메뉴 건너뛰기




Volumn , Issue , 2008, Pages 708-716

Errors of calculations in M/M/1/FIFO/N/F model with limited duration of shift

Author keywords

Construction; Queueing theory; Work shift

Indexed keywords

CONSTRUCTION; EXCAVATION; ROBOTICS;

EID: 77956899674     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.3846/isarc.20080626.708     Document Type: Conference Paper
Times cited : (2)

References (8)
  • 3
    • 84862978714 scopus 로고    scopus 로고
    • [in Polish], Publishing of the AGH University of Science and Technology in Cracow, Cracow
    • Filipowicz B., Models of Queue Networks, [in Polish], Publishing of the AGH University of Science and Technology in Cracow, Cracow 1999. .
    • (1999) Models of Queue Networks
    • Filipowicz, B.1
  • 5
    • 84862990264 scopus 로고    scopus 로고
    • Modeling the cyclic building processes of random character exemplified by larges earthworks
    • [in Polish], Monograph 43, Sc, Zielona Góra
    • Przybylski, J., Modeling the Cyclic Building processes of Random Character Exemplified by Larges Earthworks, [in Polish], Monograph 43, Sc. Journal of Engineering College in Zielona Góra, Zielona Góra 1998.
    • (1998) Journal of Engineering College in Zielona Góra
    • Przybylski, J.1
  • 7
    • 84862983629 scopus 로고    scopus 로고
    • Analysis of the real work-shift time interval
    • [in Polish]
    • Wieckowski, A., Analysis of the Real Work-Shift Time Interval, [in Polish], Building Review, Warsaw 1/2007, pp. 20-24.
    • (2007) Building Review, Warsaw , vol.1 , pp. 20-24
    • Wieckowski, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.