메뉴 건너뛰기




Volumn 49, Issue 2, 2011, Pages 585-610

A simulation based approach to analyse the effects of job release on the performance of a multi-stage job-shop with processing flexibility

Author keywords

job release; production planning and control; simulation; workload control

Indexed keywords

ACCEPTANCE/REJECTION; DECISION LEVELS; DECISION POINTS; DUE-DATE ASSIGNMENT; JOB RELEASE; JOB-SHOP; MULTI-STAGE; NEW PRODUCTION; PRODUCTION PLANNING AND CONTROL; SHOP FLOOR; SIGNIFICANT IMPACTS; SIMULATION; SIMULATION MODEL; SIMULATION-BASED; WORKLOAD CONTROL;

EID: 78649469960     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540903479778     Document Type: Article
Times cited : (15)

References (36)
  • 4
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of load oriented order release
    • Breipthaupt, J. W., Land, M., and Nyhuis, P., 2002. The workload control concept: theory and practical extensions of load oriented order release. Production Planning & Control, 13(7), 625-638.
    • (2002) Production Planning & Control , vol.13 , Issue.7 , pp. 625-638
    • Breipthaupt, J.W.1    Land, M.2    Nyhuis, P.3
  • 6
    • 0033888502 scopus 로고    scopus 로고
    • Evaluating shop-floor input control using rapid modeling
    • Enns, T. S., 2000. Evaluating shop-floor input control using rapid modeling. International Journal of Production Economics, 63(3), 229-241.
    • (2000) International Journal of Production Economics , vol.63 , Issue.3 , pp. 229-241
    • Enns, T.S.1
  • 7
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck work loads
    • Enns, S. T. and Costa, M. P., 2002. The effectiveness of input control based on aggregate versus bottleneck work loads. Production Planning & Control, 13(7), 614-624.
    • (2002) Production Planning & Control , vol.13 , Issue.7 , pp. 614-624
    • Enns, S.T.1    Costa, M.P.2
  • 10
    • 0031632563 scopus 로고    scopus 로고
    • The effect of workload control (WLC) on performance in make-to-order companies
    • Hendry, L. C., Kingsman, B. G., and Cheung, P., 1998. The effect of workload control (WLC) on performance in make-to-order companies. Journal of Operations Management, 16(1), 63-75.
    • (1998) Journal of Operations Management , vol.16 , Issue.1 , pp. 63-75
    • Hendry, L.C.1    Kingsman, B.G.2    Cheung, P.3
  • 11
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman, B., 2000. Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics, 68(1), 73-93.
    • (2000) International Journal of Production Economics , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.1
  • 12
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • Kingsman, B. G., Tatsiopoulus, I. P., and Hendry, L. C., 1989. A structural methodology for managing manufacturing lead times in make-to-order companies. European Journal of Operational Research, 40(1), 196-209.
    • (1989) European Journal of Operational Research , vol.40 , Issue.1 , pp. 196-209
    • Kingsman, B.G.1    Tatsiopoulus, I.P.2    Hendry, L.C.3
  • 13
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops: A critical assessment
    • Proceedings of the 8th International working seminar on production economics
    • Land, M. and Gaalman, G., 1996. Workload control concepts in job shops: a critical assessment. International Journal of Production Economics, 46-47, 535-548. [Proceedings of the 8th International working seminar on production economics].
    • (1996) International Journal of Production Economics , vol.46-47 , pp. 535-548
    • Land, M.1    Gaalman, G.2
  • 16
    • 0000809619 scopus 로고
    • Load smoothing by the planning and order review/release systems: A simulation experiment
    • Melnyk, S. A., Ragatz, G. L., and Fredendall, L., 1991. Load smoothing by the planning and order review/release systems: a simulation experiment. Journal of Operations Management, 10(4), 512-523.
    • (1991) Journal of Operations Management , vol.10 , Issue.4 , pp. 512-523
    • Melnyk, S.A.1    Ragatz, G.L.2    Fredendall, L.3
  • 17
    • 13644284218 scopus 로고    scopus 로고
    • Real-time due-date promising by build to order environments
    • Moses, S., et al., 2004. Real-time due-date promising by build to order environments. International Journal of Production Research, 42(20), 4353-4375.
    • (2004) International Journal of Production Research , vol.42 , Issue.20 , pp. 4353-4375
    • Moses, S.1
  • 18
    • 1642559579 scopus 로고    scopus 로고
    • Behavior of an order release mechanism in a make-to-order manufacturing system with selected order acceptance
    • 7-10 December 2003, New Orleans
    • Nandi, A. and Rogers, P., 2003. Behavior of an order release mechanism in a make-to-order manufacturing system with selected order acceptance. In: Proceeding of the 2003 winter simulation conference, 7-10 December 2003, New Orleans, 1251-1259.
    • (2003) Proceeding of the 2003 Winter Simulation Conference , pp. 1251-1259
    • Nandi, A.1    Rogers, P.2
  • 19
    • 4344708206 scopus 로고    scopus 로고
    • Using simulation to make-to-order acceptance/rejection decision
    • Nandi, A. and Rogers, P., 2004. Using simulation to make-to-order acceptance/rejection decision. Simulation, 80(3), 131-142.
    • (2004) Simulation , vol.80 , Issue.3 , pp. 131-142
    • Nandi, A.1    Rogers, P.2
  • 21
    • 0026953379 scopus 로고
    • Capacity-based order review/release strategies to improve manufacturing performance
    • Philipoom, P. R. and Fry, T. D., 1992. Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research, 30(11), 2559-2572.
    • (1992) International Journal of Production Research , vol.30 , Issue.11 , pp. 2559-2572
    • Philipoom, P.R.1    Fry, T.D.2
  • 22
    • 0342845324 scopus 로고    scopus 로고
    • The performance of workload rules for order acceptance in batch chemical manufacturing
    • Raaymakers, W. M., Bertrand, J. W., and Fransoo, J. F., 2000a. The performance of workload rules for order acceptance in batch chemical manufacturing. Journal of Intelligent Manufacturing, 11(2), 217-228.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.2 , pp. 217-228
    • Raaymakers, W.M.1    Bertrand, J.W.2    Fransoo, J.F.3
  • 23
    • 0034288047 scopus 로고    scopus 로고
    • Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing
    • Raaymakers, W. M., Bertrand, J. W., and Fransoo, J. F., 2000b. Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing. IIE Transactions, 32(10), 989-998.
    • (2000) IIE Transactions , vol.32 , Issue.10 , pp. 989-998
    • Raaymakers, W.M.1    Bertrand, J.W.2    Fransoo, J.F.3
  • 24
    • 0000482128 scopus 로고
    • Due-date setting methodologies based on simulated annealing - An experimental study in a real-life job shop
    • Raghu, T. S. and Rajendran, C., 1995. Due-date setting methodologies based on simulated annealing - an experimental study in a real-life job shop. International Journal of Production Research, 33(9), 2535-2554.
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2535-2554
    • Raghu, T.S.1    Rajendran, C.2
  • 25
    • 18844442302 scopus 로고    scopus 로고
    • Using data mining for due date assignment in a dynamic job shop environment
    • Sha, D. Y. and Liu, C. H., 2004. Using data mining for due date assignment in a dynamic job shop environment. International Journal of Advanced Manufacturing Technology, 25 (11-12), 1164-1174.
    • (2004) International Journal of Advanced Manufacturing Technology , vol.25 , Issue.11-12 , pp. 1164-1174
    • Sha, D.Y.1    Liu, C.H.2
  • 26
    • 0020500356 scopus 로고
    • Due date selection procedures for job-shop simulation
    • Smith, M. L. and Seidman, A., 1983. Due date selection procedures for job-shop simulation. Computers & Industrial Engineering, 7(3), 199-207.
    • (1983) Computers & Industrial Engineering , vol.7 , Issue.3 , pp. 199-207
    • Smith, M.L.1    Seidman, A.2
  • 27
    • 33748750890 scopus 로고    scopus 로고
    • Aggregate load-oriented workload control: A review and a re-classification of a key approach
    • Stevenson, M. and Hendry, L., 2006. Aggregate load-oriented workload control: a review and a re-classification of a key approach. International Journal of Production Economics, 104(2), 676-693.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 676-693
    • Stevenson, M.1    Hendry, L.2
  • 29
    • 0035479473 scopus 로고    scopus 로고
    • Computer simulation of due-date setting in multi-machine job shops
    • Veral, E. A., 2001. Computer simulation of due-date setting in multi-machine job shops. Computes & Industrial Engineering, 41(1), 77-94.
    • (2001) Computes & Industrial Engineering , vol.41 , Issue.1 , pp. 77-94
    • Veral, E.A.1
  • 31
    • 38149144595 scopus 로고
    • Multicriteria order acceptance decision support in over demanded job-shops: A neural network approach
    • Wang, J., Yang, J. Q., and Lee, H., 1994. Multicriteria order acceptance decision support in over demanded job-shops: a neural network approach. Mathematical and Computer Modelling, 19(5), 1-19.
    • (1994) Mathematical and Computer Modelling , vol.19 , Issue.5 , pp. 1-19
    • Wang, J.1    Yang, J.Q.2    Lee, H.3
  • 32
    • 78649479262 scopus 로고
    • A methodology for assigning minimum cost due-dates
    • Weeks, J. K. and Fryer, J. S., 1977. A methodology for assigning minimum cost due-dates. Management Science, 25(4), 363-373.
    • (1977) Management Science , vol.25 , Issue.4 , pp. 363-373
    • Weeks, J.K.1    Fryer, J.S.2
  • 33
    • 0026880663 scopus 로고
    • Order acceptance strategies in a production-toorder environment with setup times and due-dates
    • Wester, F. W., Wijngaard, J., and Zijm, W. M., 1992. Order acceptance strategies in a production-toorder environment with setup times and due-dates. International Journal Production Research, 30(6), 1313-1326.
    • (1992) International Journal Production Research , vol.30 , Issue.6 , pp. 1313-1326
    • Wester, F.W.1    Wijngaard, J.2    Zijm, W.M.3
  • 34
    • 0002274219 scopus 로고
    • Input/output control: A real handle on lead time
    • Wight, O., 1970. Input/output control: a real handle on lead time. Production and Inventory Management, 3(3), 9-31.
    • (1970) Production and Inventory Management , vol.3 , Issue.3 , pp. 9-31
    • Wight, O.1
  • 35
    • 0030834962 scopus 로고    scopus 로고
    • Relevant cost information for order acceptance decisions
    • Wouters, M. J., 1997. Relevant cost information for order acceptance decisions. Production Planning & Control, 8(1), 2-9.
    • (1997) Production Planning & Control , vol.8 , Issue.1 , pp. 2-9
    • Wouters, M.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.