메뉴 건너뛰기




Volumn , Issue , 2008, Pages

Solving high fidelity, large-scale traffic flow management problems in reduced time

Author keywords

[No Author keywords available]

Indexed keywords

SCHEDULING; SCHEDULING ALGORITHMS;

EID: 77958509992     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.2514/6.2008-8910     Document Type: Conference Paper
Times cited : (19)

References (19)
  • 4
    • 4944258903 scopus 로고    scopus 로고
    • New approach for modeling, analysis, and control of air traffic flow
    • Menon, P., Sweridul, G., and Bilimoria, K., "New Approach for Modeling, Analysis, and Control of Air Traffic Flow," Journal of Guidance, Control, and Dynamics, Vol. 27, No. 5, 2004, pp. 737-744.
    • (2004) Journal of Guidance, Control, and Dynamics , vol.27 , Issue.5 , pp. 737-744
    • Menon, P.1    Sweridul, G.2    Bilimoria, K.3
  • 5
    • 33747608388 scopus 로고    scopus 로고
    • Adjoint-based control of a new Eulerian network model of air traffic ow
    • September
    • Bayen, A. M., Raffard, R. L., and Tomlin, C. J., "Adjoint-based control of a new Eulerian network model of air traffic ow," IEEE Transactions on Control Systems Technology, Vol. 14, No. 5, September 2006, pp. 804-818.
    • (2006) IEEE Transactions on Control Systems Technology , vol.14 , Issue.5 , pp. 804-818
    • Bayen, A.M.1    Raffard, R.L.2    Tomlin, C.J.3
  • 6
    • 0001188860 scopus 로고    scopus 로고
    • The air traffic flow management problem with enroute capacities
    • May-June
    • Bertsimas, D. and Patterson, S. S., "The Air traffic Flow Management Problem with Enroute Capacities," Operations Research, Vol. 46, No. 3, May-June 1998, pp. 406-422.
    • (1998) Operations Research , vol.46 , Issue.3 , pp. 406-422
    • Bertsimas, D.1    Patterson, S.S.2
  • 8
    • 58749102796 scopus 로고    scopus 로고
    • The european air traffic flow management problem
    • November
    • Lulli, G. and Odoni, A. R., "The European Air Traffic Flow Management Problem," Transportation Science, Vol. 41, No. 4, November 2007, pp. 431-443.
    • (2007) Transportation Science , vol.41 , Issue.4 , pp. 431-443
    • Lulli, G.1    Odoni, A.R.2
  • 9
    • 37248999848 scopus 로고    scopus 로고
    • Delay optimization for airspace capacity management with runtime and equity considerations
    • Hilton Head, South Carolina, August
    • Rios, J. and Ross, K., "Delay Optimization for Airspace Capacity Management with Runtime and Equity Considerations," AIAA Guidance, Navigation, and Control Conference and Exhibit, Hilton Head, South Carolina, August 2007.
    • (2007) AIAA Guidance, Navigation, and Control Conference and Exhibit
    • Rios, J.1    Ross, K.2
  • 17
    • 77958473707 scopus 로고    scopus 로고
    • ILOG Inc., April
    • ILOG, Inc., "ILOG CPLEX," http://www.ilog.com/products/cplex/, April 2007.
    • (2007)
  • 18
    • 75749087063 scopus 로고    scopus 로고
    • Upgrade and technology transfer of the san francisco marine stratus forecast system to the national weather service
    • Atlanta, GA, January
    • Ivaldi, C. and Reynolds, D., "Upgrade and Technology Transfer of the San Francisco Marine Stratus Forecast System to the National Weather Service," 12th Conf. on Aviation, Range and Aerospace Meteorology, Atlanta, GA, January 2006.
    • (2006) 12th Conf. on Aviation, Range and Aerospace Meteorology
    • Ivaldi, C.1    Reynolds, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.