메뉴 건너뛰기




Volumn 39, Issue 3, 2011, Pages 1794-1801

Transmission investment problems in Europe: Going beyond standard solutions

Author keywords

Investment barriers; Transmission investments; Transmission technologies

Indexed keywords

CONNECTION LINES; INVESTMENT CLIMATE; INVESTMENT COSTS; POLICY MAKERS; REAL PROJECTS; REGULATORY FRAMEWORKS; STANDARD SOLUTIONS; TECHNICAL DETAILS; TECHNICAL SOLUTIONS; TECHNOLOGICAL ALTERNATIVES; TECHNOLOGY ASSESSMENTS; TECHNOLOGY OPTIONS; TRANSMISSION CAPACITIES; TRANSMISSION GRIDS; TRANSMISSION INVESTMENTS; TRANSMISSION TECHNOLOGIES;

EID: 79952068362     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2011.01.012     Document Type: Article
Times cited : (58)

References (29)
  • 1
    • 79952073149 scopus 로고    scopus 로고
    • Cigré WG B1.07, 2007. Statistics of AC underground cables in power networks, Cigré Technical Brochure.
    • Cigré WG B1.07, 2007. Statistics of AC underground cables in power networks, Cigré Technical Brochure.
    • (2007)
  • 2
    • 79952073728 scopus 로고    scopus 로고
    • Cigré WG B2.13, 2008. Guidelines for increased utilization of existing overhead transmission lines, Cigré Technical Brochure.
    • Cigré WG B2.13, 2008. Guidelines for increased utilization of existing overhead transmission lines, Cigré Technical Brochure.
    • (2008)
  • 3
    • 70350323690 scopus 로고    scopus 로고
    • High voltage direct current: from large-scale power transmission to flexible transmission systems. IEEE Industrial Electronics Magazine, September 2009
    • Cole, S., Belmans, R., 2009. High voltage direct current: from large-scale power transmission to flexible transmission systems. IEEE Industrial Electronics Magazine, September 2009, pp. 19-24.
    • (2009) , pp. 19-24
    • Cole, S.1    Belmans, R.2
  • 4
    • 33847181247 scopus 로고    scopus 로고
    • Technical developments for the future transmission grid
    • Proceedings of the International Conference on Future Power Systems, Amsterdam, the Netherlands.
    • Cole, S., Van Hertem, D., Meeus, L., Belmans, R., 2005. Technical developments for the future transmission grid. In: Proceedings of the International Conference on Future Power Systems, Amsterdam, the Netherlands.
    • (2005)
    • Cole, S.1    Van Hertem, D.2    Meeus, L.3    Belmans, R.4
  • 5
    • 78049287957 scopus 로고    scopus 로고
    • Council of the European Union
    • Council Recommendation of 12 July 1999 on the limitation of exposure of the general public to electromagnetic fields (0-300GHz) (1999/519/EC).
    • Council of the European Union, 1999. Council Recommendation of 12 July 1999 on the limitation of exposure of the general public to electromagnetic fields (0-300GHz) (1999/519/EC).
    • (1999)
  • 6
    • 72149118893 scopus 로고    scopus 로고
    • Deutsche Energie-Agentur (DENA)
    • Planning of the grid integration of wind energy in Germany onshore and offshore up to the year 2020 (Dena Grid study), English Summary.
    • Deutsche Energie-Agentur (DENA), 2005. Planning of the grid integration of wind energy in Germany onshore and offshore up to the year 2020 (Dena Grid study), English Summary.
    • (2005)
  • 7
    • 79952070277 scopus 로고    scopus 로고
    • Deutsche Energie-Agentur (DENA)
    • dena-Netzstudie II-Integration erneuerbarer Energien in die deutsche Stromversorgung im Zeitraum 2015-2020 mit Ausblick 2025, Zusammenfassung.
    • Deutsche Energie-Agentur (DENA), 2010. dena-Netzstudie II-Integration erneuerbarer Energien in die deutsche Stromversorgung im Zeitraum 2015-2020 mit Ausblick 2025, Zusammenfassung.
    • (2010)
  • 8
    • 79952072318 scopus 로고    scopus 로고
    • Electricity Networks Strategy Group, 2009. Our Electricity Transmission Network: A Vision for 2020, Full Report. Online available at: 〈〉
    • Electricity Networks Strategy Group, 2009. Our Electricity Transmission Network: A Vision for 2020, Full Report. Online available at: 〈〉. http://www.ensg.gov.uk/assets/ensg_transmission_pwg_full_report_final_issue_1.pdf.
  • 9
    • 79952070046 scopus 로고    scopus 로고
    • Energinet.dk, 2008. More undergrounding in power system expansion. News article, 5 November 2008. Online available at.
    • Energinet.dk, 2008. More undergrounding in power system expansion. News article, 5 November 2008. Online available at: http://www.energinet.dk/en/menu/News/News/News.htm.
    • (2008)
  • 10
    • 79952071650 scopus 로고    scopus 로고
    • Eurelectric, 2006. EMF exposure standards applicable in Europe and elsewhere-Environment & Society Working Group. Ref: 2006-450-0006.
    • Eurelectric, 2006. EMF exposure standards applicable in Europe and elsewhere-Environment & Society Working Group. Ref: 2006-450-0006.
    • (2006)
  • 11
    • 79952071908 scopus 로고    scopus 로고
    • European Commission - DG Competition, 2007. Report on the energy sector inquiry, Part 2, SEC 1724.
    • European Commission - DG Competition, 2007. Report on the energy sector inquiry, Part 2, SEC(2006)1724.
    • (2008)
  • 12
    • 0003510680 scopus 로고    scopus 로고
    • European Commission
    • Trans-European energy networks: policy and actions of the EC
    • European Commission, 1997. Trans-European energy networks: policy and actions of the EC.
    • (1997)
  • 13
    • 0003510680 scopus 로고    scopus 로고
    • European Commission
    • Undergrounding of electricity lines in Europe. Background paper, Brussels, Belgium.
    • European Commission, 2003. Undergrounding of electricity lines in Europe. Background paper, Brussels, Belgium.
    • (2003)
  • 14
    • 0003510680 scopus 로고    scopus 로고
    • European Commission
    • Inquiry pursuant to Article 17 of Regulation (EC) no 1/2003 into the European gas and electricity sectors (final report)-priority interconnection plan.
    • European Commission, 2007a. Inquiry pursuant to Article 17 of Regulation (EC) no 1/2003 into the European gas and electricity sectors (final report)-priority interconnection plan.
    • (2007)
  • 15
    • 0003510680 scopus 로고    scopus 로고
    • European Commission
    • Inquiry pursuant to Article 17 of Regulation (EC) no 1/2003 into the European gas and electricity sectors (final report) - priority interconnection plan - Annex.
    • European Commission, 2007b. Inquiry pursuant to Article 17 of Regulation (EC) no 1/2003 into the European gas and electricity sectors (final report) - priority interconnection plan - Annex.
    • (2007)
  • 16
    • 0003510680 scopus 로고    scopus 로고
    • European Commission
    • Table congestion revenues. Online available at: 〈〉
    • European Commission, 2009. Table congestion revenues. Online available at: 〈〉. http://ec.europa.eu/energy/gas_electricity/consultations/doc/2009_02_28_tso_revenues.pdf.
    • (2009)
  • 17
    • 77952680996 scopus 로고    scopus 로고
    • European Commission
    • Energy 2020A strategy for competitive, sustainable and secure energy, COM(2010) 639 final, Brussels, November 2010.
    • European Commission, 2010a, Energy 2020A strategy for competitive, sustainable and secure energy, COM(2010) 639 final, Brussels, November 2010.
    • (2010)
  • 18
    • 77952680996 scopus 로고    scopus 로고
    • European Commission
    • Energy infrastructure priorities for 2020 and beyond-a blueprint for an integrated European energy network, COM(2010) 677 final, Brussels, November 2010.
    • European Commission, 2010b, Energy infrastructure priorities for 2020 and beyond-a blueprint for an integrated European energy network, COM(2010) 677 final, Brussels, November 2010.
    • (2010)
  • 19
    • 85013811725 scopus 로고    scopus 로고
    • European Network of Transmission Operators for Electricity (ENTSO-E)
    • Ten-year network development plan 2010-2020. Available at.
    • European Network of Transmission Operators for Electricity (ENTSO-E), 2010. Ten-year network development plan 2010-2020. Available at: http://www.entsoe.eu/index.php?id=232.
    • (2010)
  • 20
    • 79952070930 scopus 로고    scopus 로고
    • European Transmission System Operators (ETSO)
    • Overview of the administrative procedures for constructing 110kV to 400kV overhead lines.
    • European Transmission System Operators (ETSO), 2006. Overview of the administrative procedures for constructing 110kV to 400kV overhead lines.
    • (2006)
  • 21
    • 36348948656 scopus 로고    scopus 로고
    • Planning and operational issues arising from the widespread use of HTLS conductors
    • Exposito A.G., Santos J.R., Cruz Romero P. Planning and operational issues arising from the widespread use of HTLS conductors. IEEE Transactions on Power Systems 2007, 22(4):1446-1455.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 1446-1455
    • Exposito, A.G.1    Santos, J.R.2    Cruz Romero, P.3
  • 22
    • 51849158831 scopus 로고    scopus 로고
    • International Energy Agency (IEA)
    • World Energy Outlook 2008, Paris, France.
    • International Energy Agency (IEA), 2008. World Energy Outlook 2008, Paris, France.
    • (2008)
  • 23
    • 79952069640 scopus 로고    scopus 로고
    • KEMA Consulting
    • Analysis of the network capacities and possible congestion of the electricity transmission networks within the accession countries. Report prepared for European Commission DG TREN, Bonn, Germany.
    • KEMA Consulting, 2005. Analysis of the network capacities and possible congestion of the electricity transmission networks within the accession countries. Report prepared for European Commission DG TREN, Bonn, Germany.
    • (2005)
  • 25
    • 79952071132 scopus 로고    scopus 로고
    • Niedersächsische Landtag
    • Niedersächsisches Erdkabelgesetz, Nds.GVBl. Nr.40/2007S.709. Online available at: 〈〉
    • Niedersächsische Landtag, 2007. Niedersächsisches Erdkabelgesetz, Nds.GVBl. Nr.40/2007S.709. Online available at: 〈〉. http://www.netzausbauniedersachsen.de/00000099a20f0ea04/00000099b50b79201/index.html.
    • (2007)
  • 26
    • 79952072875 scopus 로고    scopus 로고
    • US Congress, 2005. Energy Policy Act of 2005, H.R. 6, 109 Congress, 58th Session.
    • US Congress, 2005. Energy Policy Act of 2005, H.R. 6, 109 Congress, 58th Session.
    • (2005)
  • 27
    • 79952071303 scopus 로고    scopus 로고
    • The use of power flow controlling devices in the liberalized market. Ph.D. dissertation, Katholieke Universiteit Leuven.
    • Van Hertem, D., 2009. The use of power flow controlling devices in the liberalized market. Ph.D. dissertation, Katholieke Universiteit Leuven.
    • (2009)
    • Van Hertem, D.1
  • 28
    • 33847219642 scopus 로고    scopus 로고
    • Power flow control devices: an overview of their working principles and their application range. In: Proceedings of the International Conference on Future Power Systems, Amsterdam, the Netherlands.
    • Van Hertem, D., Verboomen, J., Belmans, R., Kling, W., 2005. Power flow control devices: an overview of their working principles and their application range. In: Proceedings of the International Conference on Future Power Systems, Amsterdam, the Netherlands.
    • (2005)
    • Van Hertem, D.1    Verboomen, J.2    Belmans, R.3    Kling, W.4
  • 29
    • 33847212816 scopus 로고    scopus 로고
    • FACTS and HVDC technologies for the development of future power systems. In: Proceedings of the International Conference on Future Power Systems.
    • Zhang, X.-P., Yao, L., Chong, B., Sasse, C., Godfrey, K.R., 2005. FACTS and HVDC technologies for the development of future power systems. In: Proceedings of the International Conference on Future Power Systems.
    • (2005)
    • Zhang, X.-P.1    Yao, L.2    Chong, B.3    Sasse, C.4    Godfrey, K.R.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.