메뉴 건너뛰기




Volumn 49, Issue 4, 2011, Pages 1105-1125

Three-level AHP-based heuristic approach for a multi-objective facility layout problem

Author keywords

AHP; heuristic; multi objective facility layout problem; normalisation

Indexed keywords

AHP; DECISION-MAKING PROBLEM; FACILITY LAYOUT PROBLEMS; HEURISTIC; HEURISTIC APPROACH; ILLUSTRATIVE EXAMPLES; MANUFACTURING SYSTEM; MATRIX; MULTI OBJECTIVE; MULTI-OBJECTIVE PROBLEM; NORMALISATION; NP-HARD; OBJECTIVE WEIGHT; PAIRED COMPARISON; QUADRATIC ASSIGNMENT PROBLEMS; QUALITATIVE AND QUANTITATIVE OBJECTIVES; SECOND LEVEL; THIRD LEVEL; THREE-LEVEL;

EID: 78650191215     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540903536148     Document Type: Article
Times cited : (42)

References (36)
  • 1
    • 0000970291 scopus 로고
    • A heuristic algorithm and simulation approach to relative location of facilities
    • Armour, G.C. and Buffa, E.S., 1963. A heuristic algorithm and simulation approach to relative location of facilities. Management Science, 39 (1), 294-309.
    • (1963) Management Science , vol.39 , Issue.1 , pp. 294-309
    • Armour, G.C.1    Buffa, E.S.2
  • 2
    • 0033097940 scopus 로고    scopus 로고
    • A design approach to the multi-objective facility layout problem
    • Chen, C.W. and Sha, D.Y., 1999. A design approach to the multi-objective facility layout problem. International Journal of Production Research, 37 (5), 1175-1196.
    • (1999) International Journal of Production Research , vol.37 , Issue.5 , pp. 1175-1196
    • Chen, C.W.1    Sha, D.Y.2
  • 3
    • 31744439068 scopus 로고    scopus 로고
    • Heuristic approach for solving the multi-objective facility layout problem
    • Chen, C.W. and Sha, D.Y., 2005. Heuristic approach for solving the multi-objective facility layout problem. International Journal of Production Research, 43 (21), 4493-4507.
    • (2005) International Journal of Production Research , vol.43 , Issue.21 , pp. 4493-4507
    • Chen, C.W.1    Sha, D.Y.2
  • 4
    • 0032050758 scopus 로고    scopus 로고
    • Intelligent local search strategies for solving facility layout problems with the quadratic assignment problem formulation
    • Chiang, W.C. and Chiang, C., 1998. Intelligent local search strategies for solving facility layout problems with the quadratic assignment problem formulation. European Journal of Operational Research, 106 (2-3), 457-488.
    • (1998) European Journal of Operational Research , vol.106 , Issue.2-3 , pp. 457-488
    • Chiang, W.C.1    Chiang, C.2
  • 5
    • 45949119991 scopus 로고
    • The geometric mean procedure for estimating the scale of a judgment matrix
    • Crawford, G.B., 1987. The geometric mean procedure for estimating the scale of a judgment matrix. Mathematical Modeling, 9 (3-5), 327-334.
    • (1987) Mathematical Modeling , vol.9 , Issue.3-5 , pp. 327-334
    • Crawford, G.B.1
  • 6
    • 0001490143 scopus 로고
    • A note on the analysis of subjective judgment matrices
    • Crawford, G.B. and Williams, C., 1985. A note on the analysis of subjective judgment matrices. Journal of Mathematical Psychology, 29 (4), 387-405.
    • (1985) Journal of Mathematical Psychology , vol.29 , Issue.4 , pp. 387-405
    • Crawford, G.B.1    Williams, C.2
  • 7
    • 24644480190 scopus 로고    scopus 로고
    • Multi-objective QAP solved by an explicit building block search algorithm
    • Day, R.O., Kleemen, M.P., and Lamnt, G.B., 2005. Multi-objective QAP solved by an explicit building block search algorithm. Lecture Notes in Computer Science, 3448, 91-100.
    • (2005) Lecture Notes in Computer Science , vol.3448 , pp. 91-100
    • Day, R.O.1    Kleemen, M.P.2    Lamnt, G.B.3
  • 9
    • 84952531536 scopus 로고
    • A multigoal heuristic for facilities design problems: MUGHAL
    • Dutta, K.N. and Sahu, S., 1982. A multigoal heuristic for facilities design problems: MUGHAL. International Journal of Production Research, 20 (2), 147-154.
    • (1982) International Journal of Production Research , vol.20 , Issue.2 , pp. 147-154
    • Dutta, K.N.1    Sahu, S.2
  • 14
    • 0015614063 scopus 로고
    • Facilities relative allocation technique (FRAT)
    • Khalil, T.M., 1973. Facilities relative allocation technique (FRAT). International Journal of Production Research, 11 (2), 183-194.
    • (1973) International Journal of Production Research , vol.11 , Issue.2 , pp. 183-194
    • Khalil, T.M.1
  • 15
    • 0002384937 scopus 로고
    • Assignment problems and the location of economic activities
    • Koopmans, T.C. and Beckman, M.J., 1957. Assignment problems and the location of economic activities. Econometrics, 25 (1), 53-76.
    • (1957) Econometrics , vol.25 , Issue.1 , pp. 53-76
    • Koopmans, T.C.1    Beckman, M.J.2
  • 18
    • 0001388076 scopus 로고
    • Corelap - Computerised relationship layout planning
    • Lee, R. and Moore, J.M., 1967. Corelap - computerised relationship layout planning. Journal of Industrial Engineering, 18 (3), 195-200.
    • (1967) Journal of Industrial Engineering , vol.18 , Issue.3 , pp. 195-200
    • Lee, R.1    Moore, J.M.2
  • 19
    • 33749554604 scopus 로고    scopus 로고
    • An analytical survey for the quadratic assignment problem
    • Loiola, E.M., et al., 2007. An analytical survey for the quadratic assignment problem. European Journal of Operational Research, 176 (2), 657-690.
    • (2007) European Journal of Operational Research , vol.176 , Issue.2 , pp. 657-690
    • Loiola, E.M.1
  • 20
    • 0023553923 scopus 로고
    • Computer aided facility layout selection (CAFLS) with applications to multiple criteria manufacturing planning problems
    • Malakooti, B., 1987. Computer aided facility layout selection (CAFLS) with applications to multiple criteria manufacturing planning problems. Large Scale Systems: Theory Applications, 12, 109-123.
    • (1987) Large Scale Systems: Theory Applications , vol.12 , pp. 109-123
    • Malakooti, B.1
  • 21
    • 0024700889 scopus 로고
    • Multiple objective facility layout: A heuristic to generate efficient alternatives
    • Malakooti, B., 1989. Multiple objective facility layout: a heuristic to generate efficient alternatives. International Journal of Production Research, 27 (7), 1225-1238.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1225-1238
    • Malakooti, B.1
  • 22
    • 0023287281 scopus 로고
    • Multiple objective programming for quadratic assignment problem
    • Malakooti, B. and D'souza, G., 1987. Multiple objective programming for quadratic assignment problem. International Journal of Production Research, 25 (2), 285-300.
    • (1987) International Journal of Production Research , vol.25 , Issue.2 , pp. 285-300
    • Malakooti, B.1    D'Souza, G.2
  • 23
    • 0014732625 scopus 로고
    • Four approaches to computerised layout planning
    • Muther, R. and McPherson, K., 1970. Four approaches to computerised layout planning. Industrial Engineering, 2, 39-42.
    • (1970) Industrial Engineering , vol.2 , pp. 39-42
    • Muther, R.1    McPherson, K.2
  • 24
    • 0027147950 scopus 로고
    • A linguistic pattern approach for multiple criteria facility layout problem
    • Raoot, A.D. and Rakshit, A., 1993. A linguistic pattern approach for multiple criteria facility layout problem. International Journal of Production Research, 31 (1), 203-222.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 203-222
    • Raoot, A.D.1    Rakshit, A.2
  • 25
  • 28
    • 0027593566 scopus 로고
    • Multi-criteria facility layout problem: An integrated approach
    • Shang, J.S., 1993. Multi-criteria facility layout problem: an integrated approach. European Journal of Operational Research, 66 (3), 291-304.
    • (1993) European Journal of Operational Research , vol.66 , Issue.3 , pp. 291-304
    • Shang, J.S.1
  • 30
    • 74549196326 scopus 로고    scopus 로고
    • An improved heuristic approach for multi-objective facility layout problem
    • Singh, S.P. and Singh, V.K., 2010. An improved heuristic approach for multi-objective facility layout problem. International Journal of Production Research, 48 (4), 1171-1194.
    • (2010) International Journal of Production Research , vol.48 , Issue.4 , pp. 1171-1194
    • Singh, S.P.1    Singh, V.K.2
  • 31
    • 0034886862 scopus 로고    scopus 로고
    • A new approach to the multiple objective facility layout problem
    • Sha, D.Y. and Chen, C.W., 2001. A new approach to the multiple objective facility layout problem. Integrated Manufacturing Systems, 12 (1), 59-66.
    • (2001) Integrated Manufacturing Systems , vol.12 , Issue.1 , pp. 59-66
    • Sha, D.Y.1    Chen, C.W.2
  • 34
  • 35
    • 0023558530 scopus 로고
    • A multiple criteria model for the facilities layout problem
    • Urban, T.L., 1987. A multiple criteria model for the facilities layout problem. International Journal of Production Research, 25 (12), 1805-1812.
    • (1987) International Journal of Production Research , vol.25 , Issue.12 , pp. 1805-1812
    • Urban, T.L.1
  • 36
    • 0004262181 scopus 로고
    • Combining qualitative and quantitative analysis in facility layout
    • Urban, T.L., 1989. Combining qualitative and quantitative analysis in facility layout. Production and Inventory Management, 30, 73-77.
    • (1989) Production and Inventory Management , vol.30 , pp. 73-77
    • Urban, T.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.