메뉴 건너뛰기




Volumn 61, Issue 9, 2010, Pages 845-851

Technical and industrial issues of Advanced Planning and Scheduling (APS) systems

Author keywords

APS; ERP; Planning and scheduling

Indexed keywords

ADVANCED PLANNING AND SCHEDULING; ADVANCED PLANNING AND SCHEDULING SYSTEMS; APS; CONSTRAINT-BASED; ERP; PENALTY FACTOR; PLANNING AND SCHEDULING; PLANNING PARAMETERS;

EID: 78049258225     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compind.2010.07.009     Document Type: Article
Times cited : (71)

References (23)
  • 4
    • 0034888601 scopus 로고    scopus 로고
    • Enterprise resource planning: Analysing the impact
    • M. Kennerly, and A. Neely Enterprise resource planning: analysing the impact Integrated Manufacturing System 2001 103 113 February
    • (2001) Integrated Manufacturing System , pp. 103-113
    • Kennerly, M.1    Neely, A.2
  • 5
    • 0036660574 scopus 로고    scopus 로고
    • Implementing a distribution-network decision-support system at Pfizer/Warner-Lambert
    • V. Gupta, E. Peter, T. Miller, and K. Blyden Implementing a distribution-network decision-support system at Pfizer/Warner-Lambert Interfaces 32 4 2002 28 45
    • (2002) Interfaces , vol.32 , Issue.4 , pp. 28-45
    • Gupta, V.1    Peter, E.2    Miller, T.3    Blyden, K.4
  • 6
    • 0035566749 scopus 로고    scopus 로고
    • The Kellogg company optimizes production, inventory and distribution
    • G. Brown, J. Keegan, B. Vigus, and K. Wood The Kellogg company optimizes production, inventory and distribution Interfaces 31 6 2001 1 15
    • (2001) Interfaces , vol.31 , Issue.6 , pp. 1-15
    • Brown, G.1    Keegan, J.2    Vigus, B.3    Wood, K.4
  • 9
    • 0346452454 scopus 로고    scopus 로고
    • Overcoming intricacies of ERP system implementation
    • D. Schell Overcoming intricacies of ERP system implementation Integrated Solutions 2002 2
    • (2002) Integrated Solutions , pp. 2
    • Schell, D.1
  • 11
    • 0035306469 scopus 로고    scopus 로고
    • Enterprise integration: Join the successful 20%
    • G. Funk Enterprise integration: join the successful 20% Hydrocarbon Processing 80 2001 4
    • (2001) Hydrocarbon Processing , vol.80 , pp. 4
    • Funk, G.1
  • 12
  • 13
    • 33847393339 scopus 로고    scopus 로고
    • Enterprise resource planning (ERP) - A brief history
    • F. Jacobs, and F.C. Weston Enterprise resource planning (ERP) - a brief history Journal of Operations Management 31 2007 357 363
    • (2007) Journal of Operations Management , vol.31 , pp. 357-363
    • Jacobs, F.1    Weston, F.C.2
  • 14
    • 0041660617 scopus 로고
    • Behind the growth in materials requirements planning
    • J. Miller, and L. Sprague Behind the growth in materials requirements planning Harward Business Review September-October 1975
    • (1975) Harward Business Review
    • Miller, J.1    Sprague, L.2
  • 16
    • 3843059064 scopus 로고    scopus 로고
    • Managing the unmanageable: Integrating the supply chain with new developments in software
    • F.B. Green Managing the unmanageable: integrating the supply chain with new developments in software Supply Chain Management: An International Journal 6 2001 208 211
    • (2001) Supply Chain Management: An International Journal , vol.6 , pp. 208-211
    • Green, F.B.1
  • 17
    • 78049308608 scopus 로고    scopus 로고
    • Beyond supply chain optimization to enterprise optimization
    • LLC, Ascet Volume 3, April
    • J. Shapiro, Beyond supply chain optimization to enterprise optimization, SLIM Technologies, LLC, Ascet Volume 3, April, www.ascet.com/documents.asp?d-ID= 511, 2001.
    • SLIM Technologies
    • Shapiro, J.1
  • 19
    • 0026124209 scopus 로고
    • A branch-and-cut algorithm for a symmetric travelling salesman polytope
    • M.W Padberg, and G. Rinaldi A branch-and-cut algorithm for a symmetric travelling salesman polytope SIAM Review 33 1991 60 100
    • (1991) SIAM Review , vol.33 , pp. 60-100
    • Padberg, M.W.1    Rinaldi, G.2
  • 20
    • 0037870067 scopus 로고    scopus 로고
    • Mixed 0-1 programming by lift-and-project in a branch-and-cut framework
    • E. Balas, S. Ceria, and G. Cornuejols Mixed 0-1 programming by lift-and-project in a branch-and-cut framework Management Science 42 1996 1229 1246
    • (1996) Management Science , vol.42 , pp. 1229-1246
    • Balas, E.1    Ceria, S.2    Cornuejols, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.