Delay mitigation in the Malaysian construction industry
-
Abdul-Rahman H, Berawi MA, Berawi AR, Mohamed O, Othman M, Yahya IA (2006). Delay mitigation in the Malaysian construction industry. J. Construct. Eng. Manage., 132(2): 125-133.
-
(2006)
J. Construct. Eng. Manage
, vol.132
, Issue.2
, pp. 125-133
-
-
Abdul-Rahman, H.1
Berawi, M.A.2
Berawi, A.R.3
Mohamed, O.4
Othman, M.5
Yahya, I.A.6
-
2
-
-
27644463257
-
Delays in construction: A brief study of the Florida construction industry
-
Clemson University, Clemson, SC
-
Ahmed SM, Azhar S, Kappagntula P, Gollapudial D (2003). Delays in construction: A brief study of the Florida construction industry. Proceeding of the 39th Annual ASC Conference, Clemson University, Clemson, SC, pp. 257-266.
-
(2003)
Proceeding of the 39th Annual ASC Conference
, pp. 257-266
-
-
Ahmed, S.M.1
Azhar, S.2
Kappagntula, P.3
Gollapudial, D.4
-
3
-
-
0036836295
-
The effects of construction delays on project delivery in Nigerian construction industry
-
Aibinu AA, Jagboro GO (2002). The effects of construction delays on project delivery in Nigerian construction industry. Int. J. Project Manage., 20: 593-599.
-
(2002)
Int. J. Project Manage
, vol.20
, pp. 593-599
-
-
Aibinu, A.A.1
Jagboro, G.O.2
-
4
-
-
0033118345
-
Delays in public utility projects in Saudi Arabia
-
Al-Khalil MI, Al-Ghafly MA (1999). Delays in public utility projects in Saudi Arabia. Int. J. Project Manage., 17(2): 101-106.
-
(1999)
Int. J. Project Manage
, vol.17
, Issue.2
, pp. 101-106
-
-
Al-Khalil, M.I.1
Al-Ghafly, M.A.2
-
6
-
-
33645965860
-
Causes of delay in large construction projects
-
Assaf SA, Al-Hejji S (2006). Causes of delay in large construction projects. Int. J. Project Manage., 24: 349-357.
-
(2006)
Int. J. Project Manage
, vol.24
, pp. 349-357
-
-
Assaf, S.A.1
Al-Hejji, S.2
-
7
-
-
0242411552
-
Construction delay claims
-
New York: John Wiley
-
Bramble B, Callahan MT (1987). Construction delay claims. New York: John Wiley, pp.11-32.
-
(1987)
, pp. 11-32
-
-
Bramble, B.1
Callahan, M.T.2
-
8
-
-
0002245875
-
Measurement of scheduling of construction time and cost performance in the building industry
-
Bromilow FJ (1974). Measurement of scheduling of construction time and cost performance in the building industry. The Chartered Builder, 10: 1-7.
-
(1974)
The Chartered Builder
, vol.10
, pp. 1-7
-
-
Bromilow, F.J.1
-
10
-
-
79951926603
-
The importance of payment in the construction industry
-
Construction Industry Working Group on Payment (WG10)
-
Construction Industry Working Group on Payment (WG10) (2007). The importance of payment in the construction industry. Report on Enactment of Construction Industry Payment and Adjudication Act (CIPAA), 2: 1-16.
-
(2007)
Report on Enactment of Construction Industry Payment and Adjudication Act (CIPAA)
, vol.2
, pp. 1-16
-
-
-
11
-
-
33751267988
-
Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana
-
Frimpong Y, Oluwoye J (2003). Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. J. Construct. Res., 1 (2): 175-187.
-
(2003)
J. Construct. Res
, vol.1
, Issue.2
, pp. 175-187
-
-
Frimpong, Y.1
Oluwoye, J.2
-
12
-
-
0004153943
-
Modern construction management
-
(5th ed.). United Kingdom: Blackwell Science Ltd
-
Harris F, McCaffer R (2003). Modern construction management (5th ed.). United Kingdom: Blackwell Science Ltd, pp. 25-41.
-
(2003)
, pp. 25-41
-
-
Harris, F.1
McCaffer, R.2
-
13
-
-
0039997969
-
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
-
Kaming P, Olomolaiye P, Holt G, Harris F (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construct. Manage. Econ., 15: 83-94.
-
(1997)
Construct. Manage. Econ
, vol.15
, pp. 83-94
-
-
Kaming, P.1
Olomolaiye, P.2
Holt, G.3
Harris, F.4
-
14
-
-
79951894090
-
Market watch: Construction industry. Kuala Lumpur Exhibition Center Report
-
MALBEX
-
MALBEX (2005). Market watch: Construction industry. Kuala Lumpur Exhibition Center Report. Kuala Lumpur, pp. 1-8.
-
(2005)
Kuala Lumpur
, pp. 1-8
-
-
-
15
-
-
0000725583
-
Causes of delay and cost overruns in Nigerian construction projects
-
Mansfield NR, Ugwu OO, Doran T (1994). Causes of delay and cost overruns in Nigerian construction projects. Int. J. Project Manage., 12 (4): 254-260.
-
(1994)
Int. J. Project Manage
, vol.12
, Issue.4
, pp. 254-260
-
-
Mansfield, N.R.1
Ugwu, O.O.2
Doran, T.3
-
16
-
-
34248402903
-
Causes and effects of delays in Malaysian construction industry
-
Sambasivan M, Yau WS (2007). Causes and effects of delays in Malaysian construction industry. Int. J. Project Manage., 25: 517-526.
-
(2007)
Int. J. Project Manage
, vol.25
, pp. 517-526
-
-
Sambasivan, M.1
Yau, W.S.2
-
17
-
-
0031109413
-
Project risk management in Hong Kong
-
Shen LY (1997). Project risk management in Hong Kong. Int. J. Project Manage., 15: 101-105.
-
(1997)
Int. J. Project Manage
, vol.15
, pp. 101-105
-
-
Shen, L.Y.1
-
18
-
-
33748627930
-
An analysis of the distribution of cost variance for building projects
-
Shen LY, Fisher N, Sun CS (2001). An analysis of the distribution of cost variance for building projects. J. Constr. Res., 2: 35-40.
-
(2001)
J. Constr. Res
, vol.2
, pp. 35-40
-
-
Shen, L.Y.1
Fisher, N.2
Sun, C.S.3
-
19
-
-
68649106829
-
Factors Affecting Contractor Performance
-
CEM Department, KFUPM, Dhahran, Saudi Arabia
-
Ubaid AG (1991). Factors affecting contractor performance. Master thesis. CEM Department, KFUPM, Dhahran, Saudi Arabia, pp. 68-105.
-
(1991)
Master thesis
, pp. 68-105
-
-
Ubaid, A.G.1
|