메뉴 건너뛰기




Volumn 50, Issue 1-4, 2010, Pages 329-341

Availability modelling and analysis of multi-product flexible transfer lines subject to random failures

Author keywords

Availability assessment; Flexible transfer lines; Multi products; Operation dependent failures; Simulation modelling

Indexed keywords

AVAILABILITY ASSESSMENT; MULTI-PRODUCTS; OPERATION-DEPENDENT FAILURE; SIMULATION MODELLING; TRANSFER LINES;

EID: 77958023357     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-009-2487-8     Document Type: Article
Times cited : (7)

References (23)
  • 1
    • 21144476000 scopus 로고
    • Design of manufacturing systems using queueing models
    • Buzacott JA, Shanthikumar JG (1992) Design of manufacturing systems using queueing models. Queueing Syst 12:135-213
    • (1992) Queueing Syst , vol.12 , pp. 135-213
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 4
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos HT, Heavey C (1996) Queueing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines. Eur J Oper Res 92:1-27
    • (1996) Eur J Oper Res , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 5
    • 15544367685 scopus 로고    scopus 로고
    • Toward a deeper understanding of the availability of series-systems without aging during repairs
    • Schneeweiss WG (2005) Toward a deeper understanding of the availability of series-systems without aging during repairs. IEEE Trans Reliab 54:98-99
    • (2005) IEEE Trans Reliab , vol.54 , pp. 98-99
    • Schneeweiss, W.G.1
  • 6
    • 84946975124 scopus 로고
    • Prediction of the efficiency of production systems without internal storage
    • Buzacott JA (1968) Prediction of the efficiency of production systems without internal storage. Int J Prod Re 6:173-188
    • (1968) Int J Prod Re , vol.6 , pp. 173-188
    • Buzacott, J.A.1
  • 8
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery Y, Gershwin SB (1992) Manufacturing flow line systems: a review of models and analytical results. Queueing Syst 12:3-94
    • (1992) Queueing Syst , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 9
    • 33644664806 scopus 로고    scopus 로고
    • A hybrid genetic algorithm approach to mixed-model assembly line balancing
    • Haq AN, Rengarajan K, Jayaprakash J (2006) A hybrid genetic algorithm approach to mixed-model assembly line balancing. Int J Adv Manuf Technol 28:337-341
    • (2006) Int J Adv Manuf Technol , vol.28 , pp. 337-341
    • Haq, A.N.1    Rengarajan, K.2    Jayaprakash, J.3
  • 10
    • 34247363205 scopus 로고    scopus 로고
    • An approach for balancing and sequencing mixed-model JIT U-lines
    • Kara Y, Ozcan U, Peker A (2007) An approach for balancing and sequencing mixed-model JIT U-lines. Int J Adv Manufac Technol 17:1218-1231
    • (2007) Int J Adv Manufac Technol , vol.17 , pp. 1218-1231
    • Kara, Y.1    Ozcan, U.2    Peker, A.3
  • 11
    • 1842454666 scopus 로고    scopus 로고
    • A balancing problem for mixed model assembly lines with a paced moving conveyor
    • Zhao X, Ohno K, Lau H-S (2004) A balancing problem for mixed model assembly lines with a paced moving conveyor. Nav Res Logist 51:446-464
    • (2004) Nav Res Logist , vol.51 , pp. 446-464
    • Zhao, X.1    Ohno, K.2    Lau, H.-S.3
  • 12
    • 55649094898 scopus 로고    scopus 로고
    • Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach
    • Javadi B, Rahimi-Vahed A, Rabbani M, Dangchi M (2008) Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach. Int J Adv Manufac Technol 39:975-982
    • (2008) Int J Adv Manufac Technol , vol.39 , pp. 975-982
    • Javadi, B.1    Rahimi-Vahed, A.2    Rabbani, M.3    Dangchi, M.4
  • 15
    • 70350562375 scopus 로고
    • Strategic model for reliability and availability in automatic manufacturing
    • Henoch BA (1988) Strategic model for reliability and availability in automatic manufacturing. Int J Adv Manuf Technol 3:99-121
    • (1988) Int J Adv Manuf Technol , vol.3 , pp. 99-121
    • Henoch, B.A.1
  • 16
    • 0023366797 scopus 로고
    • A general model of a production line with intermediate buffers and station breakdowns
    • Yeralan S, Muth EJ (1987) A general model of a production line with intermediate buffers and station breakdowns. IIE Trans 19:130-139
    • (1987) IIE Trans , vol.19 , pp. 130-139
    • Yeralan, S.1    Muth, E.J.2
  • 18
    • 0008236264 scopus 로고
    • Representation and analysis of transfer lines with machines that have different processing rates
    • Gershwin SB (1987) Representation and analysis of transfer lines with machines that have different processing rates. Ann Oper Res 9:511-530
    • (1987) Ann Oper Res , vol.9 , pp. 511-530
    • Gershwin, S.B.1
  • 19
    • 0024732503 scopus 로고
    • Approximate analysis of transfer lines with unreliable machines and finite buffers
    • Dallery Y, David R, Xie XL (1989) Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Trans Automat Contr 34:943-953
    • (1989) IEEE Trans Automat Contr , vol.34 , pp. 943-953
    • Dallery, Y.1    David, R.2    Xie, X.L.3
  • 20
    • 0025414457 scopus 로고
    • Approximate models of assembly systems with finite inventory banks
    • Liu XG, Buzacott JA (1990) Approximate models of assembly systems with finite inventory banks. Eur J Oper Res 45:143-154
    • (1990) Eur J Oper Res , vol.45 , pp. 143-154
    • Liu, X.G.1    Buzacott, J.A.2
  • 21
    • 0347540955 scopus 로고    scopus 로고
    • Transient throughput analysis for a series type system of machines in terms of alternating renewal processes
    • Chen CT, Yuan J (2004) Transient throughput analysis for a series type system of machines in terms of alternating renewal processes. Eur J Oper Res 155:178-197
    • (2004) Eur J Oper Res , vol.155 , pp. 178-197
    • Chen, C.T.1    Yuan, J.2
  • 22
    • 0021427333 scopus 로고
    • Two-stage production lines with a single repair crew
    • Savsar M, Biles WE (1984) Two-stage production lines with a single repair crew. Int J Prod Res 22:499-514
    • (1984) Int J Prod Res , vol.22 , pp. 499-514
    • Savsar, M.1    Biles, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.