 86-89
    • Akai, K.1
  • 9
    • 79952324403 scopus 로고    scopus 로고
    • Soundness evaluation and retrofit plan of jinzugawa bridge
    • (in Japanese)
    • akamoto, K. et al., 2003. Soundness evaluation and retrofit plan of Jinzugawa bridge. Bridge and Foundation Engineering 37 (4): 27-31. (in Japanese)
    • (2003) Bridge and Foundation Engineering , vol.37 , Issue.4 , pp. 27-31
    • Akamoto, K.1
  • 10
    • 79952331975 scopus 로고    scopus 로고
    • Retrofit design and construction of kitsureuriha bridge
    • (in Japanese)
    • uzuki, T. et al., 2004. Retrofit design and construction of Kitsureuriha Bridge. Journal of Prestressed Concrete 46 (5): 45-53. (in Japanese)
    • (2004) Journal of Prestressed Concrete , vol.46 , Issue.5 , pp. 45-53
    • Uzuki, T.1
  • 12
    • 79952331974 scopus 로고
    • Rehabilitation of kyobasi bridge
    • (in Japanese)
    • amamoto, T. et al., 1989. Rehabilitation of Kyobasi Bridge. Journal of Prestressed Concrete 31 (6): 31-39. (in Japanese)
    • (1989) Journal of Prestressed Concrete , vol.31 , Issue.6 , pp. 31-39
    • Amamoto, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.