-
1
-
-
0033738099
-
Production planning and control for remanufacturing: Industry practice and research needs
-
Daniel V, Guide J R. Production planning and control for remanufacturing: industry practice and research needs[J]. Journal of Operations Management, 2000, 18(4): 467-483.
-
(2000)
Journal of Operations Management
, vol.18
, Issue.4
, pp. 467-483
-
-
Daniel, V.1
Guide, J.R.2
-
2
-
-
0029238335
-
Production planning for companies with remanufacturing capability
-
Orlando, FL, USA: IEEE Press
-
Clegg A J, Williams D J, Uzsoy R. Production planning for companies with remanufacturing capability[C]//Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment. Orlando, FL, USA: IEEE Press, 1995: 186-191.
-
(1995)
Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment
, pp. 186-191
-
-
Clegg, A.J.1
Williams, D.J.2
Uzsoy, R.3
-
3
-
-
33749987986
-
Supply planning model for remanufacturing system in reverse logistics environment
-
Kim Kibum, Song Iksoo, Kim Juyong, et al. Supply planning model for remanufacturing system in reverse logistics environment[J]. Computers and Industrial Engineering, 2006, 51(2): 279-287.
-
(2006)
Computers and Industrial Engineering
, vol.51
, Issue.2
, pp. 279-287
-
-
Kim, K.1
Song, I.2
Kim, J.3
-
4
-
-
37849185060
-
Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing
-
Li Yongjian, Chen Jian, Cai Xiaoqiang. Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing[J]. International Journal of Production Economics, 2007, 105(2): 301-317.
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.2
, pp. 301-317
-
-
Li, Y.1
Chen, J.2
Cai, X.3
-
5
-
-
67649410319
-
Joint procurement and production decisions in remanufacturing under quality and demand uncertainty
-
Samar K, Huafan M. Joint procurement and production decisions in remanufacturing under quality and demand uncertainty[J]. International Journal of Production Economics, 2009, 120(1): 5-17.
-
(2009)
International Journal of Production Economics
, vol.120
, Issue.1
, pp. 5-17
-
-
Samar, K.1
Huafan, M.2
-
6
-
-
69249220132
-
A production rate control policy for stochastic repair and remanufacturing systems
-
Robert P, Javad S, Ali G, et al. A production rate control policy for stochastic repair and remanufacturing systems[J]. International Journal of Production Economics, 2009, 121(2): 39-48.
-
(2009)
International Journal of Production Economics
, vol.121
, Issue.2
, pp. 39-48
-
-
Robert, P.1
Javad, S.2
Ali, G.3
-
7
-
-
59349105235
-
A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment
-
Arindam R, Kalipada M, Samarjit K, et al. A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment[J]. Computers and Industrial Engineering, 2009, 56(1): 87-96.
-
(2009)
Computers and Industrial Engineering
, vol.56
, Issue.1
, pp. 87-96
-
-
Arindam, R.1
Kalipada, M.2
Samarjit, K.3
-
8
-
-
67650070582
-
Fuzzy cost control of closed-loop quality chain under uncertain quality level
-
in Chinese
-
Xiao Renbin, Cai Zhengying. Fuzzy cost control of closed-loop quality chain under uncertain quality level[J]. Computer Integrated Manufacturing Systems, 2009, 15(6): 1207-1214. (in Chinese)
-
(2009)
Computer Integrated Manufacturing Systems
, vol.15
, Issue.6
, pp. 1207-1214
-
-
Xiao, R.1
Cai, Z.2
-
9
-
-
67650217071
-
Study on the contribution of engine remanufacturing to the recycle economy
-
in Chinese
-
Xu Binshi, Liu Shican, Shi Peijing, et al. Study on the contribution of engine remanufacturing to the recycle economy[J]. Chinese Surface Engineering, 2005(1): 1-7. (in Chinese)
-
(2005)
Chinese Surface Engineering
, Issue.1
, pp. 1-7
-
-
Xu, B.1
Liu, S.2
Shi, P.3
-
10
-
-
4344686894
-
An approximation approach for uncertainty quantification using evidence theory
-
Ha-rok B, Ramana V, Robert A. An approximation approach for uncertainty quantification using evidence theory[J]. Reliability Engineering and System Safety, 2004, 86(3): 215-225.
-
(2004)
Reliability Engineering and System Safety
, vol.86
, Issue.3
, pp. 215-225
-
-
Ha-Rok, B.1
Ramana, V.2
Robert, A.3
-
11
-
-
2642554727
-
Challenge problems: Uncertainty in system response given uncertain parameters
-
William L, Jon C, Cliff A, et al. Challenge problems: uncertainty in system response given uncertain parameters[J]. Reliability Engineering and System Safety, 2004, 85(1/2/3): 11-19.
-
(2004)
Reliability Engineering and System Safety
, vol.85
, Issue.1-3
, pp. 11-19
-
-
William, L.1
Jon, C.2
Cliff, A.3
-
12
-
-
28844449329
-
Postprocessing the hybrid method for addressing uncertainty in risk assessments
-
Baudrit C, Guyonnet D, Dubois D. Postprocessing the hybrid method for addressing uncertainty in risk assessments[J]. Journal of Environmental Engineering, 2005, 131(12): 1750-1754.
-
(2005)
Journal of Environmental Engineering
, vol.131
, Issue.12
, pp. 1750-1754
-
-
Baudrit, C.1
Guyonnet, D.2
Dubois, D.3
|