메뉴 건너뛰기




Volumn , Issue , 2010, Pages 1136-1145

Implementation of Building Information Modeling (BIM) in Modular Construction: Benefits and challenges

Author keywords

Building Information Modeling; Building systems; Coordination; Prefabrication

Indexed keywords

BUILDING INDUSTRY; BUILDING INFORMATION MODELING; BUILDING SYSTEMS; BUILT ENVIRONMENT; CONSTRUCTION SCHEDULES; COORDINATION; MANUFACTURING PLANT; PREFABRICATION; PRODUCT QUALITY; STRUCTURE UNIT;

EID: 77956311886     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41109(373)114     Document Type: Conference Paper
Times cited : (97)

References (16)
  • 4
    • 77956313045 scopus 로고    scopus 로고
    • Overcoming client and market resistance to prefabrication and standardization in housing
    • UK
    • Edge, M, et al (2002) Overcoming client and market resistance to prefabrication and standardization in housing, Research report of department of trade and industry, UK.
    • (2002) Research Report of Department of Trade and Industry
    • Edge, M.1
  • 5
    • 0002908379 scopus 로고    scopus 로고
    • Construction as a manufacturing process
    • Gann, D. M. (1996) Construction as a manufacturing process, Construction Management & Economics, 14(6) 437-450.
    • (1996) Construction Management & Economics , vol.14 , Issue.6 , pp. 437-450
    • Gann, D.M.1
  • 7
    • 77956318753 scopus 로고    scopus 로고
    • The economic implication of subcontracting practice on building prefabrications
    • Hsish, T. Y. (1997) The economic implication of subcontracting practice on building prefabrications. Automation in Construction
    • (1997) Automation in Construction
    • Hsish, T.Y.1
  • 8
    • 77956306087 scopus 로고    scopus 로고
    • KBS
    • KBS, 2009, www.bimx.com/2009/10/modular-construction-bim.html
    • (2009)
  • 11
    • 57049182967 scopus 로고    scopus 로고
    • Designers' and general contractors' perceptions of offsite construction techniques in the United State construction industry
    • Lu, N (2008) Designers' and general contractors' perceptions of offsite construction techniques in the United State construction industry, International Journal of Construction Education and Research, V (4) 3, pp177-188.
    • (2008) International Journal of Construction Education and Research , vol.3 , Issue.4 , pp. 177-188
    • Lu, N.1
  • 13
    • 32144440624 scopus 로고    scopus 로고
    • Considerations for assessing the benefits of standardization and pre-assembly in construction
    • Pasquire, C.L., and Gibb, A.G.F. (2002) Considerations for assessing the benefits of standardization and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(3), 151-161.
    • (2002) Journal of Financial Management of Property and Construction , vol.7 , Issue.3 , pp. 151-161
    • Pasquire, C.L.1    Gibb, A.G.F.2
  • 15
    • 0034545205 scopus 로고    scopus 로고
    • Coordinating building systems: Process and knowledge
    • December 2000
    • Tatum, C.B., and Korman, T. M (2000) Coordinating Building Systems: Process and Knowledge. ASCE Journal of Architectural Engineering, Volume 6, No.4, December 2000, pp. 116-121.
    • (2000) ASCE Journal of Architectural Engineering , vol.6 , Issue.4 , pp. 116-121
    • Tatum, C.B.1    Korman, T.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.