Volumn , Issue , 2010, Pages 3472-3481

Modeling and simulating supply chain schedule risk

Author keywords

[No Author keywords available]

Indexed keywords

DISCRETE EVENTS; RISK FACTORS; RISK SCENARIOS; SUPPLY CHAIN PERFORMANCE; SUPPLY-CHAIN DISRUPTIONS;

EID: 79951595597     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2010.5679036     Document Type: Conference Paper
Times cited : (16)

References (9)
  • 1
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • Daniels, R.L., and P. Kouvelis. 1995. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Science 41(2):363-376.
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 2
    • 33846664276 scopus 로고    scopus 로고
    • Risk management in supply networks using monte-carlo simulation
    • ed. M. E. Kuhl, N. M. Steiger, F. B. Armstrong and J. A. Joines, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Deleris, L. A., and F. Erhun. 2005. Risk management in supply networks using monte-carlo simulation. In Proceedings of the 2005 Winter Simulation Conference, ed. M. E. Kuhl, N. M. Steiger, F. B. Armstrong and J. A. Joines, 1643-1649. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2005) Proceedings of the 2005 Winter Simulation Conference , pp. 1643-1649
    • Deleris, L.A.1    Erhun, F.2
  • 3
    • 0019585243 scopus 로고
    • A Review of Production Scheduling
    • Graves, S. C. 1981. A Review of Production Scheduling. Operations Research 29 (4):646-675.
    • (1981) Operations Research , vol.29 , Issue.4 , pp. 646-675
    • Graves, S.C.1
  • 4
    • 0035399558 scopus 로고    scopus 로고
    • Integrated probabilistic schedules and estimates from project simulated data
    • DOI 10.1080/01446190010022677
    • Isidore, L.J., W.E. Back, and G.T. Fry. 2001. Integrated probabilistic schedules and estimates from project simulated data. Construction Management & Economics 19(4):417-426. (Pubitemid 32548459)
    • (2001) Construction Management and Economics , vol.19 , Issue.4 , pp. 417-426
    • Isidore, L.J.1    Back, W.E.2    Fry, G.T.3
  • 5
    • 1642560614 scopus 로고    scopus 로고
    • How to conduct a successful simulation study
    • ed. S. Chick, J. Sanchez, D. Ferrin, and D.J. Morrice, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Law, A. 2003. How to conduct a successful simulation study. In Proceedings of the 2003 Winter Simulation Conference, ed. S. Chick, J. Sanchez, D. Ferrin, and D.J. Morrice, 66-70. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 66-70
    • Law, A.1
  • 7
    • 77951560561 scopus 로고    scopus 로고
    • Quantifying supply chain disruption risk using Monte Carlo and discrete-event simulation
    • ed. M. D. Rossetti, R. R. Hill, B. Johansson, A. Dunkin, and R. G. Ingalls, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Schmitt, A. J., and M. Singh. 2009a. Quantifying supply chain disruption risk using Monte Carlo and discrete-event simulation. In Proceedings of the 2009 Winter Simulation Conference, ed. M. D. Rossetti, R. R. Hill, B. Johansson, A. Dunkin, and R. G. Ingalls, 1237-1248. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2009) Proceedings of the 2009 Winter Simulation Conference , pp. 1237-1248
    • Schmitt, A.J.1    Singh, M.2