Volumn 136, Issue 10, 2010, Pages 1129-1139

Improving planning reliability and project performance using the reliable commitment model

Author keywords

Commitment planning reliability; Decision making; Lean production; Matching load capacity; Project performance; Reliable commitment model; Statistical models

Indexed keywords

COMMITMENT PLANNING RELIABILITY; LEAN PRODUCTION; MATCHING LOAD-CAPACITY; PROJECT PERFORMANCE; RELIABLE COMMITMENT MODEL; STATISTICAL MODELS;

EID: 77956835629     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000215     Document Type: Article
Times cited : (50)

References (26)
  • 2
    • 8844280773 scopus 로고
    • Lean construction and EPC performance improvement
    • L. F. Alarcón, ed., Balkema, The Netherlands.
    • Ballard, G. (1993). " Lean construction and EPC performance improvement. " Lean construction, L. F. Alarcón, ed., Balkema, The Netherlands, 79-91.
    • (1993) Lean Construction , pp. 79-91
    • Ballard, G.1
  • 3
    • 0004011301 scopus 로고    scopus 로고
    • Ph.D. dissertation, School of Civil Engineering, Faculty of Engineering, The Univ. of Birmingham, Birmingham, U.K.
    • Ballard, G. (2000). " The last planner system of production control. " Ph.D. dissertation, School of Civil Engineering, Faculty of Engineering, The Univ. of Birmingham, Birmingham, U.K.
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 4
    • 12444343674 scopus 로고
    • Implementing lean construction: Improving downstream performance
    • L. F. Alarcón, ed., Balkema, Rotterdam, The Netherlands.
    • Ballard, G., and Howell, G. (1994). " Implementing lean construction: Improving downstream performance. " Lean construction, L. F. Alarcón, ed., Balkema, Rotterdam, The Netherlands, 111-125.
    • (1994) Lean Construction , pp. 111-125
    • Ballard, G.1    Howell, G.2
  • 5
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G. and Howell, G. (1998). " Shielding production: Essential step in production control. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 124, (1), 11-17. 10.1061/(ASCE)0733-9364(1998)124:1(11) (Pubitemid 128586379)
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 9
    • 57649231503 scopus 로고    scopus 로고
    • Multiobjective design of work-in-process buffer for scheduling repetitive building projects
    • " AUCOES 0926-5805, 10.1016/j.autcon.2008.05.005
    • González, V., Alarcón, L. F., and Molenaar, K. (2009). " Multiobjective design of work-in-process buffer for scheduling repetitive building projects. " Autom. Constr. AUCOES 0926-5805, 18 (2), 95-108. 10.1016/j.autcon.2008.05.005
    • (2009) Autom. Constr. , vol.18 , Issue.2 , pp. 95-108
    • González, V.1    Alarcón, L.F.2    Molenaar, K.3
  • 10
    • 45849086928 scopus 로고    scopus 로고
    • Investigating the relationship between planning reliability and project performance
    • " PPCOEM 0953-7287, 10.1080/09537280802059023
    • González, V., Alarcón, L. F., and Mundaca, F. (2008b). " Investigating the relationship between planning reliability and project performance. " Prod. Plan. Control PPCOEM 0953-7287, 19 (5), 461-474. 10.1080/09537280802059023
    • (2008) Prod. Plan. Control , vol.19 , Issue.5 , pp. 461-474
    • González, V.1    Alarcón, L.F.2    Mundaca, F.3
  • 11
    • 34147115212 scopus 로고    scopus 로고
    • A virtual prototyping system for simulating construction processes
    • DOI 10.1016/j.autcon.2006.09.007, PII S0926580506001002
    • Huang, T., Kong, C. W., Guo, H. L., Baldwin, A., and Li, H. (2007). " A virtual prototyping system for simulating construction processes. " Autom. Constr. AUCOES 0926-5805, 16 (5), 576-585. 10.1016/j.autcon.2006. 09.007 (Pubitemid 46575187)
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 576-585
    • Huang, T.1    Kong, C.W.2    Guo, H.L.3    Baldwin, A.4    Li, H.5
  • 13
    • 1842853389 scopus 로고
    • The multiplicity concept in construction project planning
    • " CMECF3 0144-6193, 10.1080/01446199400000007
    • Laufer, A., Tucker, R. L., Shapira, A., and Shenhar, A. J. (1994). " The multiplicity concept in construction project planning. " Constr. Manage. Econom. CMECF3 0144-6193, 12 (1), 53-65. 10.1080/01446199400000007
    • (1994) Constr. Manage. Econom. , vol.12 , Issue.1 , pp. 53-65
    • Laufer, A.1    Tucker, R.L.2    Shapira, A.3    Shenhar, A.J.4
  • 16
    • 33947395204 scopus 로고    scopus 로고
    • On-site subcontractor evaluation method based on lean principles and partnering practices
    • DOI 10.1061/(ASCE)0742-597X(2007)23:2(67)
    • Maturana, S., Alarcón, L. F., Gazmuri, P., and Vrsalovic, M. (2007). " On-site subcontractor evaluation method based on lean principles and partnering practices. " J. Manage. Eng. JMENEA 0742-597X, 23 (2), 67-74. 10.1061/(ASCE)0742-597X(2004)23:2(67) (Pubitemid 46447982)
    • (2007) Journal of Management in Engineering , vol.23 , Issue.2 , pp. 67-74
    • Maturana, S.1    Alarcon, L.F.2    Gazmuri, P.3    Vrsalovic, M.4
  • 17
    • 3242876277 scopus 로고    scopus 로고
    • Project management under uncertainty: The impact of heuristics and biases
    • " 8756-9728.
    • McGray, G. E., Purvis, R. L., and McCray, C. G. (2002). " Project management under uncertainty: The impact of heuristics and biases. " Proj. Manage. J. 8756-9728, 33 (1), 49-57.
    • (2002) Proj. Manage. J. , vol.33 , Issue.1 , pp. 49-57
    • McGray, G.E.1    Purvis, R.L.2    McCray, C.G.3
  • 19
    • 14744304274 scopus 로고    scopus 로고
    • Benchmarking system for evaluating management practices in the construction industry
    • DOI 10.1061/(ASCE)0742-597X(2004)20:3(110)
    • Ramírez, R. R., Alarcón, L. F., and Knights, P. (2004). " Benchmarking system for evaluating management practices in the construction industry. " J. Manage. Eng. JMENEA 0742-597X, 20 (3), 110-117. 10.1061/(ASCE)0742-597X(2004)20:3(110) (Pubitemid 40329295)
    • (2004) Journal of Management in Engineering , vol.20 , Issue.3 , pp. 110-117
    • Ramirez, R.R.1    Alarcon, L.F.C.2    Knights, P.3
  • 20
    • 33748139457 scopus 로고    scopus 로고
    • An economic game theory model of subcontractor resource allocation behaviour
    • DOI 10.1080/01446190600631856, PII W062505N20760183
    • Sacks, R., and Harel, M. (2006). " An economic game theory model of subcontractor resource allocation behaviour. " Constr. Manage. Econom. CMECF3 0144-6193, 24 (8), 869-881. 10.1080/01446190600631856 (Pubitemid 44314576)
    • (2006) Construction Management and Economics , vol.24 , Issue.8 , pp. 869-881
    • Sacks, R.1    Harel, M.2
  • 22
    • 0016570245 scopus 로고
    • Probability encoding in decision analysis
    • MSCIAM 0025-1909, 10.1287/mnsc.22.3.340
    • Spetzler, C. S., and Von Holstein, C. S. S. (1975). " Probability encoding in decision analysis. " Manage. Sci. MSCIAM 0025-1909, 22 (3), 340-358. 10.1287/mnsc.22.3.340
    • (1975) Manage. Sci. , vol.22 , Issue.3 , pp. 340-358
    • Spetzler, C.S.1    Von Holstein, C.S.S.2
  • 23
    • 33645145445 scopus 로고    scopus 로고
    • Fundamental principles of workforce management
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2006)132:1(97)
    • Thomas, H. R., and Horman, M. (2006). " Fundamental principles of workforce management. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (1), 97-104. 10.1061/(ASCE)0733-9364(2006)132:1(97)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.1 , pp. 97-104
    • Thomas, H.R.1    Horman, M.2
  • 24
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • " JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1999)125:5(304)
    • Tommelein, I. D., Riley, D. R., and Howell G. A. (1999). " Parade game: Impact of work flow variability on trade performance. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (5), 304-310. 10.1061/(ASCE)0733-9364(1999) 125:5(304)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.