-
1
-
-
15944406166
-
Wind power development in Europe
-
Dec
-
N. Hatziargyriou and A. Zervos, "Wind power development in Europe," Proceedings of the IEEE, vol. 89, pp. 1765-1782, Dec 2001.
-
(2001)
Proceedings of the IEEE
, vol.89
, pp. 1765-1782
-
-
Hatziargyriou, N.1
Zervos, A.2
-
3
-
-
78649574124
-
-
[Online]. Available: Accessed on: 16 Oct. 2009
-
"Europe's Energy Portal." [Online]. Available: http://www.energy.eu/renewables/eu-charts/RE-in-final.html. Accessed on: 16 Oct. 2009
-
-
-
-
4
-
-
78649592749
-
-
[Online]. Available: Accessed on: Dec. 2009
-
"International Energy Agency." [Online]. Available: http://www.iea.org/. Accessed on: Dec. 2009
-
-
-
-
5
-
-
36248956735
-
Accomodating winds natural behavior
-
Nov-Dec
-
E. A. DeMeo, G. A. Jordan, C. Kalich, J. King, M. R. Milligan, C. Murley, B. Oakleaf, and M. J. Schuerger, "Accomodating winds natural behavior," IEEE Power & Energy Magazine, vol. 5, pp. 59-67, Nov-Dec 2007.
-
(2007)
IEEE Power & Energy Magazine
, vol.5
, pp. 59-67
-
-
DeMeo, E.A.1
Jordan, G.A.2
Kalich, C.3
King, J.4
Milligan, M.R.5
Murley, C.6
Oakleaf, B.7
Schuerger, M.J.8
-
6
-
-
0029252684
-
The generalized unit commitment problem
-
Feb.
-
R. Baldick, "The generalized unit commitment problem," IEEE Trans. Power Syst., vol. 10, pp. 465-475, Feb. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 465-475
-
-
Baldick, R.1
-
9
-
-
0030109655
-
Evaluation of reliability worth and value of lost load
-
Mar.
-
K. K. Kariuki and R. N. Allan, "Evaluation of reliability worth and value of lost load," Proc. Inst. Elect. Eng., Gener., Transm., Distrib., vol. 143, pp. 171-180, Mar. 1996.
-
(1996)
Proc. Inst. Elect. Eng., Gener., Transm., Distrib.
, vol.143
, pp. 171-180
-
-
Kariuki, K.K.1
Allan, R.N.2
-
10
-
-
0030107904
-
Emission constrained unit-commitment (ECUC)
-
Mar
-
T. Gjengedal, "Emission constrained unit-commitment (ECUC)," IEEE Trans. Energy Conv., vol. 11, pp. 132-138, Mar 1996.
-
(1996)
IEEE Trans. Energy Conv.
, vol.11
, pp. 132-138
-
-
Gjengedal, T.1
-
11
-
-
0032592961
-
The IEEE reliability test system - 1996
-
Aug.
-
C. Grigg, P. Wong, P. Albrecht, R. Allan, M. Bhavaraju, R. Billinton, Q. Chen, C. Fong, S. Haddad, S. Kuruganty, W. Li, R. Mukerji, D. Patton, N. Rau, D. Reppen, A. Schneider, M. Shahidehpour, and C. Singh, "The IEEE reliability test system - 1996," IEEE Trans. Power Syst., vol. 14, pp. 1010-1018, Aug. 1999.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, pp. 1010-1018
-
-
Grigg, C.1
Wong, P.2
Albrecht, P.3
Allan, R.4
Bhavaraju, M.5
Billinton, R.6
Chen, Q.7
Fong, C.8
Haddad, S.9
Kuruganty, S.10
Li, W.11
Mukerji, R.12
Patton, D.13
Rau, N.14
Reppen, D.15
Schneider, A.16
Shahidehpour, M.17
Singh, C.18
-
12
-
-
0027647348
-
Effects of ramp-rate limits on unit commitment and economic-dispatch
-
Aug.
-
C. Wang and S. M. Shahidehpour, "Effects of ramp-rate limits on unit commitment and economic-dispatch," IEEE Trans. Power Syst., vol. 8, pp. 1341-1350, Aug. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, pp. 1341-1350
-
-
Wang, C.1
Shahidehpour, S.M.2
-
14
-
-
78649574641
-
-
[Online]. Available: European Energy Exchange. Accessed on: 2 Sep. 2009
-
"EU Emission Allowances | Spot, Prices and Trading Volumes." [Online]. Available: http://www.eex.com/en/Market%20Data/Trading%20Data/ Emission%20Rights/EU%20Emission%20Allowances%20|%20Spot: European Energy Exchange. Accessed on: 2 Sep. 2009
-
EU Emission Allowances | Spot, Prices and Trading Volumes
-
-
-
15
-
-
60149087287
-
Estimating the spinning reserve requirements in systems with significant wind power generation penetration
-
Feb.
-
M. A. Ortega-Vazquez and D. S. Kirschen, "Estimating the spinning reserve requirements in systems with significant wind power generation penetration," IEEE Trans. Power Syst., vol. 24, pp. 114-124, Feb. 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, pp. 114-124
-
-
Ortega-Vazquez, M.A.1
Kirschen, D.S.2
-
16
-
-
47149085510
-
The California ISO
-
[Online]. Available: Accessed on: Jun 2008
-
"The California ISO," in Spinning Reserve Requirements. [Online]. Available: http://www.caiso.com/. Accessed on: Jun 2008
-
Spinning Reserve Requirements
-
-
-
18
-
-
78649601056
-
-
[Online]. Available: Accessed on: Nov 2009
-
"Red Eléctrica de España," in Procedimientos de operación. [Online]. Available: http://www.ree.es/operacion/pdf/po/RES- PO-1.5.pdf. Accessed on: Nov 2009
-
Procedimientos de Operación
-
-
-
19
-
-
78649595499
-
-
[Online]. Available: Accessed on: Jan 2010
-
"European Network of Transmission System Operators for Electricity." [Online]. Available: http://www.entsoe.eu/fileadmin/user- upload/-library/publications/ce/o h/Policy3-Appendix3-final.pdf. Accessed on: Jan 2010
-
-
-
-
20
-
-
78649585520
-
-
[Online]. Available: Accessed on: Nov. 2009
-
"Short-Term Operating Reserve (STOR)," in National Grid. [Online]. Available: http://www.nationalgrid.com/uk/Electricity/Balancing/ services/reserveservices/STOR/. Accessed on: Nov. 2009
-
Short-Term Operating Reserve (STOR)
-
-
-
21
-
-
33947685476
-
Value of bulk energy storage for managing wind power fluctuations
-
Mar.
-
M. Black and G. Strbac, "Value of bulk energy storage for managing wind power fluctuations," IEEE Trans. Ener. Conv., vol. 22, pp. 197-205, Mar. 2007.
-
(2007)
IEEE Trans. Ener. Conv.
, vol.22
, pp. 197-205
-
-
Black, M.1
Strbac, G.2
-
22
-
-
0027594442
-
Reserve Margin Planning in a Wind-Hydro-Thermal Power-System
-
May
-
L. Söder, "Reserve Margin Planning in a Wind-Hydro-Thermal Power-System," IEEE Trans. Power Syst., vol. 8, pp. 564-571, May 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, pp. 564-571
-
-
Söder, L.1
-
23
-
-
14544271494
-
Operational reserve of a power system with a large amount of wind power
-
E. M. Gouveia and M. A. Matos, "Operational reserve of a power system with a large amount of wind power," in Proc. 8th Int. Conf. Prob. Methods Applied to Power Syst., Ames, Iowa, 2004, pp. 717-722.
-
Proc. 8th Int. Conf. Prob. Methods Applied to Power Syst., Ames, Iowa, 2004
, pp. 717-722
-
-
Gouveia, E.M.1
Matos, M.A.2
-
24
-
-
84937657196
-
Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection
-
Oct.
-
L. T. Anstine, R. E. Burke, J. E. Casey, R. Holgate, R. S. John, and H. G. Stewart, "Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection," IEEE Trans. Power App. Syst., vol. PAS-82, no. 68, pp. 720-735, Oct. 1963.
-
(1963)
IEEE Trans. Power App. Syst.
, vol.PAS-82
, Issue.68
, pp. 720-735
-
-
Anstine, L.T.1
Burke, R.E.2
Casey, J.E.3
Holgate, R.4
John, R.S.5
Stewart, H.G.6
-
25
-
-
18944371663
-
A new approach to quantify reserve demand in systems with significant installed wind capacity
-
May
-
R. Doherty and M. O'Malley, "A new approach to quantify reserve demand in systems with significant installed wind capacity," IEEE Trans. Power Syst., vol. 20, pp. 587-595, May 2005.
-
(2005)
IEEE Trans. Power Syst.
, vol.20
, pp. 587-595
-
-
Doherty, R.1
O'Malley, M.2
-
26
-
-
84861408123
-
Power reserve in interconnected systems with high wind power production
-
G. Dany, "Power reserve in interconnected systems with high wind power production," in IEEE Porto Power Tech, Porto, Portugal, 2001.
-
IEEE Porto Power Tech, Porto, Portugal, 2001
-
-
Dany, G.1
-
27
-
-
0038208236
-
Effects of large scale wind power on total system variability and operation: Case study of Northern Ireland
-
S. Persaud, B. Fox, and D. Flynn, "Effects of large scale wind power on total system variability and operation: case study of Northern Ireland," Wind Engineering, vol. 27, pp. 3-20, 2003.
-
(2003)
Wind Engineering
, vol.27
, pp. 3-20
-
-
Persaud, S.1
Fox, B.2
Flynn, D.3
-
28
-
-
43849089442
-
Stochastic security for operations planning with significant wind power generation
-
May
-
F. Bouffard and F. D. Galiana, "Stochastic security for operations planning with significant wind power generation," IEEE Trans. Power Syst., vol. 23, p. 10, May 2008.
-
(2008)
IEEE Trans. Power Syst.
, vol.23
, pp. 10
-
-
Bouffard, F.1
Galiana, F.D.2
-
29
-
-
0036806111
-
Power system security
-
Oct.
-
D. S. Kirschen, "Power system security," Power Eng. J., vol. 16, pp. 241-248, Oct. 2002.
-
(2002)
Power Eng. J.
, vol.16
, pp. 241-248
-
-
Kirschen, D.S.1
-
31
-
-
0016061310
-
Optimal Load Flow with Steady-State Security
-
O. Alsac and B. Stott, "Optimal Load Flow with Steady-State Security," IEEE Trans. Power App. Syst., vol. Pa93, pp. 745-751, 1974.
-
(1974)
IEEE Trans. Power App. Syst.
, vol.PA93
, pp. 745-751
-
-
Alsac, O.1
Stott, B.2
-
32
-
-
0023292179
-
Security-Constrained Optimal Power Flow with Post-Contingency Corrective Rescheduling
-
Feb.
-
A. Monticelli, M. V. F. Pereira, and S. Granville, "Security- Constrained Optimal Power Flow with Post-Contingency Corrective Rescheduling," IEEE Trans. Power Syst., vol. 2, pp. 175-182, Feb. 1987.
-
(1987)
IEEE Trans. Power Syst.
, vol.2
, pp. 175-182
-
-
Monticelli, A.1
Pereira, M.V.F.2
Granville, S.3
-
33
-
-
77958032878
-
Security management uncer uncertainty: From day-ahead planning to intraday operation
-
Submitted to
-
P. Panciatici, Y. Hassaine, S. Fliscounakis, L. Platbrood, M. A. Ortega-Vazquez, J. L. Martinez-Ramos, F. Capitanescu, and L. Wehenkel, "Security management uncer uncertainty: from day-ahead planning to intraday operation," in Submitted to: Bulk Power System Dynamics and Control - VIII Buzios, Rio de Janeiro, Brazil, 2010.
-
Bulk Power System Dynamics and Control - VIII Buzios, Rio de Janeiro, Brazil, 2010
-
-
Panciatici, P.1
Hassaine, Y.2
Fliscounakis, S.3
Platbrood, L.4
Ortega-Vazquez, M.A.5
Martinez-Ramos, J.L.6
Capitanescu, F.7
Wehenkel, L.8
|