메뉴 건너뛰기




Volumn , Issue , 2010, Pages 229-238

Reducing delay jitter of real-time control tasks through adaptive deadline adjustments

Author keywords

[No Author keywords available]

Indexed keywords

ADAPTIVE FRAMEWORK; CONTROL PERFORMANCE; CONTROL TASK; DELAY JITTERS; DELAY VARIATION; PHYSICAL ENVIRONMENTS; REAL-TIME CONTROL TASK; TASK WORKLOADS;

EID: 77958494184     PISSN: 10683070     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ECRTS.2010.10     Document Type: Conference Paper
Times cited : (9)

References (33)
  • 2
    • 6944255543 scopus 로고    scopus 로고
    • Control tasks delay reduction under static and dynamic scheduling policies
    • P. Balbastre, I. Ripoll, and A. Crespo, "Control tasks delay reduction under static and dynamic scheduling policies," in RTCSA '00.
    • RTCSA '00
    • Balbastre, P.1    Ripoll, I.2    Crespo, A.3
  • 3
    • 33947617885 scopus 로고    scopus 로고
    • Optimal deadline assignment for periodic real-time tasks in dynamic priority systems
    • P. Balbastre, I. Ripoll, and A. Crespo "Optimal deadline assignment for periodic real-time tasks in dynamic priority systems," in ECRTS '06.
    • ECRTS '06
    • Balbastre, P.1    Ripoll, I.2    Crespo, A.3
  • 4
    • 36849051330 scopus 로고    scopus 로고
    • Minimum deadline calculation for periodic real-time tasks in dynamic priority systems
    • P. Balbastre, I. Ripoll, and A. Crespo "Minimum deadline calculation for periodic real-time tasks in dynamic priority systems," IEEE Trans. Comput., vol. 57, no. 1, 2008.
    • (2008) IEEE Trans. Comput. , vol.57 , Issue.1
    • Balbastre, P.1    Ripoll, I.2    Crespo, A.3
  • 6
    • 35348839839 scopus 로고    scopus 로고
    • Sustainable scheduling analysis
    • S. Baruah and A. Burns, "Sustainable scheduling analysis," in RTSS '06.
    • RTSS '06
    • Baruah, S.1    Burns, A.2
  • 7
    • 34249956267 scopus 로고
    • Algorithms and complexity concerning the preemptive scheduling of periodic, real-time tasks on one processor
    • S. K. Baruah, L. E. Rosier, and R. R. Howell, "Algorithms and complexity concerning the preemptive scheduling of periodic, real-time tasks on one processor," Real-Time Syst., vol. 2, no. 4, 1990.
    • (1990) Real-Time Syst. , vol.2 , Issue.4
    • Baruah, S.K.1    Rosier, L.E.2    Howell, R.R.3
  • 9
    • 46449124539 scopus 로고    scopus 로고
    • Real-time control and scheduling co-design for efficient jitter handling
    • M. Behnam and D. Isovic, "Real-time control and scheduling co-design for efficient jitter handling," in RTCSA '07.
    • RTCSA '07
    • Behnam, M.1    Isovic, D.2
  • 10
    • 67249145644 scopus 로고    scopus 로고
    • Delay-aware period assignment in control systems
    • E. Bini. and A. Cervin, "Delay-aware period assignment in control systems," in RTSS '08.
    • RTSS '08
    • Bini, E.1    Cervin, A.2
  • 11
    • 57849153894 scopus 로고    scopus 로고
    • The space of edf deadlines: The exact region and a convex approximation
    • E. Bini and G. Buttazzo, "The space of edf deadlines: the exact region and a convex approximation," Real-Time Syst., vol. 41, no. 1, 2009.
    • Real-Time Syst. , vol.41 , Issue.1 , pp. 2009
    • Bini, E.1    Buttazzo, G.2
  • 12
    • 47849130306 scopus 로고    scopus 로고
    • Comparative assessment and evaluation of jitter control methods
    • G. Buttazzo and A. Cervin, "Comparative assessment and evaluation of jitter control methods," in RTNS '07.
    • RTNS '07
    • Buttazzo, G.1    Cervin, A.2
  • 13
    • 0036642330 scopus 로고    scopus 로고
    • Adaptive workload management through elastic scheduling
    • DOI 10.1023/A:1015342318358
    • G. Buttazzo and L. Abeni, "Adaptive workload management through elastic scheduling," Real-Time Syst., vol. 23, no. 1/2, pp. 7-24, 2002. (Pubitemid 34658880)
    • (2002) Real-Time Systems , vol.23 , Issue.1-2 , pp. 7-24
    • Buttazzo, G.1    Abeni, L.2
  • 15
    • 0344794029 scopus 로고    scopus 로고
    • PHD Thesis, Department of Automatic Control, Lund Institute of Technology
    • A. Cervin, "Integrated control and real-time scheduling," in PHD Thesis, Department of Automatic Control, Lund Institute of Technology, 2003.
    • (2003) Integrated Control and Real-time Scheduling
    • Cervin, A.1
  • 17
    • 77958482525 scopus 로고    scopus 로고
    • The jitter margin and its application in the design of real-time control systems
    • A. Cervin, B. Lincoln, J. Eker, K.-E. Arzen, and G. Buttazzo, "The jitter margin and its application in the design of real-time control systems," in RTCSA '04.
    • RTCSA '04
    • Cervin, A.1    Lincoln, B.2    Eker, J.3    Arzen, K.-E.4    Buttazzo, G.5
  • 18
    • 63049128704 scopus 로고    scopus 로고
    • Generalized elastic scheduling for real-time tasks
    • T.T. Chantem, X. S. Hu, and M. D. Lemmon, "Generalized elastic scheduling for real-time tasks," IEEE Trans. Comput., vol. 58, no. 4, 2009.
    • (2009) IEEE Trans. Comput. , vol.58 , Issue.4
    • Chantem, T.T.1    Hu, X.S.2    Lemmon, M.D.3
  • 19
    • 77958508429 scopus 로고    scopus 로고
    • Reducing delays in rt control: The control action interval, decision and control
    • A. Crespo, I. Ripoll, and P. Albertos, "Reducing delays in rt control: The control action interval, decision and control," in IFAC '99.
    • IFAC '99
    • Crespo, A.1    Ripoll, I.2    Albertos, P.3
  • 20
    • 77958488263 scopus 로고    scopus 로고
    • Anytime control algorithms for embedded real-time systems
    • D. Fontanelli, L. Greco, and A. Bicchi, "Anytime control algorithms for embedded real-time systems," in HSCC '08.
    • HSCC '08
    • Fontanelli, D.1    Greco, L.2    Bicchi, A.3
  • 21
  • 22
    • 77958469743 scopus 로고    scopus 로고
    • Optimal control of lti systems with scheduled measurements and control
    • O. Imer and T. Basar, "Optimal control of lti systems with scheduled measurements and control," in ACC '06.
    • ACC '06
    • Imer, O.1    Basar, T.2
  • 23
    • 0030403362 scopus 로고    scopus 로고
    • Visual assessment of a real-time system design: A case study on a cnc controller
    • N. Kim, M. Ryu, S. Hong, M. Saksena, C.-H. Choi, and H. Shin, "Visual assessment of a real-time system design: a case study on a cnc controller," in RTSS '96.
    • RTSS '96
    • Kim, N.1    Ryu, M.2    Hong, S.3    Saksena, M.4    Choi, C.-H.5    Shin, H.6
  • 24
    • 77958486861 scopus 로고    scopus 로고
    • Deadline assignment to reduce output jitter of real-time tasks
    • T. Kim, H. Shin, and N. Chang, "Deadline assignment to reduce output jitter of real-time tasks," in IFAC '00.
    • IFAC,'00
    • Kim, T.1    Shin, H.2    Chang, N.3
  • 25
    • 0036990396 scopus 로고    scopus 로고
    • Jitterbug: A tool for analysis of real-time control performance
    • Dec. 2002
    • B. Lincoln and A. Cervin, "Jitterbug: a tool for analysis of real-time control performance," in Decision and Control, 2002, vol. 2, Dec. 2002.
    • (2002) Decision and Control , vol.2
    • Lincoln, B.1    Cervin, A.2
  • 27
    • 0026392075 scopus 로고    scopus 로고
    • Building a predictable avionics platform in ada: A case study
    • C. Locke, D. Vogel, and T. Mesler, "Building a predictable avionics platform in ada: a case study," in RTSS '91.
    • RTSS, '91
    • Locke, C.1    Vogel, D.2    Mesler, T.3
  • 29
    • 0002507796 scopus 로고    scopus 로고
    • Real-time dynamic voltage scaling for lowpower embedded operating systems
    • P. Pillai and K. G. Shin, "Real-time dynamic voltage scaling for lowpower embedded operating systems," in SOSP '01.
    • SOSP '01
    • Pillai, P.1    Shin, K.G.2
  • 30
    • 0036995549 scopus 로고    scopus 로고
    • State-dependent deadline scheduling
    • C.-S. Shih and J. W. S. Liu, "State-dependent deadline scheduling," in RTSS '02.
    • RTSS '02
    • Shih, C.-S.1    Liu, J.W.S.2
  • 31
    • 77958167554 scopus 로고    scopus 로고
    • Acquiring and incorporating state-dependent timing requirements
    • S. Shih and S. Liu, "Acquiring and incorporating state-dependent timing requirements," Requir. Eng., vol. 9, no. 2, 2004.
    • (2004) Requir. Eng. , vol.9 , Issue.2
    • Shih, S.1    Liu, S.2
  • 32
    • 0035279683 scopus 로고    scopus 로고
    • Intra-task voltage scheduling for lowenergy, hard real-time applications
    • D. Shin, J. Kim, and S. Lee, "Intra-task voltage scheduling for lowenergy, hard real-time applications," IEEE Des. Test, vol. 18, no. 2, 2001.
    • (2001) IEEE Des. Test , vol.18 , Issue.2
    • Shin, D.1    Kim, J.2    Lee, S.3
  • 33
    • 0004081537 scopus 로고    scopus 로고
    • Analysis of deadline scheduled real-time systems
    • M. Spuri, "Analysis of deadline scheduled real-time systems." INRIA, 1996.
    • (1996) INRIA
    • Spuri, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.