메뉴 건너뛰기




Volumn 4, Issue 6, 2010, Pages 555-567

Regulatory, technical and financial challenges in the grid connection of wave energy devices

Author keywords

[No Author keywords available]

Indexed keywords

COMMERCIAL OPERATION; DEVICE DESIGN; ECONOMIC CHALLENGES; GENERATOR SYSTEMS; GRID CONNECTIONS; OCEAN-WAVE ENERGY; WAVE ENERGY DEVICES;

EID: 78149418868     PISSN: 17521416     EISSN: 17521424     Source Type: Journal    
DOI: 10.1049/iet-rpg.2009.0187     Document Type: Article
Times cited : (27)

References (29)
  • 1
  • 2
    • 78149419553 scopus 로고    scopus 로고
    • Wind Energy: 'A vision for Europe in 2030'. Advisory Council of the European Wind Energy Technology Platform 2006, available at
    • Wind Energy: 'A vision for Europe in 2030'. Advisory Council of the European Wind Energy Technology Platform 2006, available at http://www.windplatform.eu/fileadmin/ewetp_docs/Structure/061003Vision_final.pdf
  • 3
    • 78149446736 scopus 로고    scopus 로고
    • Ocean Energy: 'Development & evaluation protocol. Part 1: wave power'. Hydraulics & Maritime Research Centre, September 2003, available at:
    • Ocean Energy: 'Development & evaluation protocol. Part 1: wave power'. Hydraulics & Maritime Research Centre, September 2003, available at: http://www.marine.ie/NR/rdonlyres/870BA9C2-B58E-4230-A4BD-5CE031A276DC/0/deweprotocol.pdf
  • 4
    • 78149430851 scopus 로고    scopus 로고
    • Scott, N.C.: 'European practices with grid connection, reinforcement, constraint and charging of renewable energy projects'. Highlands and Islands Enterprise, 1st August 2007, available at:
    • Scott, N.C.: 'European practices with grid connection, reinforcement, constraint and charging of renewable energy projects'. Highlands and Islands Enterprise, 1st August 2007, available at: http://www.hie.co.uk/HIE-economic-reports-2007/EU-practices-grid-connection.pdf
  • 5
    • 0242294003 scopus 로고    scopus 로고
    • Directive 2001/77/EC of the European Parliament and of the Council of 27 September 2001 on the promotion of electricity produced from renewable energy sources in the internal electricity market
    • Fontaine, N. Picque, C.: 'Directive 2001/77/EC of the European Parliament and of the Council of 27 September 2001 on the promotion of electricity produced from renewable energy sources in the internal electricity market', Off. J. Eur. Commun., 2001, 283, p. 33-40
    • (2001) Off. J. Eur. Commun. , vol.283 , pp. 33-40
    • Fontaine, N.1    Picque, C.2
  • 6
    • 41849131022 scopus 로고    scopus 로고
    • Conditions and costs for renewables electricity grid connection: examples in Europe
    • et al. 0960-1481
    • Swider, D.J. Beurskens, L. Davidson, S.: et al. 'Conditions and costs for renewables electricity grid connection: examples in Europe', Renew. Energy, 2008, 33, p. 1832-1842, 0960-1481
    • (2008) Renew. Energy , vol.33 , pp. 1832-1842
    • Swider, D.J.1    Beurskens, L.2    Davidson, S.3
  • 7
    • 78149431359 scopus 로고    scopus 로고
    • Eirgrid/ESB Networks: 'Joint TSO/DSO group processing approach pricing principles guidelines'. 27th February 2007, available at
    • Eirgrid/ESB Networks: 'Joint TSO/DSO group processing approach pricing principles guidelines'. 27th February 2007, available at http://www.esb.ie/esbnetworks/downloads/joing_tso_dso_gpa_final_pricing.pdf
  • 8
    • 78149423852 scopus 로고    scopus 로고
    • ESB Networks: 'Application fees for embedded generators'. 2008, available at:
    • ESB Networks: 'Application fees for embedded generators'. 2008, available at: http://www.esb.ie/esbnetworks/downloads/application_fees_for_embedded_generators_may_2008.pdf
  • 9
    • 78149431614 scopus 로고    scopus 로고
    • EirGrid: 'Statement of charges'. 17th December 2008, available at:
    • EirGrid: 'Statement of charges'. 17th December 2008, available at: http://www.eirgrid.com/media/2009%20Statement%20of%20Charges%20v1.0%20%E2%80%93%20CER%20approved.pdf
  • 10
    • 78149439636 scopus 로고    scopus 로고
    • ESB Networks: 'Schedule of operation & maintenance charges 2009'. 2009, available at:
    • ESB Networks: 'Schedule of operation & maintenance charges 2009'. 2009, available at: http://www.esb.ie/esbnet-works/downloads/esbnetworks_operation_maintenance_charges_2009.pdf
  • 11
    • 0036747177 scopus 로고    scopus 로고
    • Variable-speed wind power generation using doubly fed wound rotor induction machine - a comparison with alternative schemes, Energy Conversion
    • Datta, R. Ranganathan, V.T.: 'Variable-speed wind power generation using doubly fed wound rotor induction machine - a comparison with alternative schemes, Energy Conversion', IEEE Trans. On, 2002, 17, p. 414-421
    • (2002) IEEE Trans. On , vol.17 , pp. 414-421
    • Datta, R.1    Ranganathan, V.T.2
  • 14
    • 78149459153 scopus 로고    scopus 로고
    • ESB Networks: 'Distribution code'. October 2007, available at:
    • ESB Networks: 'Distribution code'. October 2007, available at: http://www.esb.ie/esbnetworks/downloads/distribution_code_cer_approved_2007.pdf
  • 15
    • 78149418314 scopus 로고    scopus 로고
    • EirGrid: 'EirGrid grid code version 3.4'. 16th October 2009, available at:
    • EirGrid: 'EirGrid grid code version 3.4'. 16th October 2009, available at: http://www.eirgrid.com/media/EirGrid%20Grid%20Code%20Version%203.4.pdf
  • 16
    • 78149457119 scopus 로고    scopus 로고
    • International Electrotechnical Commission: 'Electromagnetic compatibility (EMC) - part 3-7: 'limits - assessment of emission limits for the connection of fluctuating installations to MV, HV and EHV power systems'. February 2008, available at:
    • International Electrotechnical Commission: 'Electromagnetic compatibility (EMC) - part 3-7: 'limits - assessment of emission limits for the connection of fluctuating installations to MV, HV and EHV power systems'. February 2008, available at: http://webstore.iec.ch/preview/info_iec61000-3-7%7Bed2.0%7Den.pdf
  • 17
    • 27844532058 scopus 로고    scopus 로고
    • Design, simulation, and testing of a novel hydraulic power take-off system for the Pelamis wave energy converter
    • 10.1016/j.renene.2005.08.021, 0960-1481
    • Henderson, R.: 'Design, simulation, and testing of a novel hydraulic power take-off system for the Pelamis wave energy converter', Renew. Energy, 2006, 31, p. 271-283, 10.1016/j.renene.2005.08.021, 0960-1481
    • (2006) Renew. Energy , vol.31 , pp. 271-283
    • Henderson, R.1
  • 18
    • 27844508104 scopus 로고    scopus 로고
    • Prototype testing of the wave energy converter wave dragon
    • 0960-1481, 31
    • Kofoed, J.P. Frigaard, P. Friis-Madsen, E. Sørensen, H.C.: 'Prototype testing of the wave energy converter wave dragon', Renew. Energy, 2006, 31, p. 181-189, 0960-1481
    • (2006) Renew. Energy , pp. 181-189
    • Kofoed, J.P.1    Frigaard, P.2    Friis-Madsen, E.3    Sørensen, H.C.4
  • 20
    • 35548983520 scopus 로고    scopus 로고
    • Evaluation of the suitability of a fixed speed wind turbine for large scale wind farms considering the new UK grid code
    • 0960-1481
    • El-Helw, H.M. Tennakoon, S.B.: 'Evaluation of the suitability of a fixed speed wind turbine for large scale wind farms considering the new UK grid code', Renew. Energy, 2008, 33, p. 1-12, 0960-1481
    • (2008) Renew. Energy , vol.33 , pp. 1-12
    • El-Helw, H.M.1    Tennakoon, S.B.2
  • 21
    • 33847371286 scopus 로고    scopus 로고
    • Fault ride-through capability of DFIG wind turbines
    • 10.1016/j.renene.2006.10.008, 0960-1481
    • Hansen, A.D. Michalke, G.: 'Fault ride-through capability of DFIG wind turbines', Renew. Energy, 2007, 32, p. 1594-1610, 10.1016/j.renene.2006.10.008, 0960-1481
    • (2007) Renew. Energy , vol.32 , pp. 1594-1610
    • Hansen, A.D.1    Michalke, G.2
  • 22
    • 78149438326 scopus 로고    scopus 로고
    • Marine Institute/ESB International: 'Wave energy network connection project: site evaluation and selection report'. April 2008
    • Marine Institute/ESB International: 'Wave energy network connection project: site evaluation and selection report'. April 2008
  • 23
    • 78149436847 scopus 로고    scopus 로고
    • Eirgrid: 'Transmission connection charging methodology statement'. 14th March 2008, available at:
    • Eirgrid: 'Transmission connection charging methodology statement'. 14th March 2008, available at: http://www.allislandproject.org/en/generation.aspx?article=16f054e8-4338-4c77-a6bb-0c6eb1fa18cf
  • 24
    • 78149454028 scopus 로고    scopus 로고
    • ESB Networks: 'Standard prices for generators 2009'. 2009, available at:
    • ESB Networks: 'Standard prices for generators 2009'. 2009, available at: http://www.esb.ie/esbnetworks/downloads/approved_charges_cer_2009.pdf
  • 25
    • 78149425813 scopus 로고    scopus 로고
    • O.T.E. Group: 'Recommendations for the coverage of offshore transmission networks in the Great Britain security and quality of supply standard'. Department for Business, Enterprise and Regulatory Reform (BERR), September 2006, available at:
    • O.T.E. Group: 'Recommendations for the coverage of offshore transmission networks in the Great Britain security and quality of supply standard'. Department for Business, Enterprise and Regulatory Reform (BERR), September 2006, available at: http://www.berr.gov.uk/energy/sources/renewables/policy/offshore-transmission/oteg/gb-sqss/final%20recommendations/page34541.html
  • 26
    • 78149427444 scopus 로고    scopus 로고
    • Wind turbine design cost and scaling model Technical report National Renewable Energy Laboratory, December, 2006 available at:
    • 'Wind turbine design cost and scaling model', Technical report, National Renewable Energy Laboratory, December, 2006 available at: http://www.nrel.gov/wind/pdfs/40566.pdf
  • 27
    • 84891392348 scopus 로고    scopus 로고
    • Wind turbines: fundamentals, technologies, application, economics
    • 2nd Springer
    • Hau, E.: 'Wind turbines: fundamentals, technologies, application, economics', 2nd(Springer 2005)
    • (2005)
    • Hau, E.1
  • 28
    • 78149452241 scopus 로고    scopus 로고
    • U.S. Department of Labor: 'Bureau of labor statistics', 2009, available at:
    • U.S. Department of Labor: 'Bureau of labor statistics', 2009, available at: http://www.bls.gov/pPI/
  • 29
    • 78149425570 scopus 로고    scopus 로고
    • Halcrow: 'Wave hub development and design phase: final design report', South West of England Regional Development Agency, June 2006, available at:
    • Halcrow: 'Wave hub development and design phase: final design report', South West of England Regional Development Agency, June 2006, available at: http://download.southwestrda.org.uk/projects/general/wavehub-finaldesignreport.pdf


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.