메뉴 건너뛰기




Volumn , Issue , 2010, Pages

Unit commitment and risk management based on wind power penetrated system

Author keywords

Particle swarm optimization; Risk evaluation; Risk management; Short term operation; Utility function; VaR; Wind power penetrated system

Indexed keywords

BUS POWER SYSTEM; CARBON EMISSIONS; DISPATCH PROBLEMS; ENERGY SOURCE; FOSSIL ENERGY; GENERATING COMPANIES; HIGH WINDS; LARGE-SCALE WIND POWER; OPERATIONAL COSTS; OPTIMAL TRADEOFFS; PARTICLE SWARM OPTIMIZATION ALGORITHM; POWER OUT PUT; RISK EVALUATION; SHORT-TERM OPERATION; SYSTEM OPERATOR; TAX INCENTIVE; UNIT COMMITMENTS; UTILITY FUNCTIONS; VALUE AT RISK; VAR; WIND ENERGY; WIND SPEED;

EID: 78751562951     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/POWERCON.2010.5666520     Document Type: Conference Paper
Times cited : (5)

References (20)
  • 4
    • 43549121704 scopus 로고    scopus 로고
    • Tradeoff between Risk and Cost in Economic Dispatch Including Wind Power Penetration Using Particle Swarm Optimization
    • C
    • Lingfeng Wang, Chanan Singh, Tradeoff Between Risk and Cost in Economic Dispatch Including Wind Power Penetration Using Particle Swarm Optimization[C], 2006 International Conference on Power System Technology
    • 2006 International Conference on Power System Technology
    • Wang, L.1    Singh, C.2
  • 6
    • 67650389898 scopus 로고
    • Optimization of priority lists for a unit commitment program
    • C
    • Burns R.M., Gibson CA Optimization of priority lists for a unit commitment program[C]. Proc. IEEE PES Summer Meeting, 1975,1:453-1 1975
    • (1975) Proc. IEEE PES Summer Meeting, 1975 , vol.1 , pp. 453-461
    • Burns, R.M.1    Gibson, C.A.2
  • 7
    • 0029356616 scopus 로고
    • Short-term generation scheduling with transmission and environmental constraints using a augmented Lagranian relaxation
    • J
    • Wang S.J., Shahidehpour M., Kirschen D.S., et al. Short-term generation scheduling with transmission and environmental constraints using a augmented Lagranian relaxation[J]. IEEE Trans. On Power Systems, 1995, 10(3):1294-1301
    • (1995) IEEE Trans. On Power Systems , vol.10 , Issue.3 , pp. 1294-1301
    • Wang, S.J.1    Shahidehpour, M.2    Kirschen, D.S.3
  • 9
    • 84938165404 scopus 로고
    • Generation unit commitment by dynamic programming
    • J
    • Lowery P.G., Generation unit commitment by dynamic programming[J]. IEEE Trans. on Power Systems, 1966,422-426
    • (1966) IEEE Trans. on Power Systems , pp. 422-426
    • Lowery, P.G.1
  • 11
    • 0030082567 scopus 로고    scopus 로고
    • Petridis VA genetic algorithm solution to the unit commitment problem
    • J
    • Kazarlis SA, Bakirtzis AG., Petridis VA genetic algorithm solution to the unit commitment problem[J]. IEEE Trans. on Power Systems, 1996,11(1): 29-36
    • (1996) IEEE Trans. on Power Systems , vol.11 , Issue.1 , pp. 29-36
    • Kazarlis, S.A.1    Bakirtzis, A.G.2
  • 14
    • 84938165404 scopus 로고
    • Generation unit commitment by dynamic programming
    • J
    • Lowery P.G., Generation unit commitment by dynamic programming[J]. IEEE Trans. on Power Systems, 1966,422-426
    • (1966) IEEE Trans. on Power Systems , pp. 422-426
    • Lowery, P.G.1
  • 15
    • 42749087557 scopus 로고    scopus 로고
    • Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization
    • J, doi:10.1016/j.epsr.2007.12.005
    • L. Wang, C. Singh, Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization[J], Electr. Power Syst. Res. (2008), doi:10.1016/j.epsr.2007.12.005
    • (2008) Electr. Power Syst. Res.
    • Wang, L.1    Singh, C.2
  • 16
    • 28244485444 scopus 로고    scopus 로고
    • Economic Dispatch Model with Fuzzy Wind Constraints and Attitudes of Dispatchers
    • J NOVEMBER
    • Vladimiro Miranda, Pun Sio Hang.Economic Dispatch Model With Fuzzy Wind Constraints and Attitudes of Dispatchers[J].IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 20, NO. 4, NOVEMBER 2005 :2143-2145
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 2143-2145
    • Miranda, V.1    Hang, P.S.2
  • 20
    • 33646134589 scopus 로고    scopus 로고
    • Risk Dicision-making of Thermal Power Plant Investment Based on Utility Function
    • J
    • Guo C, Wang X, Zhang X, Risk Dicision-making of Thermal Power Plant Investment Based on Utility Function[J], Automation of Electric Power Systems. Vol.30 No.4, 11-15
    • Automation of Electric Power Systems , vol.30 , Issue.4 , pp. 11-15
    • Guo, C.1    Wang, X.2    Zhang, X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.