![]() |
Volumn 49, Issue 5, 2011, Pages 664-669
|
Reliability estimation of auxiliary ventilation systems in long tunnels during construction
|
Author keywords
Long tunnels; Markov chains; Reliability; Stochastic process; Ventilation
|
Indexed keywords
AUXILIARY VENTILATION;
DURING CONSTRUCTION;
EMPIRICAL METHOD;
FAILURE RATE;
JET FANS;
LONG TUNNELS;
MARKOV CHAIN;
MARKOV CHAINS THEORY;
RELIABILITY ESTIMATION;
REPAIR RATE;
STOCHASTIC PROCESS;
VENTILATION SYSTEMS;
DECISION THEORY;
FANS;
MARKOV PROCESSES;
QUALITY ASSURANCE;
RELIABILITY;
REPAIR;
RISK PERCEPTION;
STOCHASTIC SYSTEMS;
UNCERTAINTY ANALYSIS;
VENTILATION;
ARTICLE;
BUILDING INDUSTRY;
IRAN;
MATHEMATICAL PARAMETERS;
PRIORITY JOURNAL;
PROBABILITY;
RELIABILITY;
SAFETY;
STATISTICAL ANALYSIS;
VENTILATOR;
|
EID: 79952195660
PISSN: 09257535
EISSN: None
Source Type: Journal
DOI: 10.1016/j.ssci.2010.12.015 Document Type: Article |
Times cited : (14)
|
References (4)
|