메뉴 건너뛰기




Volumn 4, Issue 3, 2009, Pages 402-407

The implementation of software process improvement models

Author keywords

Capability maturity model integration; Software process; Software process improvement; Software quality

Indexed keywords

AUSTRALIA; CAPABILITY MATURITY MODEL INTEGRATION; MALAYSIA; MALAYSIANS; NEW ZEALAND; ONLINE SURVEYS; PROCESS MODEL; SIX SIGMA; SOFTWARE BEST PRACTICES; SOFTWARE ORGANIZATION; SOFTWARE PROCESS; SOFTWARE PROCESS IMPROVEMENT; SOFTWARE PROCESS IMPROVEMENT MODEL; SOFTWARE QUALITY; SOUTHEAST ASIA;

EID: 78649281146     PISSN: 18286003     EISSN: 18286011     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (11)

References (27)
  • 3
    • 57349093732 scopus 로고    scopus 로고
    • Resistance factors in software process improvement
    • Brietzke, J. and Rabello A., Resistance Factors in Software Process Improvement, CLEl Electronic Journal, Vol.9, 2006
    • (2006) CLEl Electronic Journal , vol.9
    • Brietzke, J.1    Rabello, A.2
  • 5
    • 84857081398 scopus 로고    scopus 로고
    • CMMI Product Development Team, Version 1.02,. CMU/SEI- 2000-TR-018. Pittsburgh, PA:Software Engineering Institute
    • CMMI Product Development Team (2000). CMMI for Systems Engineering/Software Engineering, Version 1.02,. CMU/SEI- 2000-TR-018. Pittsburgh, PA:Software Engineering Institute.
    • (2000) CMMI for Systems Engineering/Software Engineering
  • 6
    • 84857069370 scopus 로고
    • IS0/IECJTC1/WG10, Technical Report, Type 2, June
    • IS0/IECJTC1/WG10, SPICE Products, Technical Report, Type 2, June 1995.
    • (1995) SPICE Products
  • 7
    • 0010189273 scopus 로고
    • SPICE: Software process improvement and capability determination
    • Dorling A., (1993) SPICE: Software Process Improvement and Capability determination. Software Quality Journal 2, 209-224.
    • (1993) Software Quality Journal , vol.2 , pp. 209-224
    • Dorling, A.1
  • 17
    • 0003748767 scopus 로고
    • A comparison of iso 9001 and the capability maturity model for software
    • Paulk, M. C., A Comparison of ISO 9001 and the Capability Maturity Model for Software, Software Capability Maturity Model Project, 1994, pp. 1-71.
    • (1994) Software Capability Maturity Model Project , pp. 1-71
    • Paulk, M.C.1
  • 20
    • 0035020259 scopus 로고    scopus 로고
    • Commitment development in software process improvement: Critical misconceptions
    • Abrahamsson, P. Commitment Development in Software Process Improvement: Critical Misconceptions, Software Engineering, 2001, pp.71-80.
    • (2001) Software Engineering , pp. 71-80
    • Abrahamsson, P.1
  • 25
    • 0035705497 scopus 로고    scopus 로고
    • Enhancing Six sigma through simulation with igrafx process for six sigma
    • Mccarthy, B. and Stauffer R., Enhancing Six Sigma Through Simulation With Igrafx Process For Six Sigma, Winter Simulation Conference, 2001, pp 1241-1247.
    • (2001) Winter Simulation Conference , pp. 1241-1247
    • McCarthy, B.1    Stauffer, R.2
  • 26
    • 84857069369 scopus 로고    scopus 로고
    • M.S.S.E. dissertation, West Virginia University, United States -- West Virginia. Retrieved March 26, 2008, from ProQuest Digital Dissertations database
    • Norman, William Grant (2003) Implementing CMMISM version 1.1 in a previously unstructured environment. M.S.S.E. dissertation, West Virginia University, United States -- West Virginia. Retrieved March 26, 2008, from ProQuest Digital Dissertations database.
    • (2003) Implementing CMMISM Version 1.1 in a Previously Unstructured Environment
    • William Grant, N.1
  • 27
    • 33644520545 scopus 로고    scopus 로고
    • KM your way to CMMI
    • Emerald Group Publishing Limited
    • Dayan, Rony and Evans Stephen. KM your way to CMMI. Journal of Knowledge Management. Emerald Group Publishing Limited, 2006. Pp 69-80.
    • (2006) Journal of Knowledge Management , pp. 69-80
    • Dayan, R.1    Stephen, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.