|
Volumn 15, Issue 5, 2010, Pages 511-522
|
Improved longitudinal joint details in decked bulb tees for accelerated bridge construction: Fatigue evaluation
|
Author keywords
Accelerated bridge construction; Decked bulb tee; Fatigue; Headed reinforcement; Longitudinal joint
|
Indexed keywords
BRIDGE CONSTRUCTIONS;
DECKED BULB TEE;
FATIGUE;
HEADED REINFORCEMENT;
LONGITUDINAL JOINT;
CONCRETE BEAMS AND GIRDERS;
DURABILITY;
FATIGUE TESTING;
LOAD TESTING;
LOADING;
PRECAST CONCRETE;
PRESTRESSED CONCRETE;
REINFORCEMENT;
BRIDGES;
|
EID: 77955754307
PISSN: 10840702
EISSN: None
Source Type: Journal
DOI: 10.1061/(ASCE)BE.1943-5592.0000097 Document Type: Article |
Times cited : (42)
|
References (5)
|