메뉴 건너뛰기




Volumn 6, Issue 8, 2010, Pages 3657-3668

Lot sizing, delivery and scheduling of identical jobs in a single-stage supply chain

Author keywords

Batch scheduling; Capacitated lot sizing; Dynamic programming; Production planning; Supply chain

Indexed keywords

BATCH-SCHEDULING; CAPACITATED LOT-SIZING; COMPUTATIONAL RESULTS; DOMINANCE PROPERTIES; HOLDING COSTS; LOT SIZING; LOT SIZING PROBLEMS; NP-HARD; PRODUCTION PLANNING; SCHEDULING PROBLEM; SET-UP TIME; SINGLE STAGE; SUB-PROBLEMS; TOTAL COSTS; TRANSPORTATION PLANS;

EID: 77956242591     PISSN: 13494198     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (16)

References (19)
  • 1
    • 0032069649 scopus 로고    scopus 로고
    • Discrete lotsizing and scheduling by batch sequencing
    • C. Jordan and A. Drexl, Discrete lotsizing and scheduling by batch sequencing, Management Science, vol.44, no.5, pp.698-713, 1998. (Pubitemid 128596874)
    • (1998) Management Science , vol.44 , Issue.5 , pp. 698-713
    • Jordan, G.1    Drexl, A.2
  • 5
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lotsizing: A review of algorithms and complexity
    • C. N. Potts and L. N. Van Wassenhove, Integrating scheduling with batching and lotsizing: A review of algorithms and complexity, Journal of the Operational Research Society, vol.43, pp.395-406, 1992.
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 6
    • 0012694908 scopus 로고    scopus 로고
    • Approximation algorithms for twomachine flow shop scheduling with batch setup times
    • B. Chen, C. N. Potts and V. A. Strusevich, Approximation algorithms for twomachine flow shop scheduling with batch setup times, Mathematical Programming, vol.82, no.1, pp.255-271, 1998.
    • (1998) Mathematical Programming , vol.82 , Issue.1 , pp. 255-271
    • Chen, B.1    Potts, C.N.2    Strusevich, V.A.3
  • 7
    • 0024736520 scopus 로고
    • On the complexity of scheduling with batch setup times
    • C. L. Monma and C. N. Potts, On the complexity of scheduling with batch setup times, Operations Research, vol.37, pp.798-804, 1989.
    • (1989) Operations Research , vol.37 , pp. 798-804
    • Monma, C.L.1    Potts, C.N.2
  • 8
    • 0028753689 scopus 로고
    • Batch scheduling to minimize total completion time
    • J. B. Ghosh, Batch scheduling to minimize total completion time, Operations Research Letters, vol.16, no.5, pp.271-275, 1994.
    • (1994) Operations Research Letters , vol.16 , Issue.5 , pp. 271-275
    • Ghosh, J.B.1
  • 9
    • 32644436289 scopus 로고    scopus 로고
    • Single machine scheduling with batch-dependent setup times
    • G. Mosheiov and D. Oron, Single machine scheduling with batch-dependent setup times, Information Processing Letters, vol.98, no.2, pp.73-78, 2006.
    • (2006) Information Processing Letters , vol.98 , Issue.2 , pp. 73-78
    • Mosheiov, G.1    Oron, D.2
  • 12
    • 0028769382 scopus 로고
    • The discrete lot-sizing and scheduling problem with sequence dependent set-up costs
    • B. Fleischmann, The discrete lot-sizing and scheduling problem with sequence dependent set-up costs, European Journal of Operational Research, vol.75, no.2, pp.395-404, 1994.
    • (1994) European Journal of Operational Research , vol.75 , Issue.2 , pp. 395-404
    • Fleischmann, B.1
  • 13
    • 0001532011 scopus 로고    scopus 로고
    • Solving the discrete lot-sizing and scheduling problem with sequence dependent setup costs and setup times using the traveling salesman problem with time windows
    • M. Salomon, M. M. Solomon, L. N. Van Wassenhove, Y. Dumas and S. Dauzère-Pérès, Solving the discrete lot-sizing and scheduling problem with sequence dependent setup costs and setup times using the traveling salesman problem with time windows, European Journal of Operational Research, vol.100, no.3, pp.494-513, 1997.
    • (1997) European Journal of Operational Research , vol.100 , Issue.3 , pp. 494-513
    • Salomon, M.1    Solomon, M.M.2    Van Wassenhove, L.N.3    Dumas, Y.4    Dauzère- Pérès, S.5
  • 15
    • 0031170482 scopus 로고    scopus 로고
    • Lot sizing and scheduling-survey and extensions
    • A. Drexl and A. Kimms, Lot sizing and scheduling-survey and extensions, European Journal of Operational Research, vol.99, no.2, pp.221-235, 1997.
    • (1997) European Journal of Operational Research , vol.99 , Issue.2 , pp. 221-235
    • Drexl, A.1    Kimms, A.2
  • 17
    • 0001199128 scopus 로고
    • Progress with single-item lot-sizing
    • L. A. Wolsey, Progress with single-item lot-sizing, European Journal of Operational Research, vol.86, no.3, pp.395-401, 1995.
    • (1995) European Journal of Operational Research , vol.86 , Issue.3 , pp. 395-401
    • Wolsey, L.A.1
  • 18


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.