-
1
-
-
33845290486
-
A Systematic and Cost Effective Method to Improve Distribution System Reliability
-
July Edmonton, Alberta
-
R.E. Brown, H.V. Nguyen, J.J. Burke, "A Systematic and Cost Effective Method to Improve Distribution System Reliability", In Proc. 1999 IEEE Power Engineering Society Summer Meeting, Vol. 2, pp 1037-1042, July 1999, Edmonton, Alberta.
-
(1999)
Proc. 1999 IEEE Power Engineering Society Summer Meeting
, vol.2
, pp. 1037-1042
-
-
Brown, R.E.1
Nguyen, H.V.2
Burke, J.J.3
-
2
-
-
0036118846
-
Feeder Switch Relocation for Customer Interruption Cost Minimization
-
Jan.
-
Jen-Hao Teng and Chan-Nan Lu, Feeder Switch Relocation for Customer Interruption Cost Minimization, IEEE Trans. on Power Delivery, Vol. 17, No. 1 pp. 254-259,Jan. 2002.
-
(2002)
IEEE Trans. on Power Delivery
, vol.17
, Issue.1
, pp. 254-259
-
-
Teng, J.-H.1
Lu, C.-N.2
-
3
-
-
78649572938
-
-
52 PA. CODE CH. 57, Pennsylvania Public Utility Commission, September 27
-
-, Inspection and Maintenance Standards for Electric Distribution Companies, 52 PA. CODE CH. 57, Pennsylvania Public Utility Commission, September 27, 2008, Available online: http://www.pabulletin.com/secure/data/vol38/38-39/ 1746.html
-
(2008)
Inspection and Maintenance Standards for Electric Distribution Companies
-
-
Teng, J.-H.1
Lu, C.-N.2
-
4
-
-
0025516852
-
Transformer Failure Prediction Using Bayesian Analysis
-
Nov.
-
E.M. Gulachenski, P.M. Bsuner, "Transformer Failure Prediction Using Bayesian Analysis", IEEE Trans. on Power Systems, Vol 5. No4. Nov. 1990
-
(1990)
IEEE Trans. on Power Systems
, vol.5
, Issue.4
-
-
Gulachenski, E.M.1
Bsuner, P.M.2
-
5
-
-
0038519488
-
Composite Reliability Evaluation Model for Different Types of Distribution Systems
-
May
-
Teng-Fa Tsao and Hong-Chan Chang, "Composite Reliability Evaluation Model for Different Types of Distribution Systems", IEEE Trans. on Power Systems, Vol. 18, No. 2, pp 924-930, May 2003.
-
(2003)
IEEE Trans. on Power Systems
, vol.18
, Issue.2
, pp. 924-930
-
-
Tsao, T.-F.1
Chang, H.-C.2
-
6
-
-
2542531519
-
Failure Rate Modeling Using Equipment Inspection Data
-
May
-
Richard E Brown, George Frimpong and H. Lee Willis. "Failure Rate Modeling Using Equipment Inspection Data", IEEE Trans. on Power systems, Vol. 19, No. 2, pp 782-787, May 2004.
-
(2004)
IEEE Trans. on Power Systems
, vol.19
, Issue.2
, pp. 782-787
-
-
Brown, R.E.1
Frimpong, G.2
Willis, H.L.3
-
7
-
-
7244226247
-
Modeling and Analysis of Distribution Reliability Indices
-
Oct
-
N Baligepalli, S.S. Venkata and R.D. Christie, "Modeling and Analysis of Distribution Reliability Indices", IEEE Trans. on Power Delivery, Vol. 19, No 4., pp 1950-1955, Oct 2004.
-
(2004)
IEEE Trans. on Power Delivery
, vol.19
, Issue.4
, pp. 1950-1955
-
-
Baligepalli, N.1
Venkata, S.S.2
Christie, R.D.3
-
9
-
-
67650178461
-
Optimal Reliability Allocation for Radial Distribution System with Performance Based Rate
-
Visvakumar Aravinthan, Ward Jewell, "Optimal Reliability Allocation for Radial Distribution System with Performance Based Rate", in Proc. 2008 Frontiers of Power Conference, Oklahoma State University, Stillwater, October 2008.
-
Proc. 2008 Frontiers of Power Conference, Oklahoma State University, Stillwater, October 2008
-
-
Aravinthan, V.1
Jewell, W.2
-
10
-
-
0024187649
-
Intelligent Derating for Reliability
-
August 24-26
-
Michael Pecht and Richard Cogan, "Intelligent Derating for Reliability", IEEE International Symposium on Intelligent Control, Proceedings, pp. 98-102, August 24-26, 1988.
-
(1988)
IEEE International Symposium on Intelligent Control, Proceedings
, pp. 98-102
-
-
Pecht, M.1
Cogan, R.2
-
11
-
-
78649599894
-
-
Final Project Report, T-36, Power Systems Engineering Research Center, Aug
-
M. Kezunovic , Y. Dong, W. Jewell, V. Aravinthan, and P. Dongale "Integration of Asset and Outage Management Tasks for Distribution Application", Final Project Report, T-36, Power Systems Engineering Research Center, Aug 2009.
-
(2009)
Integration of Asset and Outage Management Tasks for Distribution Application
-
-
Kezunovic, M.1
Dong, Y.2
Jewell, W.3
Aravinthan, V.4
Dongale, P.5
-
14
-
-
4043145928
-
Estimating Temperature Rise of Transformers
-
July, Available online
-
George G. Orenchak, 'Estimating Temperature Rise of Transformers', Power Electronics Technology, July 2004. Available online: http://powerelectronics. com/mag/407PET20.pdf.
-
(2004)
Power Electronics Technology
-
-
Orenchak, G.G.1
-
15
-
-
50649084108
-
On Distribution Asset Management: Development of Replacement Strategies
-
M. Begovic, J. Perkel, N. Hampton, R. Hartlein, "On Distribution Asset Management: Development of Replacement Strategies", In Proc. IEEE PES PowerAfrica 2007 Conference and Exposition, South Africa July 16-20, 2007
-
Proc. IEEE PES PowerAfrica 2007 Conference and Exposition, South Africa July 16-20, 2007
-
-
Begovic, M.1
Perkel, J.2
Hampton, N.3
Hartlein, R.4
-
17
-
-
45749147020
-
Optimal Scheme for Feeder Emergency Restoration Using Enumeration to Binary Integer Linear Programming
-
Visvakumar Aravinthan and Ward Jewell, "Optimal Scheme for Feeder Emergency Restoration Using Enumeration to Binary Integer Linear Programming", in Proc. 2007 Frontiers of Power Conference, Oklahoma State University, Stillwater, October 2007.
-
Proc. 2007 Frontiers of Power Conference, Oklahoma State University, Stillwater, October 2007
-
-
Aravinthan, V.1
Jewell, W.2
-
19
-
-
77956426316
-
-
Final Project Report,T-24, Power Systems Engineering Research Center, Aug
-
W. Jewell, J. Warner, J. McCalley, Y. Li and S.R.K. Yeddanapudi, "Risk Based Resource Allocation for Distribution System Maintenance", Final Project Report,T-24, Power Systems Engineering Research Center, Aug 2006
-
(2006)
Risk Based Resource Allocation for Distribution System Maintenance
-
-
Jewell, W.1
Warner, J.2
McCalley, J.3
Li, Y.4
Yeddanapudi, S.R.K.5
-
20
-
-
0347968133
-
A cost-effective approach of prioritizing distribution maintenance based on system reliability
-
Jan.
-
F. Li and R. Brown," A cost-effective approach of prioritizing distribution maintenance based on system reliability," IEEE Trans. Power Delivery, vol. 19, issue 1, Jan. 2004, pp. 439-441.
-
(2004)
IEEE Trans. Power Delivery
, vol.19
, Issue.1
, pp. 439-441
-
-
Li, F.1
Brown, R.2
-
21
-
-
0034186734
-
Managing the Risk of Performance Based Rates
-
May
-
Richard E Brown, "Managing the Risk of Performance Based Rates", IEEE Trans. on Power Systems, Vol. 15, No. 2, May 2000.
-
(2000)
IEEE Trans. on Power Systems
, vol.15
, Issue.2
-
-
Brown, R.E.1
-
22
-
-
0026156854
-
A Reliability Test System for Educational Purposes - Basic Distribution System Data and Results
-
May
-
R. N. Allan, R. Billiton, I. Sjarief, L. Goel, K.S. So, "A Reliability Test System for Educational Purposes - Basic Distribution System Data and Results", IEEE Trans. on Power Systems, Vol. 6, No.2, pp. 813-820 May 1991
-
(1991)
IEEE Trans. on Power Systems
, vol.6
, Issue.2
, pp. 813-820
-
-
Allan, R.N.1
Billiton, R.2
Sjarief, I.3
Goel, L.4
So, K.S.5
|