메뉴 건너뛰기




Volumn 48, Issue 23, 2010, Pages 7089-7106

Empowering Kanban through TPS-principles - An empirical analysis of the Toyota Production System

Author keywords

empirical analysis; JIT production; performance; Toyota Production System

Indexed keywords

CONFIRMATORY FACTOR ANALYSIS; EMPIRICAL ANALYSIS; EMPIRICAL INVESTIGATION; JIT PRODUCTION; KEY PRACTICES; MANUFACTURING PLANT; MANUFACTURING RESEARCH; MEASUREMENT CHARACTERISTICS; PATH ANALYSIS; PERFORMANCE; TOYOTA PRODUCTION SYSTEM;

EID: 78349257459     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540903436695     Document Type: Article
Times cited : (31)

References (57)
  • 1
    • 0033433503 scopus 로고    scopus 로고
    • Flexibility versus efficiency? A case study of model changeovers in the Toyota production system
    • Adler, P. S., Goldoftas, B., and Levine, D. I., 1999. Flexibility versus efficiency? A case study of model changeovers in the Toyota Production System. Organisation Science, 10(1), 43-68.
    • (1999) Organisation Science , vol.10 , Issue.1 , pp. 43-68
    • Adler, P.S.1    Goldoftas, B.2    Levine, D.I.3
  • 2
    • 0042665447 scopus 로고    scopus 로고
    • The role of infrastructure practices in the effectiveness of JIT practices: Implications for plant competitiveness
    • Ahmad, S., Schroeder, R. G., and Sinha, K. K., 2003. The role of infrastructure practices in the effectiveness of JIT practices: implications for plant competitiveness. Journal of Engineering and Technology Management, 20(3), 161-191.
    • (2003) Journal of Engineering and Technology Management , vol.20 , Issue.3 , pp. 161-191
    • Ahmad, S.1    Schroeder, R.G.2    Sinha, K.K.3
  • 5
    • 84936824236 scopus 로고
    • Assessing construct validity in organisational research
    • Bagozzi, R. P., Yi, Y., and Phillips, L. W., 1991. Assessing construct validity in organisational research. Administrative Science Quarterly, 36(3), 421-458.
    • (1991) Administrative Science Quarterly , vol.36 , Issue.3 , pp. 421-458
    • Bagozzi, R.P.1    Yi, Y.2    Phillips, L.W.3
  • 6
    • 0001610297 scopus 로고
    • Sample size effects on chi square and other statistics used in evaluating causal models
    • Bearden, W. O., Sharma, S., and Teel, J. E., 1982. Sample size effects on chi square and other statistics used in evaluating causal models. Journal of Marketing Research, 19(4), 425-430.
    • (1982) Journal of Marketing Research , vol.19 , Issue.4 , pp. 425-430
    • Bearden, W.O.1    Sharma, S.2    Teel, J.E.3
  • 7
    • 4243159210 scopus 로고
    • Significance tests and goodness of fit in the analysis of covariance structures
    • Bentler, P. M. and Bonett, D. G., 1980. Significance tests and goodness of fit in the analysis of covariance structures. Psychological Bulletin, 88(3), 588-606.
    • (1980) Psychological Bulletin , vol.88 , Issue.3 , pp. 588-606
    • Bentler, P.M.1    Bonett, D.G.2
  • 8
    • 34547374447 scopus 로고    scopus 로고
    • Design rules for implementing the Toyota production system
    • Black, J. T., 2007. Design rules for implementing the Toyota Production System. International Journal of Production Research, 45(16), 3639-3664.
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3639-3664
    • Black, J.T.1
  • 12
    • 22144444619 scopus 로고    scopus 로고
    • Effects of sample size, estimation methods, and model specification on structural equation modeling fit indexes
    • Fan, X., Thompson, B., and Wang, L., 1999. Effects of sample size, estimation methods, and model specification on structural equation modeling fit indexes. Structural Equation Modeling, 6(1), 56-83.
    • (1999) Structural Equation Modeling , vol.6 , Issue.1 , pp. 56-83
    • Fan, X.1    Thompson, B.2    Wang, L.3
  • 13
    • 3543133082 scopus 로고    scopus 로고
    • The World Class Manufacturing project: A retrospective view of research issues and methodology
    • Flynn, B. B., et al., 1997. The World Class Manufacturing project: A retrospective view of research issues and methodology. International Journal of Operations and Production Management, 17(7), 671-685.
    • (1997) International Journal of Operations and Production Management , vol.17 , Issue.7 , pp. 671-685
    • Flynn, B.B.1
  • 14
    • 21844504189 scopus 로고
    • Relationship between JIT and TQM: Practices and performance
    • Flynn, B. B., Sakakibara, S., and Schroeder, R. G., 1995. Relationship between JIT and TQM: Practices and performance. Academy of Management Journal, 38(5), 1325-1360.
    • (1995) Academy of Management Journal , vol.38 , Issue.5 , pp. 1325-1360
    • Flynn, B.B.1    Sakakibara, S.2    Schroeder, R.G.3
  • 15
    • 0030558641 scopus 로고    scopus 로고
    • Work organisation in lean production and traditional plants: What are the differences?
    • Forza, C., 1996. Work organisation in lean production and traditional plants: What are the differences? International Journal of Operations & Production Management, 16(2), 43-63.
    • (1996) International Journal of Operations & Production Management , vol.16 , Issue.2 , pp. 43-63
    • Forza, C.1
  • 16
    • 0037804616 scopus 로고    scopus 로고
    • An examination of the relationships between JIT and financial performance
    • Fullerton, R. R., McWatters, C. S., and Fawson, C., 2003. An examination of the relationships between JIT and financial performance. Journal of Operations Management, 21, 383-404.
    • (2003) Journal of Operations Management , vol.21 , pp. 383-404
    • Fullerton, R.R.1    McWatters, C.S.2    Fawson, C.3
  • 17
    • 0035155610 scopus 로고    scopus 로고
    • The production performance benefits from just-in-time implementation
    • Fullerton, R. R. and McWatters, C. S., 2001. The production performance benefits from just-in-time implementation. Journal of Operations Management, 19, 81-96.
    • (2001) Journal of Operations Management , vol.19 , pp. 81-96
    • Fullerton, R.R.1    McWatters, C.S.2
  • 23
    • 0000014811 scopus 로고
    • The human factor in cellular manufacturing
    • Huber, V. L. and Hyer, N. L., 1985. The human factor in cellular manufacturing. Journal of Operations Management, 5(2), 213-228.
    • (1985) Journal of Operations Management , vol.5 , Issue.2 , pp. 213-228
    • Huber, V.L.1    Hyer, N.L.2
  • 25
    • 78349256106 scopus 로고
    • Applying total employee involvement to revolving change over
    • Jindia, A. K. and Lerman, E., 1995. Applying total employee involvement to revolving change over. Industrial Engineering, 27(2), 54-56.
    • (1995) Industrial Engineering , vol.27 , Issue.2 , pp. 54-56
    • Jindia, A.K.1    Lerman, E.2
  • 26
    • 0001352565 scopus 로고
    • Recent developments in structural equation modeling
    • Joreskog, K. G. and Sorbom, D., 1982. Recent developments in structural equation modeling. Journal of Marketing Research, 19(4), 404-416.
    • (1982) Journal of Marketing Research , vol.19 , Issue.4 , pp. 404-416
    • Joreskog, K.G.1    Sorbom, D.2
  • 27
    • 34547371574 scopus 로고    scopus 로고
    • The mutation of the Toyota Production System: Adapting the TPS at Hyundai Motor Company
    • Lee, B.-H. and Jo, H.-J., 2007. The mutation of the Toyota Production System: adapting the TPS at Hyundai Motor Company. International Journal of Production Research, 45(16), 3665-3679.
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3665-3679
    • Lee, B.-H.1    Jo, H.-J.2
  • 30
    • 0032396016 scopus 로고    scopus 로고
    • Measurement of overall equipment effectiveness as a basis for TPM activities
    • Ljungberg, O., 1998. Measurement of overall equipment effectiveness as a basis for TPM activities. International Journal of Operations and Productions Management, 18(5), 495-507.
    • (1998) International Journal of Operations and Productions Management , vol.18 , Issue.5 , pp. 495-507
    • Ljungberg, O.1
  • 31
    • 34249950138 scopus 로고    scopus 로고
    • Year An empirical analysis of JIT production in Japanese manufacturing companies
    • Matsui, Y., 2007. Year An empirical analysis of JIT production in Japanese manufacturing companies. International Journal of Production Economics, 108 (1/2), 153-164.
    • (2007) International Journal of Production Economics , vol.108 , Issue.1-2 , pp. 153-164
    • Matsui, Y.1
  • 32
    • 0034691903 scopus 로고    scopus 로고
    • A critical evaluation of Shingo's 'SMED' (single minute exchange of die) methodology
    • McIntosh, R. I., et al., 2000. A critical evaluation of Shingo's 'SMED' (single minute exchange of die) methodology. International Journal of Production Research, 38(11), 2377-2395.
    • (2000) International Journal of Production Research , vol.38 , Issue.11 , pp. 2377-2395
    • McIntosh, R.I.1
  • 33
    • 0001831793 scopus 로고
    • Year Adaptable Kanban system helps Toyota maintain JIT production
    • Monden, Y., 1981. Year Adaptable Kanban system helps Toyota maintain JIT production. Industrial Engineering, 13(5), 28-38.
    • (1981) Industrial Engineering , vol.13 , Issue.5 , pp. 28-38
    • Monden, Y.1
  • 36
    • 0032140165 scopus 로고    scopus 로고
    • Adoption of just-in-time manufacturing methods at U. S. and Japanese owned plants: Some empirical evidence
    • Nakamura, M., Sakakibara, S., and Schroeder, R., 1998. Adoption of just-in-time manufacturing methods at U. S. and Japanese owned plants: Some empirical evidence. IEEE Transactions on Engineering Management, 45(3), 230-240.
    • (1998) IEEE Transactions on Engineering Management , vol.45 , Issue.3 , pp. 230-240
    • Nakamura, M.1    Sakakibara, S.2    Schroeder, R.3
  • 37
    • 34547321220 scopus 로고    scopus 로고
    • Celebrating the enigma: The continuing puzzle of the Toyota Production System
    • New, S., 2007. Celebrating the enigma: the continuing puzzle of the Toyota Production System. International Journal of Production Research, 45(16), 3545-3554.
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3545-3554
    • New, S.1
  • 42
    • 0031235185 scopus 로고    scopus 로고
    • The impact of just-in-time manufacturing and its infrastructure on manufacturing performance
    • Sakakibara, S., et al., 1997. The impact of just-in-time manufacturing and its infrastructure on manufacturing performance. Management Science, 43(9), 1246-1257.
    • (1997) Management Science , vol.43 , Issue.9 , pp. 1246-1257
    • Sakakibara, S.1
  • 48
    • 0002986901 scopus 로고
    • Manufacturing - Missing link in corporate strategy
    • Skinner, W., 1969. Manufacturing - missing link in corporate strategy. Harvard Business Review, 47, 136-145.
    • (1969) Harvard Business Review , vol.47 , pp. 136-145
    • Skinner, W.1
  • 49
    • 0002623534 scopus 로고    scopus 로고
    • Decoding the DNA of the Toyota Production System
    • Spear, S. and Bowen, H. K., 1999. Decoding the DNA of the Toyota Production System. Harvard Business Review, 77(5), 96-106.
    • (1999) Harvard Business Review , vol.77 , Issue.5 , pp. 96-106
    • Spear, S.1    Bowen, H.K.2
  • 51
    • 0017557653 scopus 로고
    • Toyota production system and kanban system - Materialisation of justin-time and respect-for-human system
    • Sugimori, Y., et al., 1977. Toyota Production System and Kanban system - materialisation of justin-time and respect-for-human system. International Journal of Production Research, 15(6), 553-564.
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1
  • 52
    • 34547342654 scopus 로고    scopus 로고
    • Exploiting the DNA of the Toyota Production System
    • Towill, D. R., 2007. Exploiting the DNA of the Toyota Production System. International Journal of Production Research, 45(16), 3619-3637.
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3619-3637
    • Towill, D.R.1
  • 53
    • 33746209248 scopus 로고    scopus 로고
    • Maintaining preventive maintenance and maintenance prevention: Analysing the dynamic implications of Total Productive Maintenance
    • Thun, J.-H., 2006. Maintaining preventive maintenance and maintenance prevention: analysing the dynamic implications of Total Productive Maintenance. System Dynamics Review, 22(2), 163-179.
    • (2006) System Dynamics Review , vol.22 , Issue.2 , pp. 163-179
    • Thun, J.-H.1
  • 54
    • 58849147529 scopus 로고    scopus 로고
    • Path dependence, initial conditions, and routines in organisations - The Toyota production system re-examined
    • Van Driel, H. and Dolfsma, W., 2009. Path dependence, initial conditions, and routines in organisations - the Toyota Production System re-examined. Journal of Organisational Change Management, 22(1), 49-72.
    • (2009) Journal of Organisational Change Management , vol.22 , Issue.1 , pp. 49-72
    • Van Driel, H.1    Dolfsma, W.2
  • 55
    • 0030784413 scopus 로고    scopus 로고
    • Cellular manufacturing at 46 user plants: Implementation experiences and performance improvements
    • Wemmerlöv, U. and Johnson, D. J., 1997. Cellular manufacturing at 46 user plants: Implementation experiences and performance improvements. International Journal of Production Research, 35(1), 29-49.
    • (1997) International Journal of Production Research , vol.35 , Issue.1 , pp. 29-49
    • Wemmerlöv, U.1    Johnson, D.J.2
  • 56
    • 0024731850 scopus 로고
    • Cellular manufacturing in the U. S. industry: A survey of users
    • Wemmerlöv, U. and Hyer, N. L., 1989. Cellular manufacturing in the U. S. industry: A survey of users. International Journal of Production Research, 27(9), 1511-1530.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1511-1530
    • Wemmerlöv, U.1    Hyer, N.L.2
  • 57
    • 0032626924 scopus 로고    scopus 로고
    • Just-in-time manufacturing: A survey of implementations in small and large U. S. manufacturers
    • White, R. E., Pearson, J. N., and Wilson, J. R., 1999. Just-in-time manufacturing: A survey of implementations in small and large U. S. manufacturers. Management Science, 45(1), 1-15.
    • (1999) Management Science , vol.45 , Issue.1 , pp. 1-15
    • White, R.E.1    Pearson, J.N.2    Wilson, J.R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.