메뉴 건너뛰기




Volumn 29, Issue 6, 2010, Pages 47-53

Research of an uncertainty analysis method and application to risk assessment of reservoir flood control operation

Author keywords

Latin Hypercube Sampling; Monte Carlo; Multi factors group; Risk analysis of reservoir flood control; Uncertainty analysis

Indexed keywords

ANALYSIS PROBLEMS; CONTROL OPERATIONS; LATIN HYPERCUBE SAMPLING; MONTE CARLO; MONTE CARLO SIMULATION; MULTI FACTORS; ONE-FACTOR; POTENTIAL ERRORS; UNCERTAINTY FACTORS;

EID: 78650955939     PISSN: 10031243     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (11)

References (8)
  • 1
    • 34547138953 scopus 로고    scopus 로고
    • Risk analysis for dam overtopping-feitsui reservoir as a case study
    • Jan-Tai Kuo, Ben-Chie Yen, Yung-Chia Hsu, et al. Risk analysis for dam overtopping-feitsui reservoir as a case study [J]. (ASCE) Journal of Hydraulic Engineering, 2007, 133: 955-963.
    • (2007) (ASCE) Journal of Hydraulic Engineering , vol.133 , pp. 955-963
    • Kuo, J.-T.1    Yen, B.-C.2    Hsu, Y.-C.3
  • 2
    • 27744563394 scopus 로고    scopus 로고
    • Risk analysis on overtopping for operation management of reservoir
    • (in Chinese)
    • Sun Ying, Huang Wen-Jie. Risk analysis on overtopping for operation management of reservoir [J]. Journal of Hydraulic Engineering, 2005, 36(10): 1-6. (in Chinese)
    • (2005) Journal of Hydraulic Engineering , vol.36 , Issue.10 , pp. 1-6
    • Sun, Y.1    Huang, W.-J.2
  • 3
    • 44449162079 scopus 로고    scopus 로고
    • Application study on overtopping risk analysis for Guangxi Chengbihe reservoir by Integrate-FOSM method
    • (in Chinese)
    • Mo Chongxun, Dong Zengchuan, Ma Rongyong, et al. Application study on overtopping risk analysis for Guangxi Chengbihe reservoir by Integrate-FOSM method [J]. Journal of Hydroelectric Engineering, 2008, 27(2): 44-49. (in Chinese)
    • (2008) Journal of Hydroelectric Engineering , vol.27 , Issue.2 , pp. 44-49
    • Mo, C.1    Dong, Z.2    Ma, R.3
  • 4
    • 17644361881 scopus 로고    scopus 로고
    • Risk analysis for reservoir flood forecasting system
    • (in Chinese)
    • Xu Yuying, Wang Beden. Risk analysis for reservoir flood forecasting system [J]. Hydrology, 2001, 21(2): 1-4. (in Chinese)
    • (2001) Hydrology , vol.21 , Issue.2 , pp. 1-4
    • Xu, Y.1    Wang, B.2
  • 8
    • 33747453440 scopus 로고    scopus 로고
    • Risk analysis on limited water level of reservoirs in flood season and flood control system in midstream and downstream of Yellow River
    • (in Chinese)
    • Wu Zening, Hu Cai-Hong, Wang Baoyu et al. Risk analysis on limited water level of reservoirs in flood season and flood control system in midstream and downstream of Yellow River [J]. Journal of Hydraulic Engineering, 2006, 37(6): 641-648. (in Chinese)
    • (2006) Journal of Hydraulic Engineering , vol.37 , Issue.6 , pp. 641-648
    • Wu, Z.1    Hu, C.-H.2    Wang, B.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.