메뉴 건너뛰기




Volumn , Issue , 2010, Pages 319-322

A methodology to manage the changing requirements of a software project

Author keywords

Change management process; Changing requirements; Methodology; Software project

Indexed keywords

BUSINESS NEEDS; CHANGE CONTROL BOARDS; CHANGE MANAGEMENT PROCESS; CHANGING REQUIREMENTS; MANAGING REQUIREMENTS; METHODOLOGY; PROJECT EXECUTION; REQUIREMENTS CHANGE; SOFTWARE PROJECT; SYSTEM REQUIREMENTS; TYPICAL WORK PRODUCTS;

EID: 78651233059     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CISIM.2010.5643642     Document Type: Conference Paper
Times cited : (47)

References (13)
  • 5
    • 13844298039 scopus 로고    scopus 로고
    • An Empirical Study of Industrial Requirements Engineering Process Assessment and Improvement
    • I. Sommerville and J. Ransom, "An Empirical Study of Industrial Requirements Engineering Process Assessment and Improvement", ACM Transactions on Software Engineering and Methodology, vol. 14, no. 1, 2005, pp. 85-117.
    • (2005) ACM Transactions on Software Engineering and Methodology , vol.14 , Issue.1 , pp. 85-117
    • Sommerville, I.1    Ransom, J.2
  • 7
    • 0028518258 scopus 로고
    • When Professional Standards are Lax, the CONFIRM failure and its Lessons
    • E. Oz, "When Professional Standards are Lax, The CONFIRM failure and its Lessons", Communication of the ACM, vol.37 no.8, 1994, pp.29-43.
    • (1994) Communication of the ACM , vol.37 , Issue.8 , pp. 29-43
    • Oz, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.