메뉴 건너뛰기




Volumn , Issue , 2010, Pages 829-834

Generation reliability assessment in power markets using game theory and MCS

Author keywords

Game theory; Generation reliability; Monte Carlo simulation; Power market

Indexed keywords

FORCED OUTAGES; GENERATION RELIABILITY; IEEE-RELIABILITY TEST SYSTEM; LOSS OF LOAD EXPECTATION; MONTE CARLO SIMULATION; NON-COOPERATIVE; POWER MARKET; POWER MARKETS; POWER SYSTEMS RELIABILITY; RELIABILITY EVALUATION; RELIABILITY INDEX; STOCHASTIC BEHAVIOR;

EID: 79951803947     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PECON.2010.5697694     Document Type: Conference Paper
Times cited : (3)

References (17)
  • 4
    • 0033899457 scopus 로고    scopus 로고
    • Electric Sector Restructuring in Italy
    • L. Salvaderi, Electric Sector Restructuring in Italy, IEEE Power Engineering Review, Vol. 20, No. 4, 2000, pp. 12-16.
    • (2000) IEEE Power Engineering Review , vol.20 , Issue.4 , pp. 12-16
    • Salvaderi, L.1
  • 6
    • 85008024210 scopus 로고    scopus 로고
    • Assessment of Deregulation and Competition
    • E. L. Draper, Assessment of Deregulation and Competition, IEEE Power Engineering Review, Vol. 18, No. 7, 1998, pp. 17-18.
    • (1998) IEEE Power Engineering Review , vol.18 , Issue.7 , pp. 17-18
    • Draper, E.L.1
  • 7
    • 0035251474 scopus 로고    scopus 로고
    • Restructuring and Reregulation of the US Electric Utility Industry
    • H. B.Puttgen, D. R. Volzka, M. I. Olken, Restructuring and Reregulation of The US Electric Utility Industry. IEEE Power Engineering Review, Vol. 21, No. 2, 2001, pp. 8-10.
    • (2001) IEEE Power Engineering Review , vol.21 , Issue.2 , pp. 8-10
    • Puttgen, H.B.1    Volzka, D.R.2    Olken, M.I.3
  • 12
    • 23844516120 scopus 로고    scopus 로고
    • Reliability Optimization Using Ant Colony Algorithm under Performance and Cost Constraints
    • doi:10.1016/j.epsr.2005.02.008
    • R. Meziane, Y. Massim, A. Zeblah, A. Ghoraf, R. Rahli, Reliability Optimization Using Ant Colony Algorithm Under Performance and Cost Constraints, Electric Power System Research journal, doi:10.1016/j.epsr.2005.02.008, Vol. 76, 2005, pp. 1-8.
    • (2005) Electric Power System Research Journal , vol.76 , pp. 1-8
    • Meziane, R.1    Massim, Y.2    Zeblah, A.3    Ghoraf, A.4    Rahli, R.5
  • 17
    • 0018544097 scopus 로고
    • Reliability Test System Task Force of the IEEE Subcommittee on the application of probability Methods
    • Nov/Dec
    • Reliability Test System Task Force of The IEEE Subcommittee on the application of probability Methods, IEEE Reliability Test System, IEEE Transactions, Pas-98, No.6, Nov/Dec 1979, pp. 2047-2054.
    • (1979) IEEE Reliability Test System, IEEE Transactions , vol.PAS-98 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.