메뉴 건너뛰기




Volumn 17, Issue 3, 2010, Pages 492-497

Dynamic optimization of cutoff grade in underground metal mining

Author keywords

Cutoff grade; Dynamic programming; Optimization; Underground metal mining

Indexed keywords

CUT-OFF GRADE; DECISION UNIT; DYNAMIC OPTIMIZATION; ECONOMIC GAINS; METAL MINES; MINING METHODS; NET PRESENT VALUE; OBJECTIVE FUNCTIONS; SAMPLE DATA; SPATIAL VARIATIONS; TIME AND SPACE; TIME VALUE OF MONEY; UNDERGROUND METAL;

EID: 77956510027     PISSN: 10059784     EISSN: None     Source Type: Journal    
DOI: 10.1007/s11771-010-0512-6     Document Type: Article
Times cited : (25)

References (15)
  • 1
    • 0343911134 scopus 로고
    • Choosing the optimum cutoff grade [J]
    • 492-497 LANE K F. Choosing the optimum cutoff grade [J]. Quarterly of the Colorado School of Mines, 1965, 59(3): 881-829.
    • (1965) Quarterly of the Colorado School of Mines , vol.59 , Issue.3 , pp. 881-829
    • Lane, K.F.1
  • 2
    • 0014437685 scopus 로고
    • Determination of optimum ore reserves and plant size by incremental financial analysis [J]
    • HALLS J L. Determination of optimum ore reserves and plant size by incremental financial analysis [J]. Transactions of the Institution of Mining and Metallurgy, 1969, 78(7): A20-A26.
    • (1969) Transactions of the Institution of Mining and Metallurgy , vol.78 , Issue.7
    • Halls, J.L.1
  • 4
    • 77956549140 scopus 로고    scopus 로고
    • Generic algorithm for cutoff grade selection [J]
    • Chinese
    • YUN Qing-xia. Generic algorithm for cutoff grade selection [J]. Metal Mine, 1997(5): 13-16. (in Chinese)
    • (1997) Metal Mine , Issue.5 , pp. 13-16
    • Yun, Qing-xia.1
  • 5
    • 0742322665 scopus 로고    scopus 로고
    • Using a combination of genetic algorithm and the grid search method to determine optimum cutoff grades of multiple metal deposits [J]
    • ATAEI M, OSANLOO M. Using a combination of genetic algorithm and the grid search method to determine optimum cutoff grades of multiple metal deposits [J]. International Journal of Surface Mining, Reclamation and Environment, 2004, 18(1): 60-78.
    • (2004) International Journal of Surface Mining, Reclamation and Environment , vol.18 , Issue.1 , pp. 60-78
    • Ataei, M.1    Osanloo, M.2
  • 6
    • 33845608569 scopus 로고    scopus 로고
    • Mining cutoff grade strategy to optimize NPV based on multiyear GRG iterative factor [J]
    • NIETO A, BASCETIN A. Mining cutoff grade strategy to optimize NPV based on multiyear GRG iterative factor [J]. Transactions of the Institution of Mining and Metallurgy, 2006, 115(2): A59-A64.
    • (2006) Transactions of the Institution of Mining and Metallurgy , vol.115 , Issue.2
    • Nieto, A.1    Bascetin, A.2
  • 7
    • 33748869827 scopus 로고    scopus 로고
    • Optimizing reserves in complex multiple-blend products [J]
    • URBAEZ E. Optimizing reserves in complex multiple-blend products [J]. Mining Engineering, 2006, 58(8): 46-47.
    • (2006) Mining Engineering , vol.58 , Issue.8 , pp. 46-47
    • Urbaez, E.1
  • 8
    • 67651006869 scopus 로고    scopus 로고
    • Short-term gain for long-term pain-How focusing on tactical issues can destroy long-term value [J]
    • HALL B E. Short-term gain for long-term pain-How focusing on tactical issues can destroy long-term value [J]. Journal of the South African Institute of Mining and Metallurgy, 2009, 109(3): 147-156.
    • (2009) Journal of the South African Institute of Mining and Metallurgy , vol.109 , Issue.3 , pp. 147-156
    • Hall, B.E.1
  • 9
    • 0016911674 scopus 로고
    • Dynamic and stochastic programming to optimize cutoff grades and production rates [J]
    • DOWD P A. Dynamic and stochastic programming to optimize cutoff grades and production rates [J]. Transactions of the Institution of Mining and Metallurgy, 1976, 85(12): A22-A29.
    • (1976) Transactions of the Institution of Mining and Metallurgy , vol.85 , Issue.12
    • Dowd, P.A.1
  • 11
    • 0020099927 scopus 로고
    • Choice of mine-mill capacities and production schedules using open-ended dynamic programming [J]
    • LIZOTTE Y, ELBROND J. Choice of mine-mill capacities and production schedules using open-ended dynamic programming [J]. Canadian Institute of Mining Bulletin, 1982, 75(839): 154-163.
    • (1982) Canadian Institute of Mining Bulletin , vol.75 , Issue.839 , pp. 154-163
    • Lizotte, Y.1    Elbrond, J.2
  • 12
    • 77956504866 scopus 로고    scopus 로고
    • Determination of rational cutoff grade for open-pit limit [J]
    • Chinese
    • SUN Zhi-wei, LU Ai-li, ZHANG Jian-hua. Determination of rational cutoff grade for open-pit limit [J]. China Molybdenum Industry, 2006, 30(6): 11-14. (in Chinese)
    • (2006) China Molybdenum Industry , vol.30 , Issue.6 , pp. 11-14
    • Zhi-Wei, S.1    Ai-Li, L.U.2    Zhang, Jian-hua.3
  • 13
    • 77956544979 scopus 로고    scopus 로고
    • Rational determination of open-pit cutoff grade for multiple metal deposits under the new «resources/Reserves Classification Standard»[J]
    • Chinese
    • CHEN Dao-gui, LIU Hong-xing. Rational determination of open-pit cutoff grade for multiple metal deposits under the new «Resources/Reserves Classification Standard»[J]. Mining Research & Development, 2007, 27(6): 4-6. (in Chinese)
    • (2007) Mining Research & Development , vol.27 , Issue.6 , pp. 4-6
    • Dao-Gui, C.1    Liu, Hong-xing.2
  • 15
    • 77956548481 scopus 로고    scopus 로고
    • Discussion on regulation model of marginal grade and its application [J]
    • Chinese
    • JIA Wen, CHEN Jia-bin. Discussion on regulation model of marginal grade and its application [J]. Natural Resource Economics of China, 2008(6): 35-37. (in Chinese)
    • (2008) Natural Resource Economics of China , Issue.6 , pp. 35-37
    • Wen, J.1    Chen, Jia-bin.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.