메뉴 건너뛰기




Volumn 14, Issue 3, 2010, Pages 30-41

Multi-objective flow shop scheduling using hybrid simulated annealing

Author keywords

Algorithmic languages; Flow production; Problem solving; Production scheduling; Programming and algorithm theory

Indexed keywords


EID: 77955899193     PISSN: 13683047     EISSN: None     Source Type: Journal    
DOI: 10.1108/13683041011074191     Document Type: Article
Times cited : (14)

References (30)
  • 1
    • 0034141527 scopus 로고    scopus 로고
    • Minimizing mean flow time in a two-machine flow shop with sequence-independent setup times
    • Allahverdi, A. (2000), "Minimizing mean flow time in a two-machine flow shop with sequence-independent setup times" in Computers and Operation Research, Vol. 27, No. 2, pp. 111-27.
    • (2000) Computers and Operation Research , vol.27 , Issue.2 , pp. 111-127
    • Allahverdi, A.1
  • 3
    • 33749118013 scopus 로고    scopus 로고
    • A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent set up times
    • Choobineh, F.F., Mohebbi, E. and Khoo, H. (2006), "A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent set up times" in European Journal of Operational Research, Vol. 175, No. 1, pp. 318-37.
    • (2006) European Journal of Operational Research , vol.175 , Issue.1 , pp. 318-337
    • Choobineh, F.F.1    Mohebbi, E.2    Khoo, H.3
  • 4
    • 0033136545 scopus 로고    scopus 로고
    • A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size
    • Danneberg, D., Tautenhahn, T. and Werner, F. (1999), "A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size" in Mathematical and Computer Modelling, Vol. 29, No. 9, pp. 101-26.
    • (1999) Mathematical and Computer Modelling , vol.29 , Issue.9 , pp. 101-126
    • Danneberg, D.1    Tautenhahn, T.2    Werner, F.3
  • 5
    • 70349925982 scopus 로고    scopus 로고
    • A bicriteria m-machine flowshop scheduling with sequence-dependent setup times
    • Eren, T. (2010), "A bicriteria m-machine flowshop scheduling with sequence-dependent setup times" in Applied Mathematical Modelling, Vol. 34, No. 2, pp. 284-93.
    • (2010) Applied Mathematical Modelling , vol.34 , Issue.2 , pp. 284-293
    • Eren, T.1
  • 6
    • 70249139909 scopus 로고    scopus 로고
    • New solution methods for single machine bi-criteria scheduling problem: Minimization of average flow time and number of tardy jobs
    • Erenay, F.S., Sabuncuoglu, I., Toptal, A. and Tiwari, M.K. (2010), "New solution methods for single machine bi-criteria scheduling problem: minimization of average flow time and number of tardy jobs" in European Journal of Operation Research, Vol. 201, No. 1, pp. 89-98.
    • (2010) European Journal of Operation Research , vol.201 , Issue.1 , pp. 89-98
    • Erenay, F.S.1    Sabuncuoglu, I.2    Toptal, A.3    Tiwari, M.K.4
  • 7
    • 0035852852 scopus 로고    scopus 로고
    • Minimizing total flow time in a two-machine flow shop problem with minimum makespan
    • Gupta, J.N.D., Venkata, G., Neppalli, R. and Werner, F. (2001), "Minimizing total flow time in a two-machine flow shop problem with minimum makespan" in International Journal of Production Economics, Vol. 69, No. 3, pp. 323-38.
    • (2001) International Journal of Production Economics , vol.69 , Issue.3 , pp. 323-338
    • Gupta, J.N.D.1    Venkata, G.2    Neppalli, R.3    Werner, F.4
  • 8
    • 0024770085 scopus 로고
    • Optimization by simulated annealing: An experimental evaluation; part I. Graph partitioning
    • Johnson, D.S., Aragon, C.R., McGeoeh, L.A. and Schevon, C. (1989), "Optimization by simulated annealing: an experimental evaluation; part I. Graph partitioning" in Operations Research, Vol. 37, No. 6, pp. 865-92.
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 865-892
    • Johnson, D.S.1    Aragon, C.R.2    McGeoeh, L.A.3    Schevon, C.4
  • 9
    • 0003075019 scopus 로고
    • Optimal two and three stage production schedules with setup times included
    • Johnson, S.M. (1954), "Optimal two and three stage production schedules with setup times included" in Naval Research Logistics Quarterly, Vol. 1, No. 1, pp. 61-8.
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 10
    • 0027240799 scopus 로고
    • Heuristics for flowshop scheduling problems minimizing mean tardiness
    • Kim, Y.D. (1993), "Heuristics for flowshop scheduling problems minimizing mean tardiness" in Journal of Operational Research Society, Vol. 44, No. 1, pp. 19-28.
    • (1993) Journal of Operational Research Society , vol.44 , Issue.1 , pp. 19-28
    • Kim, Y.D.1
  • 11
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gelatt, C.D. and Vecchi, M.P. (1983), "Optimization by simulated annealing" in Science, Vol. 220, No. 4598, pp. 671-80.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 12
    • 5144232432 scopus 로고    scopus 로고
    • Solving multi-objective production scheduling problems using metaheuristics
    • Loukil, T., Teghem, J. and Tuyttens, D. (2005), "Solving multi-objective production scheduling problems using metaheuristics" in European Journal Operation Research, Vol. 161, No. 1, pp. 42-61.
    • (2005) European Journal Operation Research , vol.161 , Issue.1 , pp. 42-61
    • Loukil, T.1    Teghem, J.2    Tuyttens, D.3
  • 13
    • 0030143260 scopus 로고    scopus 로고
    • A comparison of neighborhood search techniques for multi-objective combinatorial problems
    • Marett, R. and Wright, M. (1996), "A comparison of neighborhood search techniques for multi-objective combinatorial problems" in Computers and Operations Research, Vol. 23, No. 5, pp. 465-83.
    • (1996) Computers and Operations Research , vol.23 , Issue.5 , pp. 465-483
    • Marett, R.1    Wright, M.2
  • 14
    • 0030241443 scopus 로고    scopus 로고
    • Genetic algorithms for flowshop scheduling problems
    • Murata, T., Ishibuchi, H. and Tanaka, H. (1996), "Genetic algorithms for flowshop scheduling problems" in Computers and Industrial Engineering, Vol. 30, No. 4, pp. 1061-71.
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 1061-1071
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 15
    • 63449107983 scopus 로고    scopus 로고
    • Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness
    • Naderi, B., Zandieh, M. and Roshanaei, V. (2009), "Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness" in International Journal of Advanced Manufacturing Technology, Vol. 41, Nos 11/12, pp. 1186-98.
    • (2009) International Journal of Advanced Manufacturing Technology , vol.41 , Issue.11-12 , pp. 1186-1198
    • Naderi, B.1    Zandieh, M.2    Roshanaei, V.3
  • 16
    • 64449085610 scopus 로고    scopus 로고
    • An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
    • Naderi, B., Zandieh, M., Balagh, K.K.G. and Roshanaei, V. (2009), "An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness" in Expert Systems with Applications: An International Journal, Vol. 36, No. 6, pp. 9625-33.
    • (2009) Expert Systems with Applications: An International Journal , vol.36 , Issue.6 , pp. 9625-9633
    • Naderi, B.1    Zandieh, M.2    Balagh, K.K.G.3    Roshanaei, V.4
  • 17
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine n-job flow shop sequencing problem
    • Nawaz, M., Enscore, E. and Ham, I. (1983), "A heuristic algorithm for the m-machine n-job flow shop sequencing problem" in Omega The International Journal of Management, Vol. 11, No. 1, pp. 91-5.
    • (1983) Omega The International Journal of Management , vol.11 , Issue.1 , pp. 91-95
    • Nawaz, M.1    Enscore, E.2    Ham, I.3
  • 19
    • 0031190804 scopus 로고    scopus 로고
    • A simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs - a case study
    • Parthasarathy, S. and Rajendran, C. (1997), "A simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs - a case study" in Production Planning & Control, Vol. 8, No. 5, pp. 475-83.
    • (1997) Production Planning & Control , vol.8 , Issue.5 , pp. 475-483
    • Parthasarathy, S.1    Rajendran, C.2
  • 21
    • 33751090978 scopus 로고    scopus 로고
    • A multi-objective particle swarm for a flow shop scheduling problem
    • Rahimi-Vahed, R. and Mirghorbani, S.M. (2007), "A multi-objective particle swarm for a flow shop scheduling problem" in Journal of Combinatorial Optimization, Vol. 13, No. 1, pp. 79-102.
    • (2007) Journal of Combinatorial Optimization , vol.13 , Issue.1 , pp. 79-102
    • Rahimi-Vahed, R.1    Mirghorbani, S.M.2
  • 22
    • 0029635352 scopus 로고
    • Theory and methodology heuristics for scheduling in flow shop with multiple objectives
    • Rajendran, C. (1995), "Theory and methodology heuristics for scheduling in flow shop with multiple objectives" in European Journal of Operation Research, Vol. 82, No. 3, pp. 540-55.
    • (1995) European Journal of Operation Research , vol.82 , Issue.3 , pp. 540-555
    • Rajendran, C.1
  • 24
    • 0027593566 scopus 로고
    • Theory and methodology: Multicriteria facility layout problem: An integrated approach
    • Shang, J.S. (1993), "Theory and methodology: multicriteria facility layout problem: an integrated approach" in European Journal of Operational Research, Vol. 66, No. 3, pp. 291-304.
    • (1993) European Journal of Operational Research , vol.66 , Issue.3 , pp. 291-304
    • Shang, J.S.1
  • 25
    • 0027660653 scopus 로고
    • Multi-objective facility layout using simulated annealing
    • Suresh, G. and Sahu, S. (1993), "Multi-objective facility layout using simulated annealing" in International Journal of Production Economics, Vol. 32, No. 2, pp. 239-54.
    • (1993) International Journal of Production Economics , vol.32 , Issue.2 , pp. 239-254
    • Suresh, G.1    Sahu, S.2
  • 26
    • 0027201278 scopus 로고
    • Benchmarks of basic scheduling problems
    • Taillard, E. (1993), "Benchmarks of basic scheduling problems" in European Journal of Operation Research, Vol. 64, No. 2, pp. 278-85.
    • (1993) European Journal of Operation Research , vol.64 , Issue.2 , pp. 278-285
    • Taillard, E.1
  • 27
    • 2042473473 scopus 로고    scopus 로고
    • Two-machine flow shop scheduling with two criteria: Maximum earliness and makespan
    • Toktas, B., Azizoglu, M. and Koksalan, S.K. (2004), "Two-machine flow shop scheduling with two criteria: maximum earliness and makespan" in European Journal of Operation Research, Vol. 157, No. 2, pp. 286-95.
    • (2004) European Journal of Operation Research , vol.157 , Issue.2 , pp. 286-295
    • Toktas, B.1    Azizoglu, M.2    Koksalan, S.K.3
  • 29
    • 0016099706 scopus 로고
    • Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approach
    • Corwin, B.D. and Esogbue, A.O. (1974), "Two machine flow shop scheduling problems with sequence dependent setup times: a dynamic programming approach" in Naval Research Logistic Quarterly, Vol. 21, No. 3, pp. 515-23.
    • (1974) Naval Research Logistic Quarterly , vol.21 , Issue.3 , pp. 515-523
    • Corwin, B.D.1    Esogbue, A.O.2
  • 30
    • 37049022197 scopus 로고    scopus 로고
    • An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
    • Ruiz, R. and Stutzle, T. (2008), "An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives" in European Journal of Operational Research, Vol. 187, No. 3, pp. 1143-59.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1143-1159
    • Ruiz, R.1    Stutzle, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.