메뉴 건너뛰기




Volumn 17, Issue 4, 2010, Pages 319-333

Heuristic approach to workforce scheduling with combined safety and productivity objective

Author keywords

Hazard exposure reduction; Job rotation; Optimization; Safety; Workforce scheduling

Indexed keywords

ACCIDENT PREVENTION; HAZARDS; HEURISTIC METHODS; OPTIMIZATION; PERSONNEL; PRODUCTIVITY; SCHEDULING;

EID: 79951687035     PISSN: 10724761     EISSN: 1943670X     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (23)

References (20)
  • 8
    • 38249020984 scopus 로고
    • Lower bounds and reduction procedure for the bin packing problem
    • Martello, S. and Toth, P. (1990a). Lower Bounds and Reduction Procedure for the Bin Packing Problem. Discrete Mathematics, 28:59-70.
    • (1990) Discrete Mathematics , vol.28 , pp. 59-70
    • Martello, S.1    Toth, P.2
  • 11
    • 79951716600 scopus 로고    scopus 로고
    • Evaluating the effect of work period length on noise exposure reduction by the daily work assignment model
    • Nanthavanij, S. and Yenradee, P. (2000). Evaluating the Effect of Work Period Length on Noise Exposure Reduction by the Daily Work Assignment Model. Industrial Engineering Research, 1(2):146-163.
    • (2000) Industrial Engineering Research , vol.1 , Issue.2 , pp. 146-163
    • Nanthavanij, S.1    Yenradee, P.2
  • 15
    • 84955279995 scopus 로고    scopus 로고
    • Scheduling problems in the airline industry
    • In:, edited by J. Y-T. Leung, Chapman & Hall, Boca Raton
    • Qi, X., Yang, J., and Yu, G. (2004). Scheduling Problems in the Airline Industry. In: Handbook of Scheduling: Algorithms, Models, and Performance Analysis (edited by J. Y-T. Leung), Chapman & Hall, Boca Raton, pp. 50-1-50-21.
    • (2004) Handbook of Scheduling: Algorithms, Models, and Performance Analysis , pp. 501-5021
    • Qi, X.1    Yang, J.2    Yu, G.3
  • 18
    • 79951718152 scopus 로고    scopus 로고
    • Ph. D. dissertation, Industrial Engineering Program, Sirindhorn International Institute of Technology, Thammasat University, Thailand
    • Yaoyuenyong, S. (2006). Algorithms for the Safety-based Workforce Scheduling Problems. Ph. D. dissertation, Industrial Engineering Program, Sirindhorn International Institute of Technology, Thammasat University, Thailand.
    • (2006) Algorithms for the Safety-based Workforce Scheduling Problems
    • Yaoyuenyong, S.1
  • 19
    • 33751193701 scopus 로고    scopus 로고
    • Hybrid procedure to determine optimal workforce without noise hazard exposure
    • Yaoyuenyong, S. and Nanthavanij, S. (2006). Hybrid Procedure to Determine Optimal Workforce without Noise Hazard Exposure. Computers and Industrial Engineering, 51:743-764.
    • (2006) Computers and Industrial Engineering , vol.51 , pp. 743-764
    • Yaoyuenyong, S.1    Nanthavanij, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.