메뉴 건너뛰기




Volumn , Issue , 2010, Pages 231-236

Short-term load forecasting using time series analysis: A case study for Singapore

Author keywords

Short term load forecasting; Singapore data; Time series analysis

Indexed keywords

ELECTRICITY DEMAND FORECASTING; FORECASTING ERROR; MULTIPLICATIVE DECOMPOSITION; SEASONAL ARIMA MODELS; SHORT TERM LOAD FORECASTING; SINGAPORE; TIME SERIES MODELS;

EID: 77956079505     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICCIS.2010.5518553     Document Type: Conference Paper
Times cited : (52)

References (19)
  • 1
    • 0023399522 scopus 로고
    • The time series approach to short term load forecasting
    • Aug.
    • M. T. Hagan and S. M. Behr, "The time series approach to short term load forecasting," IEEE Trans. Power Syst., Vol. PWRS-2, No. 3, Aug. 1987.
    • (1987) IEEE Trans. Power Syst. , vol.PWRS-2 , Issue.3
    • Hagan, M.T.1    Behr, S.M.2
  • 2
    • 18944389569 scopus 로고    scopus 로고
    • Day-ahead electricity price forecasting using the wavelet transform and ARIMA models
    • May
    • A. J. Conejo, M. A. Plazas, R. Espinola and A. B. Molina, "Day-ahead electricity price forecasting using the wavelet transform and ARIMA models," IEEE Trans. Power Syst, Vol. 20, No. 2, May 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.2
    • Conejo, A.J.1    Plazas, M.A.2    Espinola, R.3    Molina, A.B.4
  • 3
    • 0030087191 scopus 로고    scopus 로고
    • Identification of ARMAX model for short term load forecasting: An evolutionary programming approach
    • Feb.
    • H. T. Yang, C. M. Huang and C. L. Huang, "Identification of ARMAX model for short term load forecasting: an evolutionary programming approach," IEEE Trans. Power Syst, Vol. 11, No. 1, Feb. 1996
    • (1996) IEEE Trans. Power Syst , vol.11 , Issue.1
    • Yang, H.T.1    Huang, C.M.2    Huang, C.L.3
  • 5
    • 24944485152 scopus 로고    scopus 로고
    • Short-term load forecasting, profile identification, and customer segmentation: A methodology based on periodic time series
    • Aug.
    • M. Espinoza, C. Joye, R. Belmans and B. D. Moor, "Short-term load forecasting, profile identification, and customer segmentation: a methodology based on periodic time series," IEEE Trans. Power Syst, Vol. 20, No. 3, Aug. 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.3
    • Espinoza, M.1    Joye, C.2    Belmans, R.3    Moor, B.D.4
  • 6
    • 0025519319 scopus 로고
    • A regression-based approach to short-term system load forecasting
    • Nov.
    • A. D. Papalexopoulos and T. C. Hesterberg, "A regression-based approach to short-term system load forecasting," IEEE Trans. Power Syst, Vol. 5, No. 4, Nov. 1990.
    • (1990) IEEE Trans. Power Syst , vol.5 , Issue.4
    • Papalexopoulos, A.D.1    Hesterberg, T.C.2
  • 7
    • 36348992080 scopus 로고    scopus 로고
    • Short-term load forecasting methods: An evaluation based on european data
    • Nov.
    • J. W. Taylor and P. E. McSharry, "Short-term load forecasting methods: an evaluation based on European data," IEEE Trans. Power Syst, Vol. 22, No. 4, Nov. 2007.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.4
    • Taylor, J.W.1    McSharry, P.E.2
  • 8
    • 0024001840 scopus 로고    scopus 로고
    • An expert system based algorithm for short term load forecasting
    • May
    • S. Rahman and R. Bhatnagar, "An expert system based algorithm for short term load forecasting," IEEE Trans. Power Syst, Vol. 3, No. 2, May 1998.
    • (1998) IEEE Trans. Power Syst , vol.3 , Issue.2
    • Rahman, S.1    Bhatnagar, R.2
  • 9
    • 68249157971 scopus 로고    scopus 로고
    • Short-term load forecasting using comprehensive combination based on multimeteorological information
    • July/Aug.
    • S. Fan, L. Chen and W. J. Lee, "Short-term load forecasting using comprehensive combination based on multimeteorological information," IEEE Trans. Industry Applications, Vol. 45, No. 4, July/Aug. 2009.
    • (2009) IEEE Trans. Industry Applications , vol.45 , Issue.4
    • Fan, S.1    Chen, L.2    Lee, W.J.3
  • 10
    • 0034171823 scopus 로고    scopus 로고
    • Hybrid demand model for load estimation and short term load forecasting in distribution electric systems
    • Apr.
    • S. A. Villalba and C. A. Bel, "Hybrid demand model for load estimation and short term load forecasting in distribution electric systems," IEEE Trans. Power Delivery, Vol. 15, No. 2, Apr. 2000.
    • (2000) IEEE Trans. Power Delivery , vol.15 , Issue.2
    • Villalba, S.A.1    Bel, C.A.2
  • 11
    • 0029410319 scopus 로고
    • Demand forecasting using fuzzy neural computation, with special emphasis on weekend and public holiday forecasting
    • Nov.
    • D. Srinivasan, C.S. Chang, and A.C. Liew "Demand forecasting using fuzzy neural computation, with special emphasis on weekend and public holiday forecasting," IEEE Trans. Power Syst, Vol. 10, No. 4, Nov. 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.4
    • Srinivasan, D.1    Chang, C.S.2    Liew, A.C.3
  • 12
    • 0032592947 scopus 로고    scopus 로고
    • Parallel neural network-fuzzy expert system strategy for short term load forecasting; system implementation and performance evaluation
    • Aug.
    • D. Srinivasan, S. S. Tan, C.S. Chang and E. K. Chan, "Parallel neural network-fuzzy expert system strategy for short term load forecasting; system implementation and performance evaluation," IEEE Trans. Power Syst, Vol. 14, No. 3, Aug. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.3
    • Srinivasan, D.1    Tan, S.S.2    Chang, C.S.3    Chan, E.K.4
  • 14
    • 0029493532 scopus 로고    scopus 로고
    • Customer short term load forecasting by using ARIMA transfer function model
    • M. Y. Cho, J. C. Hwang and C. S. Chen, "Customer short term load forecasting by using ARIMA transfer function model," In Proc of EMPD '95., 1995 International Conf, pp. 317-322. Vol. 1.
    • Proc of EMPD '95., 1995 International Conf , vol.1 , pp. 317-322
    • Cho, M.Y.1    Hwang, J.C.2    Chen, C.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.