메뉴 건너뛰기




Volumn 6, Issue SPECIAL ISSUE, 2010, Pages 232-240

Challenges for integrated design and delivery solutions

Author keywords

Automation; BIM; Integrated design; Process re engineering; Productivity; Skill development

Indexed keywords

BIM; BUILDING INFORMATION MODELLING; COLLABORATIVE PROCESS; INTEGRATED DESIGNS; INTEGRATED INFORMATIONS; INTEGRATED PROJECT DELIVERIES; PROCESS REENGINEERING; SKILL DEVELOPMENT;

EID: 78650504141     PISSN: 17452007     EISSN: 17527589     Source Type: Journal    
DOI: 10.3763/aedm.2010.IDDS1     Document Type: Article
Times cited : (79)

References (22)
  • 2
    • 28344443025 scopus 로고    scopus 로고
    • Anumba, C. J., Egbu, C. and Carillo, P. eds, Oxford, Wiley-Blackwell
    • Anumba, C. J., Egbu, C. and Carillo, P. (eds), 2005, Knowledge Management in Construction, Oxford, Wiley-Blackwell.
    • (2005) Knowledge Management in Construction
  • 5
    • 77954795877 scopus 로고    scopus 로고
    • Sacramento, CA, The American Institute of Architects California Council
    • Cohen, J., 2010, Integrated Project Delivery: Case Studies, Sacramento, CA, The American Institute of Architects California Council.
    • (2010) Integrated Project Delivery: Case Studies
    • Cohen, J.1
  • 9
    • 51849161652 scopus 로고    scopus 로고
    • VDC use in 2007: Significant value, dramatic growth, and apparent business opportunity
    • Stanford University, Stanford, CA, USA
    • Gilligan, B. and Kunz, J., 2007, 'VDC use in 2007: significant value, dramatic growth, and apparent business opportunity', Center for Integrated Facility Engineering Report, Stanford University, Stanford, CA, USA.
    • (2007) Center for Integrated Facility Engineering Report
    • Gilligan, B.1    Kunz, J.2
  • 10
    • 78650502033 scopus 로고    scopus 로고
    • IAI, Available at:, accessed 30 April 2010
    • IAI, 2010, International Alliance for Interoperability. Available at: www.iai-international.org/[accessed 30 April 2010].
    • (2010) International Alliance for Interoperability
  • 14
    • 67650333268 scopus 로고    scopus 로고
    • Virtual design and construction: Themes, case studies and implementation suggestions
    • Stanford University, CA
    • Kunz, J. and Fischer, M., 2009, 'Virtual design and construction: themes, case studies and implementation suggestions', CIFE Working Paper 097 Version 10, Stanford University, CA.
    • (2009) CIFE Working Paper 097 Version 10
    • Kunz, J.1    Fischer, M.2
  • 16
    • 34548037120 scopus 로고    scopus 로고
    • Mapping between the CIMsteel integration standards (CIS/2) and industry foundation classes (IFC) product model for structural steel
    • Montreal, Canada
    • Lipman, R. R., 2006, 'Mapping between the CIMsteel integration standards (CIS/2) and industry foundation classes (IFC) product model for structural steel', Proceedings of the Conference on Computing in Civil and Building Engineering, Montreal, Canada.
    • (2006) Proceedings of the Conference on Computing in Civil and Building Engineering
    • Lipman, R.R.1
  • 19
    • 61849162274 scopus 로고    scopus 로고
    • Analysis of the geometric data exchange using the IFC
    • Valencia, Spain
    • Pazlar, T. and Turk, Z., 2006, 'Analysis of the geometric data exchange using the IFC', Proceedings of EC-PPM, Valencia, Spain.
    • (2006) Proceedings of EC-PPM
    • Pazlar, T.1    Turk, Z.2
  • 20
    • 78650445913 scopus 로고    scopus 로고
    • Does integrated procurement reduce building cost and project time?
    • Salford, UK, CIB
    • Vasters, R., Prins, M. and Koppels, P. W., 2010, 'Does integrated procurement reduce building cost and project time? ', CIB World Congress 2010, Salford, UK, CIB.
    • (2010) CIB World Congress 2010
    • Vasters, R.1    Prins, M.2    Koppels, P.W.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.