메뉴 건너뛰기




Volumn 2, Issue , 2010, Pages 332-336

Task scheduling of computational grid based on particle swarm algorithm

Author keywords

Computational grid; Particle swarm; Scheduling model; Task scheduling

Indexed keywords

ANT ALGORITHMS; APPROXIMATE OPTIMAL SOLUTIONS; COMPUTATIONAL GRIDS; CONTINUOUS SPACES; HYBRID ALGORITHMS; INERTIA WEIGHT; PARTICLE SWARM; PARTICLE SWARM ALGORITHM; SCHEDULING MODEL; SCHEDULING THEORY; SEARCHING CAPABILITY; TASK SCHEDULING PROBLEM; TASK-SCHEDULING; TASK-SCHEDULING ALGORITHMS;

EID: 77956434246     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CSO.2010.34     Document Type: Conference Paper
Times cited : (16)

References (12)
  • 2
    • 77956449633 scopus 로고    scopus 로고
    • Modeling and analysis of task scheduling in computational grids using stochastic high-level petri nets
    • SHAN Zhi-guang, LIN Chuang. Modeling and Analysis of Task Scheduling in Computational Grids using Stochastic High-level Petri Nets.Journal of System Simulation,2007,19(1):199-200.
    • (2007) Journal of System Simulation , vol.19 , Issue.1 , pp. 199-200
    • Shan, Z.-G.1    Lin, C.2
  • 5
    • 58249124983 scopus 로고    scopus 로고
    • Study on particle swarm algorithm for Job Shop scheduling problems
    • SONG Xiao-yu,CAO Yang,MENG Qiu-hong. Study on particle swarm algorithm for Job Shop scheduling problems. Systems Engineering and Electronics,2008, 30(12):2398-2401.
    • (2008) Systems Engineering and Electronics , vol.30 , Issue.12 , pp. 2398-2401
    • Song, X.-Y.1    Cao, Y.2    Meng, Q.-H.3
  • 8
    • 38949174716 scopus 로고    scopus 로고
    • Study on PSO algorithm in solving grid task scheduling
    • JI Yi-mu, WANG Ru-chuan. Study on PSO algorithm in solving grid task scheduling. Journal on Communications,2007,28(10):63-64.
    • (2007) Journal on Communications , vol.28 , Issue.10 , pp. 63-64
    • Ji, Y.-M.1    Wang, R.-C.2
  • 10
    • 70449429750 scopus 로고    scopus 로고
    • Grid task scheduling algorithm based on combined evolutionary computation
    • YANG Bo, CHEN Zhi-gang, LIU Li. Grid Task Scheduling Algorithm Based on Combined Evolutionary Computation. Computer Engineering,2007,33(18):181-183.
    • (2007) Computer Engineering , vol.33 , Issue.18 , pp. 181-183
    • Yang, B.1    Chen, Z.-G.2    Liu, L.3
  • 11
    • 77956449306 scopus 로고    scopus 로고
    • Research on job scheduling based on ant algorithm in computational grid
    • ZHAO Chen-yang, YANG Yi, LIU Li, LI Lian. Research on Job Scheduling Based on Ant Algorithm in Computational Grid. Microelectronics and Computer,2007,24(9):78-81.
    • (2007) Microelectronics and Computer , vol.24 , Issue.9 , pp. 78-81
    • Zhao, C.-Y.1    Yang, Y.2    Liu, L.3    Li, L.4
  • 12
    • 84899047533 scopus 로고    scopus 로고
    • Small worlds and meg, a-minds: Efects of neighborhood topology on particle swarm performance
    • Piscataway: IEEE Press
    • Kennedy J.Small worlds and meg,a-minds:Efects of neighborhood topology on particle swarm performance.Proceedings of the Congress on Evolutionary Computation.Piscataway:IEEE Press,1999.1931-1938.
    • (1999) Proceedings of the Congress on Evolutionary Computation , pp. 1931-1938
    • Kennedy, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.