메뉴 건너뛰기




Volumn 18, Issue 1, 2011, Pages 13-21

Lean Six Sigma Tools for a Glovebox Glove Integrity Program

Author keywords

[No Author keywords available]

Indexed keywords


EID: 78651377694     PISSN: 18715532     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jchas.2010.03.011     Document Type: Article
Times cited : (21)

References (9)
  • 2
    • 78651366884 scopus 로고    scopus 로고
    • link verified March 24, 2010
    • link verified March 24, 2010. http://lanl.gov/orgs/adbs/lss/index.shtml.
  • 8
    • 84876142422 scopus 로고    scopus 로고
    • Retrofit of an engineered gloveport to a Los Alamos National Laboratory's Plutonium Facility glovebox, LA-UR 07-8162
    • Proceeding from WM'08
    • Rael D., Cournoyer M.E., Chunglo S.D., Vigil T.J., Schreiber S. Retrofit of an engineered gloveport to a Los Alamos National Laboratory's Plutonium Facility glovebox, LA-UR 07-8162. J. Am. Soc. Mech. Eng. 2008.
    • (2008) J. Am. Soc. Mech. Eng.
    • Rael, D.1    Cournoyer, M.E.2    Chunglo, S.D.3    Vigil, T.J.4    Schreiber, S.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.