-
1
-
-
0034260091
-
Reliability optimization of coherent systems
-
Sep.
-
V. R. Prasad and W. Kuo, "Reliability optimization of coherent systems," IEEE Trans. Reliability, Vol. 49, no. 3, pp. 323-330, Sep. 2000.
-
(2000)
IEEE Trans. Reliability
, vol.49
, Issue.3
, pp. 323-330
-
-
Prasad, V.R.1
Kuo, W.2
-
2
-
-
0017524176
-
A heuristic method for determining optimal reliability allocation
-
Y. Nakagawa and K. Nakashima, "A heuristic method for determining optimal reliability allocation," IEEE Trans. Reliability, Vol. 26, pp. 156-161, 1977.
-
(1977)
IEEE Trans. Reliability
, vol.26
, pp. 156-161
-
-
Nakagawa, Y.1
Nakashima, K.2
-
3
-
-
0018106138
-
A note on heuristic methods in optimal system reliability
-
W. Kuo, C. L. Hwang, and F. A. Tillman, "A note on heuristic methods in optimal system reliability," IEEE Trans. Reliability, Vol. 27, pp. 320-324, 1978.
-
(1978)
IEEE Trans. Reliability
, vol.27
, pp. 320-324
-
-
Kuo, W.1
Hwang, C.L.2
Tillman, F.A.3
-
4
-
-
84904985001
-
A new heuristic algorithm for constrained redundancy-optimization in complex systems
-
S. Dinghua, "A new heuristic algorithm for constrained redundancy-optimization in complex systems," IEEE Trans. Reliability, Vol. R-36, no. 5, pp. 621-623, 1987.
-
(1987)
IEEE Trans. Reliability
, vol.R-36
, Issue.5
, pp. 621-623
-
-
Dinghua, S.1
-
5
-
-
0030108733
-
A bound heuristic algorithm for solving reliability redundancy optimization
-
L. Jianping, "A bound heuristic algorithm for solving reliability redundancy optimization," Microelectronics and Reliability, Vol. 3, no. 5, pp. 335-339, 1996.
-
(1996)
Microelectronics and Reliability
, vol.3
, Issue.5
, pp. 335-339
-
-
Jianping, L.1
-
6
-
-
0030167877
-
Reliability optimization of series-parallel systems using a genetic algorithm
-
D. W. Coit and A. E. Smith, "Reliability optimization of series-parallel systems using a genetic algorithm,"IEEE Trans. Reliability, vol. 45, no. 2, pp. 254-260, 1996.
-
(1996)
IEEE Trans. Reliability
, vol.45
, Issue.2
, pp. 254-260
-
-
Coit, D.W.1
Smith, A.E.2
-
7
-
-
0031258420
-
Structure optimization of power system with different redundant elements
-
G. Levitin, A. Lisnianski, and D. Elmakis, "Structure optimization of power system with different redundant elements," Electric Power Systems Research, Vol. 43, no. 1, pp. 19-27, 1997.
-
(1997)
Electric Power Systems Research
, vol.43
, Issue.1
, pp. 19-27
-
-
Levitin, G.1
Lisnianski, A.2
Elmakis, D.3
-
8
-
-
0038475612
-
Efficiently solving the redundancy allocation problem using tabu search
-
S. Kulturel-Konak, A. E. Smith, and D. W. Coit, "Efficiently solving the redundancy allocation problem using tabu search," IIE Trans. Reliability, Vol. 35, no. 6, pp. 515-526, 2003.
-
(2003)
IIE Trans. Reliability
, vol.35
, Issue.6
, pp. 515-526
-
-
Kulturel-Konak, S.1
Smith, A.E.2
Coit, D.W.3
-
9
-
-
4544280107
-
An ant colony optimization algorithm for the redundancy allocation problem (rap)
-
Y. C. Liang and A. E. Smith, "An ant colony optimization algorithm for the redundancy allocation problem (rap)," IEEE Trans. Reliability, Vol. 53, no. 3, pp. 417-423, 2004.
-
(2004)
IEEE Trans. Reliability
, vol.53
, Issue.3
, pp. 417-423
-
-
Liang, Y.C.1
Smith, A.E.2
-
10
-
-
0037210113
-
A linear approximation for redundant reliability problems with multiple component choices
-
Y. C. Hsieh, "A linear approximation for redundant reliability problems with multiple component choices," Computers & Industrial Engineering, Vol. 44, no. 1, pp. 91-103, 2003.
-
(2003)
Computers & Industrial Engineering
, vol.44
, Issue.1
, pp. 91-103
-
-
Hsieh, Y.C.1
-
11
-
-
3943062240
-
Redundancy allocation for series-parallel systems using a max-min approach
-
J. E. Ramirez-Marquez, D. W. Coit, and A. Konak, "Redundancy allocation for series-parallel systems using a max-min approach," IIE Trans. Reliability, Vol. 36, no. 9, pp. 891-898, 2004.
-
(2004)
IIE Trans. Reliability
, vol.36
, Issue.9
, pp. 891-898
-
-
Ramirez-Marquez, J.E.1
Coit, D.W.2
Konak, A.3
-
12
-
-
34047271087
-
Multiple weighted objectives heuristic for the redundancy allocation problem
-
Sep.
-
D. W. Coit and A. Konak, "Multiple weighted objectives heuristic for the redundancy allocation problem," IEEE Trans. Reliability, Vol. 55, no. 3, pp. 551-558, Sep. 2006.
-
(2006)
IEEE Trans. Reliability
, vol.55
, Issue.3
, pp. 551-558
-
-
Coit, D.W.1
Konak, A.2
-
13
-
-
51449091593
-
Redundancy allocation for series-parallel systems using integer linear programming
-
Sep.
-
A. Billionnet, "Redundancy allocation for series-parallel systems using integer linear programming," IEEE Trans. Reliability, Vol. 57, no. 3, pp. 507-516, Sep. 2008.
-
(2008)
IEEE Trans. Reliability
, vol.57
, Issue.3
, pp. 507-516
-
-
Billionnet, A.1
-
14
-
-
34047116848
-
Solving the redundancy allocation problem with a mix of components using the improved surrogate constraint method
-
Mar.
-
J. Onishi, S. Kimura, R. J. W. James, and Y. Nakagawa, "Solving the redundancy allocation problem with a mix of components using the improved surrogate constraint method," IEEE Trans. Reliability, Vol. 56, no. 1, pp. 94-101, Mar. 2007.
-
(2007)
IEEE Trans. Reliability
, vol.56
, Issue.1
, pp. 94-101
-
-
Onishi, J.1
Kimura, S.2
James, R.J.W.3
Nakagawa, Y.4
-
15
-
-
3242802187
-
An improved surrogate constraints method for separable nonlinear integer programming
-
Y. Nakagawa, "An improved surrogate constraints method for separable nonlinear integer programming," Journal of the Operations Research Society of Japan, Vol. 46, pp. 145-163, 2003.
-
(2003)
Journal of the Operations Research Society of Japan
, vol.46
, pp. 145-163
-
-
Nakagawa, Y.1
-
16
-
-
84937741075
-
System reliability allocation and a computational algorithm
-
D. E. Fyffe, W. W. Hines, and N. K. Lee, "System reliability allocation and a computational algorithm," IEEE Trans. Reliability, Vol. R-17, no. 2, pp. 64-69, 1968.
-
(1968)
IEEE Trans. Reliability
, vol.R-17
, Issue.2
, pp. 64-69
-
-
Fyffe, D.E.1
Hines, W.W.2
Lee, N.K.3
-
17
-
-
0014563146
-
Optimal redundancy for reliability in series system
-
P. M. Ghare and R. E. Taylor, "Optimal redundancy for reliability in series system," Operations Research, Vol. 17, no. 5, pp. 838-847, 1969.
-
(1969)
Operations Research
, vol.17
, Issue.5
, pp. 838-847
-
-
Ghare, P.M.1
Taylor, R.E.2
-
18
-
-
0017958183
-
Optimal reliability allocation by branch-and-bound techniques
-
Y. Nakagawa, K. Nakashima, and Y. Hattori, "Optimal reliability allocation by branch-and-bound techniques," IEEE Trans. Reliability, Vol. R-27, no. 1, pp. 31-38, 1978.
-
(1978)
IEEE Trans. Reliability
, vol.R-27
, Issue.1
, pp. 31-38
-
-
Nakagawa, Y.1
Nakashima, K.2
Hattori, Y.3
-
19
-
-
0025841548
-
An efficient approach for multiple criteria redundancy optimization problems
-
K. B. Misra and U. Sharma, "An efficient approach for multiple criteria redundancy optimization problems," Microelectronics and Reliability, Vol. 31, no. 2/3, pp. 303-321, 1991.
-
(1991)
Microelectronics and Reliability
, vol.31
, Issue.2-3
, pp. 303-321
-
-
Misra, K.B.1
Sharma, U.2
-
20
-
-
0019582998
-
Surrogate constraints algorithm for reliability optimization problems with two constraints
-
Y. Nakagawa and S. Miyazaki, "Surrogate constraints algorithm for reliability optimization problems with two constraints," IEEE Trans. Reliability, Vol. 30, no. 2, pp. 175-180, 1981.
-
(1981)
IEEE Trans. Reliability
, vol.30
, Issue.2
, pp. 175-180
-
-
Nakagawa, Y.1
Miyazaki, S.2
-
21
-
-
0022102715
-
Optimal allocation of redundant components for large systems
-
R. L. Bulfin and C. Y. Liu, "Optimal allocation of redundant components for large systems," IEEE Trans. Reliability, Vol. R-34, no. 3, pp. 241-247, 1985.
-
(1985)
IEEE Trans. Reliability
, vol.R-34
, Issue.3
, pp. 241-247
-
-
Bulfin, R.L.1
Liu, C.Y.2
-
22
-
-
0032671730
-
Branch and bound redundancy optimization for a series system with multiple-choice constraints
-
C. S. Sung and Y. K. Cho, "Branch and bound redundancy optimization for a series system with multiple-choice constraints," IEEE Trans. Reliability, Vol. 48, no. 2, pp. 108-117, 1999.
-
(1999)
IEEE Trans. Reliability
, vol.48
, Issue.2
, pp. 108-117
-
-
Sung, C.S.1
Cho, Y.K.2
-
23
-
-
0001510482
-
A linear programming approach to the cutting stock problem
-
P. C. Gilmore and R. E. Gomory, "A linear programming approach to the cutting stock problem," Operations Research, Vol. 9, pp. 849-859, 1961.
-
(1961)
Operations Research
, vol.9
, pp. 849-859
-
-
Gilmore, P.C.1
Gomory, R.E.2
-
24
-
-
0043064778
-
A class of combinatorial optimization problems with polynomially solvable large scale set-covering/partitioning relaxations
-
M. Minoux, "A class of combinatorial optimization problems with polynomially solvable large scale set-covering/partitioning relaxations," RAIRO - Operations Research, Vol. 21, pp. 105-136, 1987.
-
(1987)
RAIRO - Operations Research
, vol.21
, pp. 105-136
-
-
Minoux, M.1
-
25
-
-
0028433926
-
Solving binary cutting stock problems by column generation and branch-and-bound
-
P. H. Vance, C. Barnhart, E. L. Johnson, and G. L. Nemhauser, "Solving binary cutting stock problems by column generation and branch-and-bound," Computational Optimization and Applications, Vol. 3, no. 2, pp. 111-130, 1994.
-
(1994)
Computational Optimization and Applications
, vol.3
, Issue.2
, pp. 111-130
-
-
Vance, P.H.1
Barnhart, C.2
Johnson, E.L.3
Nemhauser, G.L.4
-
26
-
-
0004242486
-
-
M. E. Ball, T. L. Magnanti, C. Monna, and G. L. Nemhauser, Eds. North-Holland, Amsterdam ch. Time constrained routing and scheduling
-
J. Desrosiers, Y. Dumas, M.M. Solomon, and F. Soumis, Handbooks in Operations Research and Management Science: Networks, M. E. Ball, T. L. Magnanti, C. Monna, and G. L. Nemhauser, Eds. North-Holland, Amsterdam:, 1990, In: ch. Time constrained routing and scheduling.
-
(1990)
Handbooks in Operations Research and Management Science: Networks
-
-
Desrosiers, J.1
Dumas, Y.2
Solomon, M.M.3
Soumis, F.4
-
27
-
-
84974861930
-
The solution of massive generalized set partitioning problems in aircrew rostering
-
D. M. Ryan, "The solution of massive generalized set partitioning problems in aircrew rostering," Journal of the Operational Research Society, Vol. 43, no. 5, pp. 459-467, 1992.
-
(1992)
Journal of the Operational Research Society
, vol.43
, Issue.5
, pp. 459-467
-
-
Ryan, D.M.1
-
28
-
-
0030264417
-
An exact algorithm for ip column generation
-
F. Vanderbeck and L. A. Wolsey, "An exact algorithm for ip column generation," Operations Research Letters, Vol. 19, no. 4, pp. 151-159, 1996.
-
(1996)
Operations Research Letters
, vol.19
, Issue.4
, pp. 151-159
-
-
Vanderbeck, F.1
Wolsey, L.A.2
-
29
-
-
0000838970
-
On the computational complexity of reliability redundancy allocation in a series system
-
M. S. Chern, "On the computational complexity of reliability redundancy allocation in a series system," Operation Research Letters, Vol. 11, no. 5, pp. 309-315, 1992.
-
(1992)
Operation Research Letters
, vol.11
, Issue.5
, pp. 309-315
-
-
Chern, M.S.1
-
30
-
-
0000816725
-
Branch and price: Column generation for solving huge integer programs
-
C. Barnhart, E. L. Johnson, G. L. Nemhauser, M. W. P. Savelsbergh, and P. H. Vance, "Branch and price: Column generation for solving huge integer programs," Operations Research, Vol. 46, no. 3, pp. 316-329, 1998.
-
(1998)
Operations Research
, vol.46
, Issue.3
, pp. 316-329
-
-
Barnhart, C.1
Johnson, E.L.2
Nemhauser, G.L.3
Savelsbergh, P.M.W.4
Vance, P.H.5
-
31
-
-
0020179461
-
The average number ofsteps required by the simplex method is polynomial
-
K. H. Borgwardt, "The average number ofsteps required by the simplex method is polynomial," Mathematical Methods for OR (ZOR), Vol. 26, no. 1, pp. 157-177, 1982.
-
(1982)
Mathematical Methods for or (ZOR)
, vol.26
, Issue.1
, pp. 157-177
-
-
Borgwardt, K.H.1
|