메뉴 건너뛰기




Volumn 20, Issue C, 2005, Pages 1033-1038

Scheduling of a pipeless multi-product batch plant using mixed-integer programming combined with heuristics

Author keywords

multiproduct batch processing; pipeless plant; planning; scheduling; supply chain management

Indexed keywords


EID: 77956755334     PISSN: 15707946     EISSN: None     Source Type: Book Series    
DOI: 10.1016/S1570-7946(05)80014-8     Document Type: Article
Times cited : (7)

References (8)
  • 1
    • 0031140322 scopus 로고    scopus 로고
    • A Mixed-Integer Programming Model for Short-Term Scheduling of Single-Stage Multiproduct Batch Plants with Parallel Lines
    • Cerda J., Henning G., and Grossmann I. A Mixed-Integer Programming Model for Short-Term Scheduling of Single-Stage Multiproduct Batch Plants with Parallel Lines. Ind. and Eng. Chem. Res. 36 (1997) 1695-1707
    • (1997) Ind. and Eng. Chem. Res. , vol.36 , pp. 1695-1707
    • Cerda, J.1    Henning, G.2    Grossmann, I.3
  • 2
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
    • Floudas C., and Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comp. and Chem. Eng. 28 (2004) 2109-2129
    • (2004) Comp. and Chem. Eng. , vol.28 , pp. 2109-2129
    • Floudas, C.1    Lin, X.2
  • 3
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. multipurpose batch processes
    • Ierapetritou M., and Floudas C. Effective continuous-time formulation for short-term scheduling. 1. multipurpose batch processes. Ind. Eng. Chem. Res. 37 (1998) 4341-4359
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.1    Floudas, C.2
  • 4
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations - i. milp formulation
    • Kondili E., Pantelides C., and Sargent R. A general algorithm for short-term scheduling of batch operations - i. milp formulation. Comp. and Chem. Eng. 17 (1993) 211-227
    • (1993) Comp. and Chem. Eng. , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.2    Sargent, R.3
  • 5
    • 0000237789 scopus 로고
    • On the job-shop scheduling problem
    • Manne A.S. On the job-shop scheduling problem. Op. Res. 8 Issue 2 (1960) 219-223
    • (1960) Op. Res. , vol.8 , Issue.Issue 2 , pp. 219-223
    • Manne, A.S.1
  • 6
    • 0028500039 scopus 로고
    • Optimal cyclic scheduling of multistage continuous multiproduct plants
    • Pinto J.M., and Grossmann I.E. Optimal cyclic scheduling of multistage continuous multiproduct plants. Comp. and Chem. Eng. 18 (1994) 797-816
    • (1994) Comp. and Chem. Eng. , vol.18 , pp. 797-816
    • Pinto, J.M.1    Grossmann, I.E.2
  • 7
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G., and Pantelides C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Comp. and Chem. Eng. 20 (1996) 1221-1226
    • (1996) Comp. and Chem. Eng. , vol.20 , pp. 1221-1226
    • Schilling, G.1    Pantelides, C.2
  • 8
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations - ii. computational issues
    • Shah N., Pantelides C.C., and Sargent R. A general algorithm for short-term scheduling of batch operations - ii. computational issues. Comp. and Chem. Eng. 17 no. 2 (1993) 229-244
    • (1993) Comp. and Chem. Eng. , vol.17 , Issue.2 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.