-
1
-
-
0034141527
-
Minimizing mean flow time in a two-machine flow shop with sequence-independent setup times
-
Allahverdi, A. (2000), "Minimizing mean flow time in a two-machine flow shop with sequence-independent setup times" in Computers and Operation Research, Vol. 27, No. 2, pp. 111-27.
-
(2000)
Computers and Operation Research
, vol.27
, Issue.2
, pp. 111-127
-
-
Allahverdi, A.1
-
2
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi, A., Ng, C.T., Cheng, T.C.E. and Kovalyov, M.Y. (2008), "A survey of scheduling problems with setup times or costs" in European Journal of Operation Research, Vol. 187, No. 3, pp. 985-1032.
-
(2008)
European Journal of Operation Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
3
-
-
33749118013
-
A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent set up times
-
Choobineh, F.F., Mohebbi, E. and Khoo, H. (2006), "A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent set up times" in European Journal of Operational Research, Vol. 175, No. 1, pp. 318-37.
-
(2006)
European Journal of Operational Research
, vol.175
, Issue.1
, pp. 318-337
-
-
Choobineh, F.F.1
Mohebbi, E.2
Khoo, H.3
-
4
-
-
0033136545
-
A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size
-
Danneberg, D., Tautenhahn, T. and Werner, F. (1999), "A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size" in Mathematical and Computer Modelling, Vol. 29, No. 9, pp. 101-26.
-
(1999)
Mathematical and Computer Modelling
, vol.29
, Issue.9
, pp. 101-126
-
-
Danneberg, D.1
Tautenhahn, T.2
Werner, F.3
-
5
-
-
70349925982
-
A bicriteria m-machine flowshop scheduling with sequence-dependent setup times
-
Eren, T. (2010), "A bicriteria m-machine flowshop scheduling with sequence-dependent setup times" in Applied Mathematical Modelling, Vol. 34, No. 2, pp. 284-93.
-
(2010)
Applied Mathematical Modelling
, vol.34
, Issue.2
, pp. 284-293
-
-
Eren, T.1
-
6
-
-
70249139909
-
New solution methods for single machine bi-criteria scheduling problem: Minimization of average flow time and number of tardy jobs
-
Erenay, F.S., Sabuncuoglu, I., Toptal, A. and Tiwari, M.K. (2010), "New solution methods for single machine bi-criteria scheduling problem: minimization of average flow time and number of tardy jobs" in European Journal of Operation Research, Vol. 201, No. 1, pp. 89-98.
-
(2010)
European Journal of Operation Research
, vol.201
, Issue.1
, pp. 89-98
-
-
Erenay, F.S.1
Sabuncuoglu, I.2
Toptal, A.3
Tiwari, M.K.4
-
7
-
-
0035852852
-
Minimizing total flow time in a two-machine flow shop problem with minimum makespan
-
Gupta, J.N.D., Venkata, G., Neppalli, R. and Werner, F. (2001), "Minimizing total flow time in a two-machine flow shop problem with minimum makespan" in International Journal of Production Economics, Vol. 69, No. 3, pp. 323-38.
-
(2001)
International Journal of Production Economics
, vol.69
, Issue.3
, pp. 323-338
-
-
Gupta, J.N.D.1
Venkata, G.2
Neppalli, R.3
Werner, F.4
-
8
-
-
0024770085
-
Optimization by simulated annealing: An experimental evaluation; part I. Graph partitioning
-
Johnson, D.S., Aragon, C.R., McGeoeh, L.A. and Schevon, C. (1989), "Optimization by simulated annealing: an experimental evaluation; part I. Graph partitioning" in Operations Research, Vol. 37, No. 6, pp. 865-92.
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 865-892
-
-
Johnson, D.S.1
Aragon, C.R.2
McGeoeh, L.A.3
Schevon, C.4
-
9
-
-
0003075019
-
Optimal two and three stage production schedules with setup times included
-
Johnson, S.M. (1954), "Optimal two and three stage production schedules with setup times included" in Naval Research Logistics Quarterly, Vol. 1, No. 1, pp. 61-8.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
10
-
-
0027240799
-
Heuristics for flowshop scheduling problems minimizing mean tardiness
-
Kim, Y.D. (1993), "Heuristics for flowshop scheduling problems minimizing mean tardiness" in Journal of Operational Research Society, Vol. 44, No. 1, pp. 19-28.
-
(1993)
Journal of Operational Research Society
, vol.44
, Issue.1
, pp. 19-28
-
-
Kim, Y.D.1
-
11
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatt, C.D. and Vecchi, M.P. (1983), "Optimization by simulated annealing" in Science, Vol. 220, No. 4598, pp. 671-80.
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
12
-
-
5144232432
-
Solving multi-objective production scheduling problems using metaheuristics
-
Loukil, T., Teghem, J. and Tuyttens, D. (2005), "Solving multi-objective production scheduling problems using metaheuristics" in European Journal Operation Research, Vol. 161, No. 1, pp. 42-61.
-
(2005)
European Journal Operation Research
, vol.161
, Issue.1
, pp. 42-61
-
-
Loukil, T.1
Teghem, J.2
Tuyttens, D.3
-
13
-
-
0030143260
-
A comparison of neighborhood search techniques for multi-objective combinatorial problems
-
Marett, R. and Wright, M. (1996), "A comparison of neighborhood search techniques for multi-objective combinatorial problems" in Computers and Operations Research, Vol. 23, No. 5, pp. 465-83.
-
(1996)
Computers and Operations Research
, vol.23
, Issue.5
, pp. 465-483
-
-
Marett, R.1
Wright, M.2
-
14
-
-
0030241443
-
Genetic algorithms for flowshop scheduling problems
-
Murata, T., Ishibuchi, H. and Tanaka, H. (1996), "Genetic algorithms for flowshop scheduling problems" in Computers and Industrial Engineering, Vol. 30, No. 4, pp. 1061-71.
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 1061-1071
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
15
-
-
63449107983
-
Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness
-
Naderi, B., Zandieh, M. and Roshanaei, V. (2009), "Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness" in International Journal of Advanced Manufacturing Technology, Vol. 41, Nos 11/12, pp. 1186-98.
-
(2009)
International Journal of Advanced Manufacturing Technology
, vol.41
, Issue.11-12
, pp. 1186-1198
-
-
Naderi, B.1
Zandieh, M.2
Roshanaei, V.3
-
16
-
-
64449085610
-
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
-
Naderi, B., Zandieh, M., Balagh, K.K.G. and Roshanaei, V. (2009), "An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness" in Expert Systems with Applications: An International Journal, Vol. 36, No. 6, pp. 9625-33.
-
(2009)
Expert Systems with Applications: An International Journal
, vol.36
, Issue.6
, pp. 9625-9633
-
-
Naderi, B.1
Zandieh, M.2
Balagh, K.K.G.3
Roshanaei, V.4
-
17
-
-
0020699921
-
A heuristic algorithm for the m-machine n-job flow shop sequencing problem
-
Nawaz, M., Enscore, E. and Ham, I. (1983), "A heuristic algorithm for the m-machine n-job flow shop sequencing problem" in Omega The International Journal of Management, Vol. 11, No. 1, pp. 91-5.
-
(1983)
Omega The International Journal of Management
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.2
Ham, I.3
-
18
-
-
33750007920
-
A bicriterian flow shops scheduling using artificial neural network
-
Noorul Haq, A. and Radha Ramanan, T. (2006), "A bicriterian flow shops scheduling using artificial neural network" in International Journal of Advanced Manufacturing Technology, Vol. 30, Nos 11/12, pp. 1132-8.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, Issue.11-12
, pp. 1132-1138
-
-
Noorul Haq, A.1
Radha Ramanan, T.2
-
19
-
-
0031190804
-
A simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs - a case study
-
Parthasarathy, S. and Rajendran, C. (1997), "A simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs - a case study" in Production Planning & Control, Vol. 8, No. 5, pp. 475-83.
-
(1997)
Production Planning & Control
, vol.8
, Issue.5
, pp. 475-483
-
-
Parthasarathy, S.1
Rajendran, C.2
-
20
-
-
3142526747
-
A TSP-GA multi-objective algorithm for flow shop scheduling
-
Ponnambalam, S.G., Jagannathan, H., Kataria, M. and Gadicherla, A. (2004), "A TSP-GA multi-objective algorithm for flow shop scheduling" in International Journal of Advanced Manufacturing Technology, Vol. 23, Nos 11/12, pp. 909-15.
-
(2004)
International Journal of Advanced Manufacturing Technology
, vol.23
, Issue.11-12
, pp. 909-915
-
-
Ponnambalam, S.G.1
Jagannathan, H.2
Kataria, M.3
Gadicherla, A.4
-
21
-
-
33751090978
-
A multi-objective particle swarm for a flow shop scheduling problem
-
Rahimi-Vahed, R. and Mirghorbani, S.M. (2007), "A multi-objective particle swarm for a flow shop scheduling problem" in Journal of Combinatorial Optimization, Vol. 13, No. 1, pp. 79-102.
-
(2007)
Journal of Combinatorial Optimization
, vol.13
, Issue.1
, pp. 79-102
-
-
Rahimi-Vahed, R.1
Mirghorbani, S.M.2
-
22
-
-
0029635352
-
Theory and methodology heuristics for scheduling in flow shop with multiple objectives
-
Rajendran, C. (1995), "Theory and methodology heuristics for scheduling in flow shop with multiple objectives" in European Journal of Operation Research, Vol. 82, No. 3, pp. 540-55.
-
(1995)
European Journal of Operation Research
, vol.82
, Issue.3
, pp. 540-555
-
-
Rajendran, C.1
-
23
-
-
18144431039
-
Flow shop scheduling with multiple objective of minimizing makespan and total flow time
-
Ravindran, D., Noorul Haq, A., Selvakuar, S.J. and Sivaraman, R. (2005), "Flow shop scheduling with multiple objective of minimizing makespan and total flow time" in International Journal of Advanced Manufacturing Technology, Vol. 25, pp. 1007-12.
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.25
, pp. 1007-1012
-
-
Ravindran, D.1
Noorul Haq, A.2
Selvakuar, S.J.3
Sivaraman, R.4
-
24
-
-
0027593566
-
Theory and methodology: Multicriteria facility layout problem: An integrated approach
-
Shang, J.S. (1993), "Theory and methodology: multicriteria facility layout problem: an integrated approach" in European Journal of Operational Research, Vol. 66, No. 3, pp. 291-304.
-
(1993)
European Journal of Operational Research
, vol.66
, Issue.3
, pp. 291-304
-
-
Shang, J.S.1
-
25
-
-
0027660653
-
Multi-objective facility layout using simulated annealing
-
Suresh, G. and Sahu, S. (1993), "Multi-objective facility layout using simulated annealing" in International Journal of Production Economics, Vol. 32, No. 2, pp. 239-54.
-
(1993)
International Journal of Production Economics
, vol.32
, Issue.2
, pp. 239-254
-
-
Suresh, G.1
Sahu, S.2
-
26
-
-
0027201278
-
Benchmarks of basic scheduling problems
-
Taillard, E. (1993), "Benchmarks of basic scheduling problems" in European Journal of Operation Research, Vol. 64, No. 2, pp. 278-85.
-
(1993)
European Journal of Operation Research
, vol.64
, Issue.2
, pp. 278-285
-
-
Taillard, E.1
-
27
-
-
2042473473
-
Two-machine flow shop scheduling with two criteria: Maximum earliness and makespan
-
Toktas, B., Azizoglu, M. and Koksalan, S.K. (2004), "Two-machine flow shop scheduling with two criteria: maximum earliness and makespan" in European Journal of Operation Research, Vol. 157, No. 2, pp. 286-95.
-
(2004)
European Journal of Operation Research
, vol.157
, Issue.2
, pp. 286-295
-
-
Toktas, B.1
Azizoglu, M.2
Koksalan, S.K.3
-
28
-
-
0026461248
-
Job shop scheduling by simulated annealing
-
Van Laarhoven, P.J.M., Aarts, E.H.L. and Lenstra, J.K. (1992), "Job shop scheduling by simulated annealing" in Operations Research, Vol. 40, No. 1, pp. 113-25.
-
(1992)
Operations Research
, vol.40
, Issue.1
, pp. 113-125
-
-
van Laarhoven, P.J.M.1
Aarts, E.H.L.2
Lenstra, J.K.3
-
29
-
-
0016099706
-
Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approach
-
Corwin, B.D. and Esogbue, A.O. (1974), "Two machine flow shop scheduling problems with sequence dependent setup times: a dynamic programming approach" in Naval Research Logistic Quarterly, Vol. 21, No. 3, pp. 515-23.
-
(1974)
Naval Research Logistic Quarterly
, vol.21
, Issue.3
, pp. 515-523
-
-
Corwin, B.D.1
Esogbue, A.O.2
-
30
-
-
37049022197
-
An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
-
Ruiz, R. and Stutzle, T. (2008), "An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives" in European Journal of Operational Research, Vol. 187, No. 3, pp. 1143-59.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1143-1159
-
-
Ruiz, R.1
Stutzle, T.2
|