메뉴 건너뛰기




Volumn 2, Issue 4, 2010, Pages 247-254

Interface modeling and analysis during production ramp-up

Author keywords

Information exchange; Intermediary objects; New Product Development; Production launch; Ramp up

Indexed keywords

DEVELOPMENT PROJECT; DIAGNOSIS TOOLS; INFORMATION EXCHANGES; INFORMATION FLOWS; INTERFACE MODELING; INTERMEDIARY OBJECTS; NEW PRODUCT; NEW PRODUCT DEVELOPMENT; NEW PRODUCT DEVELOPMENT PROCESS; RAMP-UP; SWITCH GEARS;

EID: 77956778685     PISSN: 17555817     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cirpj.2010.02.004     Document Type: Article
Times cited : (6)

References (30)
  • 2
    • 28244466954 scopus 로고    scopus 로고
    • Investing in Product Development and Production Capabilities: The Crucial Linkage Between Time-to-market and Ramp-up Time
    • Carrillo J.E., Franza R.M. Investing in Product Development and Production Capabilities: The Crucial Linkage Between Time-to-market and Ramp-up Time. European Journal of Operational Research 2006, 171(2):536-556.
    • (2006) European Journal of Operational Research , vol.171 , Issue.2 , pp. 536-556
    • Carrillo, J.E.1    Franza, R.M.2
  • 6
    • 77956727605 scopus 로고    scopus 로고
    • A Controlling System Based on Cause-effect Relationships for the Ramp-up of Production Systems
    • Winkler H., Heins M., Nyhuis P. A Controlling System Based on Cause-effect Relationships for the Ramp-up of Production Systems. Production Engineering 2007, 1(1):103-111.
    • (2007) Production Engineering , vol.1 , Issue.1 , pp. 103-111
    • Winkler, H.1    Heins, M.2    Nyhuis, P.3
  • 10
    • 77956716284 scopus 로고    scopus 로고
    • Disturbances in the Boundary of Product Development and Production Ramp-up - A Case Study
    • Simola A., et al. Disturbances in the Boundary of Product Development and Production Ramp-up - A Case Study. Project Management 1998, 4(1):46-49.
    • (1998) Project Management , vol.4 , Issue.1 , pp. 46-49
    • Simola, A.1
  • 11
    • 38249032188 scopus 로고
    • An Exploration of Production Problems in the Initial Commercial Manufacture of Products
    • Langowitz N.S. An Exploration of Production Problems in the Initial Commercial Manufacture of Products. Research Policy 1987, 17:43-54.
    • (1987) Research Policy , vol.17 , pp. 43-54
    • Langowitz, N.S.1
  • 13
    • 33847221831 scopus 로고    scopus 로고
    • Technical Product Change Teams: An Organizational Concept for Increasing the Efficiency and Effectiveness of Technical Product Changes During Ramp-up Phases
    • Scholz-Reiter B., et al. Technical Product Change Teams: An Organizational Concept for Increasing the Efficiency and Effectiveness of Technical Product Changes During Ramp-up Phases. International Journal of Production Research 2007, 45(7):1631-1642.
    • (2007) International Journal of Production Research , vol.45 , Issue.7 , pp. 1631-1642
    • Scholz-Reiter, B.1
  • 15
    • 77956729087 scopus 로고    scopus 로고
    • Interface Issues into Life Cycle Engineering Agenda: Evidences from the Relationships Between Design Engineering And Logistics
    • Koike T., Blanco E., Penz B. Interface Issues into Life Cycle Engineering Agenda: Evidences from the Relationships Between Design Engineering And Logistics. 12th CIRP Life Cycle Engineering Seminar - CIRP LCE 2005.
    • (2005) 12th CIRP Life Cycle Engineering Seminar - CIRP LCE
    • Koike, T.1    Blanco, E.2    Penz, B.3
  • 16
    • 0033640811 scopus 로고    scopus 로고
    • Designer-buyer-supplier Interface: Theory Versus Practice
    • Dowlatshahi S. Designer-buyer-supplier Interface: Theory Versus Practice. International Journal of Production Economics 2000, 63(2):111-130.
    • (2000) International Journal of Production Economics , vol.63 , Issue.2 , pp. 111-130
    • Dowlatshahi, S.1
  • 17
    • 21844483550 scopus 로고
    • Interdepartment Interdependence and Coordination: The Case of the Design/Manufacturing Interface
    • Adler P. Interdepartment Interdependence and Coordination: The Case of the Design/Manufacturing Interface. Organization Science 1995, 6:147-167.
    • (1995) Organization Science , vol.6 , pp. 147-167
    • Adler, P.1
  • 18
    • 0036609620 scopus 로고    scopus 로고
    • Investigating the Manufacturing-marketing Interface in New Product Development: Does Context Affect the Strength of Relationships?
    • Calantone R.J., Dröge C., Vickery S. Investigating the Manufacturing-marketing Interface in New Product Development: Does Context Affect the Strength of Relationships?. Journal of Operations Management 2002, 20(3):273-287.
    • (2002) Journal of Operations Management , vol.20 , Issue.3 , pp. 273-287
    • Calantone, R.J.1    Dröge, C.2    Vickery, S.3
  • 24
    • 0012044789 scopus 로고
    • Mediating and Commissioning Objects in the Sociotechnical Process of Product Design: A Conceptual Approach
    • Cost A3, Brussels, D. MacLean, P. Saviotti, D. Vinck (Eds.)
    • Jeantet A., Vinck D. Mediating and Commissioning Objects in the Sociotechnical Process of Product Design: A Conceptual Approach. Management and New Technology: Design, Networks and Strategies 1995, 111-129. Cost A3, Brussels. D. MacLean, P. Saviotti, D. Vinck (Eds.).
    • (1995) Management and New Technology: Design, Networks and Strategies , pp. 111-129
    • Jeantet, A.1    Vinck, D.2
  • 25
    • 0031108561 scopus 로고    scopus 로고
    • A Model-based Framework to Overlap Product Development Activities
    • Krishnan V., Eppinger S.D., Whitney D.E. A Model-based Framework to Overlap Product Development Activities. Management Science 1997, 43(4):437-451.
    • (1997) Management Science , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 26
  • 27
    • 11144276489 scopus 로고    scopus 로고
    • Knowledge Capitalisation Based on Textual and Graphical Semi-structured and Non-Structured Information: Case Study in an Industrial Research Centre at EADS
    • Gardoni M., Frank C., Vernadat F. Knowledge Capitalisation Based on Textual and Graphical Semi-structured and Non-Structured Information: Case Study in an Industrial Research Centre at EADS. Computer in Industry 2005, 56:55-69.
    • (2005) Computer in Industry , vol.56 , pp. 55-69
    • Gardoni, M.1    Frank, C.2    Vernadat, F.3
  • 29
    • 0032651709 scopus 로고    scopus 로고
    • Towards a Framework for Analyzing Efficiency During Start-up: An Empirical Investigation of a Swedish Auto Manufacturer
    • Almgren H. Towards a Framework for Analyzing Efficiency During Start-up: An Empirical Investigation of a Swedish Auto Manufacturer. International Journal of Production Economics 1999, 60-61:79-86.
    • (1999) International Journal of Production Economics , pp. 79-86
    • Almgren, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.