메뉴 건너뛰기




Volumn 12, Issue 1, 2011, Pages 2-14

Polynomial-time feasibility condition for multiclass aircraft sequencing on a single-runway airport

Author keywords

Aircraft landing problem; polynomial time algorithm; state dependent scheduling

Indexed keywords

AIRCRAFT SEQUENCING; FEASIBILITY CONDITION; FEDERAL AVIATION ADMINISTRATION; LANDING PROBLEMS; MAKESPAN; MULTI-CLASS; NP COMPLETE; NP-HARD; POLYNOMIAL-TIME; POLYNOMIAL-TIME ALGORITHM; RELATIVE WEIGHTS; SCHEDULING PROBLEM; SINGLE-RUNWAY AIRPORT; STATE-DEPENDENT; STATE-DEPENDENT SCHEDULING; TIME INTERVAL;

EID: 79952071629     PISSN: 15249050     EISSN: None     Source Type: Journal    
DOI: 10.1109/TITS.2010.2055856     Document Type: Article
Times cited : (22)

References (23)
  • 2
    • 0019089428 scopus 로고
    • A dynamic programming approach for sequencing groups of identical jobs
    • H. N. Psaraftis, "A dynamic programming approach for sequencing groups of identical jobs," Oper. Res., vol. 28, no. 6, pp. 1347-1359, 1980.
    • (1980) Oper. Res. , vol.28 , Issue.6 , pp. 1347-1359
    • Psaraftis, H.N.1
  • 3
    • 79952071123 scopus 로고    scopus 로고
    • Fed. Aviation Admin., Chicago TRACON
    • Fed. Aviation Admin., Chicago TRACON. [Online]. Available: http://www.faa.gov/ats/c90/
  • 4
    • 0010528912 scopus 로고    scopus 로고
    • Scheduling models and algorithms for TMA traffic management
    • L. Bianco and P. Dell'Olmo, Eds. Berlin, Germany: Springer-Verlag
    • L. Bianco, P. Dell'Olmo, and S. Giordani, "Scheduling models and algorithms for TMA traffic management," in Modelling and Simulation for Air Traffic Management, L. Bianco and P. Dell'Olmo, Eds. Berlin, Germany: Springer-Verlag, 1997, pp. 139-167.
    • (1997) Modelling and Simulation for Air Traffic Management , pp. 139-167
    • Bianco, L.1    Dell'Olmo, P.2    Giordani, S.3
  • 7
    • 0001469168 scopus 로고
    • An algorithm for computer assisted sequencing and scheduling of terminal area operations
    • Mar.-May
    • R. G. Dear and Y. S. Sherif, "An algorithm for computer assisted sequencing and scheduling of terminal area operations," Transp. Res. A, Policy Pract., vol. 25, no. 2/3, pp. 129-139, Mar.-May 1991.
    • (1991) Transp. Res. A, Policy Pract. , vol.25 , Issue.2-3 , pp. 129-139
    • Dear, R.G.1    Sherif, Y.S.2
  • 9
    • 0027649414 scopus 로고
    • Landings at logan airport: Describing and increasing airport capacity
    • Aug.
    • C. S. Venkatakrishan, A. Barnett, and A. R. Odoni, "Landings at logan airport: Describing and increasing airport capacity," Transp. Sci., vol. 27, no. 3, pp. 211-217, Aug. 1993.
    • (1993) Transp. Sci. , vol.27 , Issue.3 , pp. 211-217
    • Venkatakrishan, C.S.1    Barnett, A.2    Odoni, A.R.3
  • 10
    • 1542379904 scopus 로고    scopus 로고
    • MILP formulation and polynomial time algorithm for an aircraft scheduling problem
    • A. Bayen, J. Zhang, C. Tomlin, and Y. Ye, "MILP formulation and polynomial time algorithm for an aircraft scheduling problem," in Proc. IEEE Conf. Decision Control, 2003, pp. 5003-5010.
    • (2003) Proc. IEEE Conf. Decision Control , pp. 5003-5010
    • Bayen, A.1    Zhang, J.2    Tomlin, C.3    Ye, Y.4
  • 13
    • 84989725928 scopus 로고
    • Scheduling tasks with sequence-dependent processing times
    • L. Bianco, S. Ricciardelli, G. Rinaldi, and A. Sassano, "Scheduling tasks with sequence-dependent processing times," Naval Res. Logist., vol. 35, no. 2, pp. 177-184, 1988.
    • (1988) Naval Res. Logist. , vol.35 , Issue.2 , pp. 177-184
    • Bianco, L.1    Ricciardelli, S.2    Rinaldi, G.3    Sassano, A.4
  • 14
    • 0033449926 scopus 로고    scopus 로고
    • Minimizing total completion time subject to release dates and sequence dependent processing times
    • Jan.
    • L. Bianco, P. Dell'Olmo, and S. Giordani, "Minimizing total completion time subject to release dates and sequence dependent processing times," Ann. Oper. Res., vol. 86, pp. 393-415, Jan. 1999.
    • (1999) Ann. Oper. Res. , vol.86 , pp. 393-415
    • Bianco, L.1    Dell'Olmo, P.2    Giordani, S.3
  • 15
    • 19944390778 scopus 로고    scopus 로고
    • Coordination of traffic flows in the TMA
    • L. Bianco, P. Dell'Olmo, and A. R. Odoni, Eds. Berlin, Germany: Springer-Verlag
    • L. Bianco, P. Dell'Olmo, and S. Giordani, "Coordination of traffic flows in the TMA," in New Concepts and Methods in Air Traffic Management, L. Bianco, P. Dell'Olmo, and A. R. Odoni, Eds. Berlin, Germany: Springer-Verlag, 1999, pp. 95-124.
    • (1999) New Concepts and Methods in Air Traffic Management , pp. 95-124
    • Bianco, L.1    Dell'Olmo, P.2    Giordani, S.3
  • 16
    • 0035516862 scopus 로고    scopus 로고
    • Runway operations planning and control sequencing and scheduling
    • I. Anagnostakis and J. P. Clarke, "Runway operations planning and control sequencing and scheduling," AIAA J. Aircr., vol. 38, pp. 988-996, 2002.
    • (2002) AIAA J. Aircr. , vol.38 , pp. 988-996
    • Anagnostakis, I.1    Clarke, J.P.2
  • 18
    • 0030800218 scopus 로고    scopus 로고
    • The flow management problem in air traffic control: A model of assigning priorities at a congested airport
    • Feb.
    • J. Milan, "The flow management problem in air traffic control: A model of assigning priorities at a congested airport," Transp. Plan. Technol., vol. 20, no. 2, pp. 131-162, Feb. 1997.
    • (1997) Transp. Plan. Technol. , vol.20 , Issue.2 , pp. 131-162
    • Milan, J.1
  • 19
    • 0036144013 scopus 로고    scopus 로고
    • Research review of air traffic management
    • DOI 10.1080/01441640110074773
    • C. Wu and R. E. Caves, "Research review of air traffic management," Transp. Rev., vol. 22, no. 1, pp. 115-132, Jan. 2002. (Pubitemid 34057515)
    • (2002) Transport Reviews , vol.22 , Issue.1 , pp. 115-132
    • Wu C.-L. Caves, R.E.1
  • 21
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing theory: A survey
    • R. L. Graham, E. L. Lawler, J. K. Lenstra, and A. H. G. Rinnoy Kan, "Optimization and approximation in deterministic sequencing theory: A survey," Ann. Discr. Math., vol. 5, pp. 287-326, 1979.
    • (1979) Ann. Discr. Math. , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnoy Kan, A.H.G.4
  • 23
    • 0036995549 scopus 로고    scopus 로고
    • State-dependent deadline scheduling
    • C.-S. Shih and J. W. S. Liu, "State-dependent deadline scheduling," in Proc. 23rd IEEE RTSS, 2002, pp. 3-14.
    • (2002) Proc. 23rd IEEE RTSS , pp. 3-14
    • Shih, C.-S.1    Liu, J.W.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.