-
1
-
-
3042775741
-
Appropriate design of activated sludge systems for nitrogen removal from high strengthwastewaters
-
Artan, N.; Orhon, D.; Choi, E.Appropriate design of activated sludge systems for nitrogen removal from high strengthwastewaters.J.Environ.Sci.Health Pt.A 2004, 39(7), 1913-1924.
-
(2004)
J.Environ.Sci.Health Pt.A
, vol.39
, Issue.7
, pp. 1913-1924
-
-
Artan, N.1
Orhon, D.2
Choi, E.3
-
2
-
-
28944445078
-
Nutrient removal performance of a five-step sequencing batch reactor as a function of wastewater composition
-
Orhon, D.; Artan, N.Nutrient removal performance of a five-step sequencing batch reactor as a function of wastewater composition.Proc.Biochem. 2006, 41(1), 216-220.
-
(2006)
Proc.Biochem.
, vol.41
, Issue.1
, pp. 216-220
-
-
Orhon, D.1
Artan, N.2
-
3
-
-
0016934675
-
Single-stage nitrification denitrification
-
Bishop, D.F.; Heidman, J.A.; Stamberg, J.B.Single-stage nitrification denitrification.J.Water Pollut.Control F.1976, 48(3), 520-532.
-
(1976)
J.Water Pollut.Control F.
, vol.48
, Issue.3
, pp. 520-532
-
-
Bishop, D.F.1
Heidman, J.A.2
Stamberg, J.B.3
-
4
-
-
11044229103
-
Optimal but robust N and P removal in SBRs: A systematic study of operating scenarios
-
Sin G., Insel G., Lee D.S., Vanrolleghem P.A.Optimal but robust N and P removal in SBRs: A systematic study of operating scenarios, Water Sci.Technol.2004, 50(10), 97-105.
-
(2004)
Water Sci.Technol.
, vol.50
, Issue.10
, pp. 97-105
-
-
Sin, G.1
Insel, G.2
Lee, D.S.3
Vanrolleghem, P.A.4
-
5
-
-
0023273761
-
Effect of alternating aerobic and anaerobic conditions on the economics of the activated sludge system
-
Ip, S.Y.; Bridger, J.S.; Mills, N.F.Effect of alternating aerobic and anaerobic conditions on the economics of the activated sludge system.Water Sci.Technol.1987, 19(5-6), 911-918.
-
(1987)
Water Sci.Technol.
, vol.19
, Issue.5-6
, pp. 911-918
-
-
Ip, S.Y.1
Bridger, J.S.2
Mills, N.F.3
-
6
-
-
0025132118
-
Biological nitrogen removal in a completemixing type aerator with ORP control
-
Nakanashi, H.; Fukagawa,M.; Takeuchi,M.; Ishikawa,M.; Ukita, M.;Murakami, S.Biological nitrogen removal in a completemixing type aerator with ORP control.Water Sci.Technol.1990, 22(7-8), 269-270.
-
(1990)
Water Sci.Technol.
, vol.22
, Issue.7-8
, pp. 269-270
-
-
Nakanashi, H.1
Fukagawa, M.2
Takeuchi, M.3
Ishikawa, M.4
Ukita, M.5
Murakami, S.6
-
7
-
-
0025197850
-
Optimization of nitrogen removal in small activated sludge plants
-
Heduit, A.; Duchene, P.; Sintes,L.Optimization of nitrogen removal in small activated sludge plants.Water Sci.Technol.1990, 22(3-4), 123-130.
-
(1990)
Water Sci.Technol.
, vol.22
, Issue.3-4
, pp. 123-130
-
-
Heduit, A.1
Duchene, P.2
Sintes, L.3
-
8
-
-
0026056735
-
Practical performance of nitrogen removal in small-scale sewage treatment plants operated in intermittent aeration mode
-
Nakajima, J.; Kaneko, M.Practical performance of nitrogen removal in small-scale sewage treatment plants operated in intermittent aeration mode.Water Sci.Technol.1991, 23(4-6), 709-718.
-
(1991)
Water Sci.Technol.
, vol.23
, Issue.4-6
, pp. 709-718
-
-
Nakajima, J.1
Kaneko, M.2
-
9
-
-
0029555530
-
Intermittent aeration of pig slurry-farm scale experiments for carbon and nitrogen removal
-
Bicudo, J.R.; Svoboda, I.F.Intermittent aeration of pig slurry-farm scale experiments for carbon and nitrogen removal.Water Sci.Technol.1996, 32(12), 83-90.
-
(1996)
Water Sci.Technol.
, vol.32
, Issue.12
, pp. 83-90
-
-
Bicudo, J.R.1
Svoboda, I.F.2
-
10
-
-
0029798127
-
Development of 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus
-
Sasaki, K.; Yamamoto, Y.; Tsumura, K.; Ouchi, S.; Mori, Y.Development of 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus.Water Sci.Technol.1996, 34(1-2), 111-118.
-
(1996)
Water Sci.Technol.
, vol.34
, Issue.1-2
, pp. 111-118
-
-
Sasaki, K.1
Yamamoto, Y.2
Tsumura, K.3
Ouchi, S.4
Mori, Y.5
-
11
-
-
84975801938
-
Simultaneous nitrification-denitrification process in extended aeration plants: Pilot and real scale experiences
-
Bertanza, G.Simultaneous nitrification-denitrification process in extended aeration plants: Pilot and real scale experiences.Water Sci.Technol.1997, 35(5), 53-61.
-
(1997)
Water Sci.Technol.P
, vol.35
, Issue.5
, pp. 53-61
-
-
Bertanza, G.1
-
12
-
-
33746514481
-
ASM1 dynamic calibration and long-term validation for an intermittently aerated WWTP
-
Marquot, A.; Stricker, A.E.; Racault, Y.ASM1 dynamic calibration and long-term validation for an intermittently aerated WWTP.Water Sci.Technol.2006, 53(12), 247-256.
-
(2006)
Water Sci.Technol.
, vol.53
, Issue.12
, pp. 247-256
-
-
Marquot, A.1
Stricker, A.E.2
Racault, Y.3
-
13
-
-
0020330568
-
Kinetic analysis of alternative configurations for single-sludge nitrification/denitrification
-
Batchelor, B.Kinetic analysis of alternative configurations for single-sludge nitrification/denitrification.J.Water Pollut.Control F.1982, 54(11), 1493-1504.
-
(1982)
J.Water Pollut.Control F.
, vol.54
, Issue.11
, pp. 1493-1504
-
-
Batchelor, B.1
-
14
-
-
0030044565
-
Alternating aerobic-anoxic process for nitrogen removal: Process evaluation
-
DOI 10.2175/106143096X127244
-
Huang, O.; Huang, J.Alternating aerobic-aNOxic process for nitrogen removal: Process evaluation.Water Environ.Res.1996, 68(1), 83-93. (Pubitemid 26030872)
-
(1996)
Water Environment Research
, vol.68
, Issue.1
, pp. 83-93
-
-
Hao, O.J.1
Huang, J.2
-
15
-
-
0029805927
-
Nitrogen removal upgrade of a wastewater treatment plant within existing reactor volumes: A simulation supported scenario analysis
-
Coen, F.; Vanderhaegen, B.; Boonen, I.; Vanrolleghem, P.A.; Van Eyck, L.; Van Meenen, P.Nitrogen removal upgrade of a wastewater treatment plant within existing reactor volumes: A simulation supported scenario analysis.Water Sci.Technol.1996, 34(3-4), 339-346.
-
(1996)
Water Sci Technol.
, vol.34
, Issue.3-4
, pp. 339-346
-
-
Coen, F.1
Vanderhaegen, B.2
Boonen, I.3
Vanrolleghem, P.A.4
Van Eyck, L.5
Van Meenen, P.6
-
16
-
-
0029825016
-
Short horizon control strategies for an alternating activated sludge process
-
Isaacs, S.Short horizon control strategies for an alternating activated sludge process.Water Sci.Technol.1996, 34(1-2), 203-212.
-
(1996)
Water Sci.Technol.
, vol.34
, Issue.1-2
, pp. 203-212
-
-
Isaacs, S.1
-
17
-
-
0033058408
-
Optimized operation and design of alternating activated sludge process for N-removal
-
Lukasse, L.J.S.; Keesman, K.J.Optimized operation and design of alternating activated sludge process for N-removal.Water Sci.Technol.1999, 33(11), 2651-2659.
-
(1999)
Water Sci.Technol.
, vol.33
, Issue.11
, pp. 2651-2659
-
-
Lukasse, L.J.S.1
Keesman, K.J.2
-
18
-
-
42649117826
-
Long-termexperience with an automatic process control for nitrogen removal in membrane bioreactors
-
Fatonea, F.; Battistonib, P.; Bolzonellaa, D.; Paolo Pavanc; Cecchia F.Long-termexperience with an automatic process control for nitrogen removal in membrane bioreactors.Desalination 2008, 227(1-3), 72-84.
-
(2008)
Desalination
, vol.227
, Issue.1-3
, pp. 72-84
-
-
Fatonea, F.1
Battistonib, P.2
Bolzonellaa, D.3
Paolo, P.4
Cecchia, F.5
-
19
-
-
67650927747
-
Batch treatment of liquid fraction of pig slurry by intermittent aeration: Process simulation and microbial community analysis
-
Magri, A.; Guivernau, M.; Baquerizo G.; Vinas, M.; Prenafeta, F.X.; Flotats X.Batch treatment of liquid fraction of pig slurry by intermittent aeration: Process simulation and microbial community analysis.J.Chem.Technol. Biot.2009, 84(8), 1202-1210.
-
(2009)
J.Chem.Technol.Biot.
, vol.84
, Issue.8
, pp. 1202-1210
-
-
Magri, A.1
Guivernau, M.2
Baquerizo, G.3
Vinas, M.4
Prenafeta, F.X.5
Flotats, X.6
-
20
-
-
0029553333
-
Conceptual basis of wastewater nitrogen removal in sensitive coastal areas
-
Artan, N.; Orhon, D.; Sözen, S.Conceptual basis of wastewater nitrogen removal in sensitive coastal areas.Water Sci.Technol.1995, 32(12), 1-10.
-
(1995)
Water Sci.Technol.
, vol.32
, Issue.12
, pp. 1-10
-
-
Artan, N.1
Orhon, D.2
Sözen, S.3
-
21
-
-
0024499981
-
Nitrogen removal in an intermittently aerated completely mixed reactor
-
Lin, K.C.; Tsang, K.Nitrogen removal in an intermittently aerated completely mixed reactor.Environ.Technol.Lett.1989, 10(1), 1-8.
-
(1989)
Environ.Technol.Lett.
, vol.10
, Issue.1
, pp. 1-8
-
-
Lin, K.C.1
Tsang, K.2
-
22
-
-
0036035324
-
Retrofitting activated sludge systems to intermittent aeration for nutrient removal
-
Hanhan, O.; Artan, N.; Orhon, D.Retrofitting activated sludge systems to intermittent aeration for nutrient removal.Water Sci.Technol.2002, 46(8), 75-82.
-
(2002)
Water Sci.Technol.
, vol.46
, Issue.8
, pp. 75-82
-
-
Hanhan, O.1
Artan, N.2
Orhon, D.3
-
23
-
-
0004081883
-
-
IAWPRC Scientific and Technical Report No.1; IAWPRC: London
-
Henze, M.; Grady, C.P.L.Jr.; Gujer,W.; Marais, Gv.R.;Matsuo, T.Activated Sludge Model No.1, IAWPRC Scientific and Technical Report No.1; IAWPRC: London; 1987.
-
(1987)
Activated Sludge Model No.1
-
-
Henze, M.1
Grady Jr., C.P.L.2
Gujer, W.3
Marais, Gv.R.4
Matsuo, T.5
-
24
-
-
27544484063
-
Effect of aeration on nutrient removal performance of oxidation ditch systems
-
Insel, G.; Artan, N.; Orhon, D.Effect of aeration on nutrient removal performance of oxidation ditch systems.Environ.Eng.Sci.2005, 22(5), 802-815.
-
(2005)
Environ.Eng.Sci.
, vol.22
, Issue.5
, pp. 802-815
-
-
Insel, G.1
Artan, N.2
Orhon, D.3
-
25
-
-
85000330684
-
Effect of aNOxic decay process on simultaneous nitrification denitrification in a membrane bioreactor operated without an aNOxic tank
-
Sarioglu,M.; Insel, G.; Artan, N.; Orhon, D.Effect of aNOxic decay process on simultaneous nitrification denitrification in a membrane bioreactor operated without an aNOxic tank, Water Sci.Technol.2010, 61(3), 771-780.
-
(2010)
Water Sci.Technol.
, vol.61
, Issue.3
, pp. 771-780
-
-
Sarioglu, M.1
Insel, G.2
Artan, N.3
Orhon, D.4
-
26
-
-
34247575689
-
Effects of design and aeration control parameters on simultaneous nitrification and denitrification (SNdN) performance for activated sludge process
-
Insel, G.Effects of design and aeration control parameters on simultaneous nitrification and denitrification (SNdN) performance for activated sludge process.Environ.Eng.Sci.2007, 24(4), 675-686.
-
(2007)
Environ.Eng.Sci.
, vol.24
, Issue.4
, pp. 675-686
-
-
Insel, G.1
-
28
-
-
0031731465
-
The effect of chemical settling on the kinetics and design of activated sludge for tannery wastewaters
-
Orhon, D.; Sözen, S.; Ubay Ç okgör, E.; Até, E.The effect of chemical settling on the kinetics and design of activated sludge for tannery wastewaters.Water Sci.Technol.1998, 38(1), 227-236.
-
(1998)
Water Sci.Technol.
, vol.38
, Issue.1
, pp. 227-236
-
-
Orhon, D.1
Sözen, S.2
Ubay Çokgör, E.3
Até, E.4
-
29
-
-
70349581209
-
Effect of biomass concentration on the performance and modeling of nitrogen removal formembrane bioreactors
-
Sarioglu,M.; Insel,G.; Artan,N.; Orhon,D.Effect of biomass concentration on the performance and modeling of nitrogen removal formembrane bioreactors.J.Environ.Sci.Health Pt.A 2009, 44(8), 733-743.
-
(2009)
J.Environ.Sci.Health Pt.A
, vol.44
, Issue.8
, pp. 733-743
-
-
Sarioglu, M.1
Insel G.Artan, N.2
Orhon, D.3
-
30
-
-
78649516801
-
Modeling the effect of biomass induced oxygen transfer limitations on the nitrogen removal performance of membrane bioreactor
-
submitted for publication
-
Insel, G.;Murat Hocaoglu, S.; Ubay Cokgor E.; Orhon, D.Modeling the effect of biomass induced oxygen transfer limitations on the nitrogen removal performance of membrane bioreactor.J.Membrane Sci.2010, (submitted for publication).
-
(2010)
J.Membrane Sci.
-
-
Insel, G.1
Murat Hocaoglu, S.2
Ubay Cokgor, E.3
Orhon, D.4
-
31
-
-
0030071965
-
Simultaneous nitrification and denitrification in bench-scale sequencing batch reactors
-
Münch, E.V.; Lant, P.; Keller, J.Simultaneous nitrification and denitrification in bench-scale sequencing batch reactors.Water Res.1996, 30(2), 277-284.
-
(1996)
Water Res.
, vol.30
, Issue.2
, pp. 277-284
-
-
Münch, E.V.1
Lant, P.2
Keller, J.3
|