메뉴 건너뛰기




Volumn 39, Issue 3, 2011, Pages 1562-1568

A heuristic-based approach for reliability importance assessment of energy producers

Author keywords

Component ranking; Energy producers; Reliability importance

Indexed keywords

COMPONENT RANKING; COMPOSITE GENERATION AND TRANSMISSION SYSTEM; COMPUTATIONAL BURDEN; CONVENTIONAL METHODS; DISTRIBUTION COMPANIES; ENERGY PRODUCERS; ENERGY SUPPLIES; IEEE-RELIABILITY TEST SYSTEM; LARGE POWER SYSTEMS; LOAD POINTS; MARKET PLAYERS; POWER FLOWS; RELIABILITY IMPACTS; RELIABILITY IMPORTANCE; RISK SENSITIVITY; SERVICE QUALITY; SERVICE RELIABILITY; SYSTEM COMPONENTS; SYSTEM OPERATOR;

EID: 79952073805     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2010.12.030     Document Type: Article
Times cited : (8)

References (20)
  • 1
    • 67649850570 scopus 로고    scopus 로고
    • Customer choice of reliability in spinning reserve procurement and cost allocation using well-being analysis
    • Ahmadi-Khatir A., Fotuhi-Firuzabad M., Goel L. Customer choice of reliability in spinning reserve procurement and cost allocation using well-being analysis. Electric Power Systems Research 2009, 79(10):1431-1440.
    • (2009) Electric Power Systems Research , vol.79 , Issue.10 , pp. 1431-1440
    • Ahmadi-Khatir, A.1    Fotuhi-Firuzabad, M.2    Goel, L.3
  • 2
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • Applications of the probability methods subcommittee
    • Applications of the probability methods subcommittee IEEE reliability test system. IEEE Transactions on Power Apparatus and Systems 1979, 98(6):2047-2054.
    • (1979) IEEE Transactions on Power Apparatus and Systems , vol.98 , Issue.6 , pp. 2047-2054
  • 4
    • 34250797931 scopus 로고    scopus 로고
    • Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options
    • Batlle C., Vázquez C., Rivier M., Pérez-Arriaga I. Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options. Energy Policy 2007, 35(9):4545-4554.
    • (2007) Energy Policy , vol.35 , Issue.9 , pp. 4545-4554
    • Batlle, C.1    Vázquez, C.2    Rivier, M.3    Pérez-Arriaga, I.4
  • 8
    • 27744577488 scopus 로고    scopus 로고
    • Electricity market design: an integrated approach to reliability assurance
    • Chow J., De Mello W., Cheung K. Electricity market design: an integrated approach to reliability assurance. Proceedings of the IEEE 2005, 93(11):1956-1969.
    • (2005) Proceedings of the IEEE , vol.93 , Issue.11 , pp. 1956-1969
    • Chow, J.1    De Mello, W.2    Cheung, K.3
  • 9
    • 33846571919 scopus 로고    scopus 로고
    • Component criticality importance measures for the power industry
    • Espiritu J., Coit D., Prakash U. Component criticality importance measures for the power industry. Electric Power Systems Research 2007, 77(5-6):407-420.
    • (2007) Electric Power Systems Research , vol.77 , Issue.5-6 , pp. 407-420
    • Espiritu, J.1    Coit, D.2    Prakash, U.3
  • 10
    • 77649320310 scopus 로고    scopus 로고
    • Assessment of component criticality in high voltage transmission stations
    • Hamoud G. Assessment of component criticality in high voltage transmission stations. IEEE Power & Energy Society General Meeting 2009, 1-7.
    • (2009) IEEE Power & Energy Society General Meeting , pp. 1-7
    • Hamoud, G.1
  • 11
    • 14544278919 scopus 로고    scopus 로고
    • Assessment of component criticality in customer delivery systems, International Conference on Probabilistic Methods Applied to Power Systems
    • Hamoud, G., Lee, L., Toneguzzo, J., Watt, G., 2004. Assessment of component criticality in customer delivery systems, International Conference on Probabilistic Methods Applied to Power Systems, pp. 819-825.
    • (2004) , pp. 819-825
    • Hamoud, G.1    Lee, L.2    Toneguzzo, J.3    Watt, G.4
  • 17
    • 2542592402 scopus 로고    scopus 로고
    • Reliability assessment of a restructured power system considering the reserve agreements
    • Wang P., Billinton R. Reliability assessment of a restructured power system considering the reserve agreements. IEEE Transactions on Power Systems 2004, 19(2):972-978.
    • (2004) IEEE Transactions on Power Systems , vol.19 , Issue.2 , pp. 972-978
    • Wang, P.1    Billinton, R.2
  • 18
    • 0141894809 scopus 로고    scopus 로고
    • Reliability-based reserve management in a bilateral power market
    • Wang P., Goel L. Reliability-based reserve management in a bilateral power market. Electric Power Systems Research 2003, 67(3):185-189.
    • (2003) Electric Power Systems Research , vol.67 , Issue.3 , pp. 185-189
    • Wang, P.1    Goel, L.2
  • 20
    • 79952073334 scopus 로고    scopus 로고
    • http://www.neplan.ch.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.