Volumn , Issue , 2010, Pages

Transmission planning under uncertainty: A two-stage stochastic modelling approach

Author keywords

Decision making; Power transmission economics; Power transmission planning; Uncertainty

Indexed keywords

ECONOMIC CONSEQUENCES; ELECTRICITY TRANSMISSION; GREAT BRITAIN; INVESTMENT DECISIONS; MARKET RESPONSE; MODELLING APPROACHES; OPTION VALUE; POWER TRANSMISSION ECONOMICS; POWER TRANSMISSION PLANNING; STOCHASTIC MODELLING; TIME-PERIODS; TRANSMISSION INVESTMENTS; TRANSMISSION NETWORKS; TRANSMISSION PLANNING; TWO STAGE; UNCERTAINTY; VALUE OF INFORMATION;

EID: 77957787629     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/EEM.2010.5558763     Document Type: Conference Paper
Times cited : (12)

References (26)
  • 3
  • 5
    • 36348941912 scopus 로고    scopus 로고
    • Value-based transmission expansion planning of hydrothermal systems under uncertainty
    • G. C. Oliveira, S. Binato, and M. W. Pereira, "Value-Based Transmission Expansion Planning of Hydrothermal Systems Under Uncertainty," IEEE Trans. Power Systems, Vol. 22, pp. 1429-1435, 2007.
    • (2007) IEEE Trans. Power Systems , vol.22 , pp. 1429-1435
    • Oliveira, G.C.1    Binato, S.2    Pereira, M.W.3
  • 6
    • 68349154621 scopus 로고    scopus 로고
    • Market-based generation and transmission planning with uncertainties
    • J. Hyung Roh, M. Shahidehpour, and L. Wu, "Market-Based Generation and Transmission Planning With Uncertainties," IEEE Trans. Power Systems Vol. 24, pp. 1587-1598, 2009.
    • (2009) IEEE Trans. Power Systems , vol.24 , pp. 1587-1598
    • Hyung Roh, J.1    Shahidehpour, M.2    Wu, L.3
  • 7
    • 33845768321 scopus 로고    scopus 로고
    • Proactive planning and valuation of transmission investments in restructured electricity markets
    • E. E. Sauma, and S. S. Oren, "Proactive Planning and Valuation of Transmission Investments in Restructured Electricity Markets," Journal of Regulatory Economics 30, pp. 261-290, 2006.
    • (2006) Journal of Regulatory Economics , vol.30 , pp. 261-290
    • Sauma, E.E.1    Oren, S.S.2
  • 11
    • 85013456505 scopus 로고    scopus 로고
    • Can merchant interconnectors deliver lower and more stable prices? The case of NorNed
    • Nov.
    • V. Parail, "Can Merchant Interconnectors Deliver Lower and More Stable Prices? The Case of NorNed," EPRG Working Papers 0926, Nov. 2009.
    • (2009) EPRG Working Papers 0926
    • Parail, V.1
  • 14
    • 84861512840 scopus 로고    scopus 로고
    • Power system planning under uncertainty conditions: Criteria for transmission network flexibility evaluation
    • P. Bresesti, A. Capasso, M. C. Falvo, and S. Lauria, "Power System Planning Under Uncertainty Conditions: Criteria for Transmission Network Flexibility Evaluation," in Proc. 2003 IEEE Power Tech Conf..
    • Proc. 2003 IEEE Power Tech Conf.
    • Bresesti, P.1    Capasso, A.2    Falvo, M.C.3    Lauria, S.4
  • 16
    • 68349137984 scopus 로고    scopus 로고
    • A bilevel approach to transmission expansion planning within a market environment
    • 2009
    • L. P. Garcés, A. J. Conejo, R. García-Bertrand, and R. Romero (2009). "A Bilevel Approach to Transmission Expansion Planning Within a Market Environment," IEEE Trans. Power Systems, Vol. 24, pp. 1513-1522, 2009.
    • (2009) IEEE Trans. Power Systems , vol.24 , pp. 1513-1522
    • Garcés, L.P.1    Conejo, A.J.2    García-Bertrand, R.3    Romero, R.4
  • 20
    • 27844453390 scopus 로고    scopus 로고
    • NEA and IEA Paris: Nuclear Energy Agency and International Energy Agency, OECD
    • NEA and IEA, "Projected Costs of Generation Electricity - 2005 Update," Paris: Nuclear Energy Agency and International Energy Agency, OECD, 2005.
    • (2005) Projected Costs of Generation Electricity - 2005 Update
  • 22
    • 33750149515 scopus 로고    scopus 로고
    • Characteristics of the UK wind resource: Long-term patterns and relationship to electricity demand
    • G. Sinden, "Characteristics of the UK wind resource: Long-term patterns and relationship to electricity demand," Energy Policy, Vol. 35, pp. 112-127, 2007.
    • (2007) Energy Policy , vol.35 , pp. 112-127
    • Sinden, G.1
  • 25
    • 84912077165 scopus 로고    scopus 로고
    • Available
    • First Hydro Company, "Dinorwig Power Station," Available: http://www.fhc.co.uk/dinorwig.htm.
    • Dinorwig Power Station


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.