메뉴 건너뛰기




Volumn 6, Issue 12, 2010, Pages 4099-4108

A novel hybrid evolutionary algorithm for the integrated model of collaborative planning and scheduling with tasks dividable

Author keywords

Collaborative Planning; Hybrid Algorithm; Integrated Model; Job shop Scheduling

Indexed keywords

COLLABORATIVE OPTIMIZATION; COLLABORATIVE PLANNING; CONTINUOUS OPTIMIZATION; DIFFERENTIAL EVOLUTION ALGORITHMS; DISCRETE OPTIMIZATION; DISCRETE PROBLEMS; ENCODING SCHEMES; HYBRID ALGORITHMS; HYBRID EVOLUTIONARY ALGORITHM; INTEGRATED MODELS; JOB-SHOP SCHEDULING; OUTSOURCE; PROCESSING CAPACITIES; PROCESSING COSTS; PRODUCTION PLANNING AND SCHEDULING;

EID: 78651364384     PISSN: 15539105     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (1)

References (8)
  • 1
    • 0000429764 scopus 로고
    • An integrated model for job-shop planning and scheduling
    • J. B. Lasserre. An integrated model for job-shop planning and scheduling. Management Science. 1992, 38(8).
    • (1992) Management Science , vol.38 , Issue.8
    • Lasserre, J.B.1
  • 2
    • 0036704848 scopus 로고    scopus 로고
    • Research of integrated planning and scheduling based on hierarchy scheduling model
    • (in Chinese)
    • Lin Hui-ping, Fan Yu-shun, Wu Cheng. Research of Integrated Planning and Scheduling Based on Hierarchy Scheduling Model (in Chinese). Computer Integrated Manufacturing Systems. 2002, 8(8).
    • (2002) Computer Integrated Manufacturing Systems , vol.8 , Issue.8
    • Lin, H.-P.1    Fan, Y.-S.2    Wu, C.3
  • 3
    • 33644637450 scopus 로고    scopus 로고
    • Integrated optimization modeling of production planning & scheduling for batch production
    • (in Chinese)
    • Shang Wen-li, Fan Yu-shun. Integrated optimization modeling of production planning & scheduling for batch production (in Chinese). Computer Integrated Manufacturing Systems, 2005, 11(22).
    • (2005) Computer Integrated Manufacturing Systems , vol.11 , Issue.22
    • Shang, W.-L.1    Fan, Y.-S.2
  • 4
    • 33644685638 scopus 로고    scopus 로고
    • An approach for integrated scheduling and lot-sizing
    • Herbert Jodlbauer. An approach for integrated scheduling and lot-sizing. European Journal of Operational Research. 2006, 172(2).
    • (2006) European Journal of Operational Research , vol.172 , Issue.2
    • Jodlbauer, H.1
  • 5
    • 78651378355 scopus 로고    scopus 로고
    • The coordination model for supply chain with insufficient capacity under the strategy of outsourcing
    • (in Chinese)
    • Liu Xiao-chen, Yang Ai-feng. The Coordination Model for Supply Chain with Insufficient Capacity under the Strategy of Outsourcing (in Chinese). Logistics Sci-Tech, 2009, 1: 117-120.
    • (2009) Logistics Sci-Tech , vol.1 , pp. 117-120
    • Liu, X.-C.1    Yang, A.-F.2
  • 6
    • 0003853519 scopus 로고
    • Differential evolution-A simple and efficient adaptive scheme for global optimization over continuous spaces
    • Berkeley: University of California
    • Storn R., Price K. Differential evolution-A simple and efficient adaptive scheme for global optimization over continuous spaces. Berkeley: University of California, 1995.
    • (1995)
    • Storn, R.1    Price, K.2
  • 8
    • 0030242695 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using genetic algorithms-I: Representation
    • Runwei Cheng, Mitsuo Gen, Yasuhiro Tsujimura. A tutorial survey of job-shop scheduling problems using genetic algorithms-I: representation. Computers & Industrial Engineering. 1996, 30(4).
    • (1996) Computers & Industrial Engineering , vol.30 , Issue.4
    • Cheng, R.1    Gen, M.2    Tsujimura, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.