메뉴 건너뛰기




Volumn 6, Issue 3, 2010, Pages 329-339

Feasibility analysis for temperature-constraint hard real-time periodic tasks

Author keywords

Feasibility analysis; leakage; power aware; real time systems; temperature; thermal management

Indexed keywords

COMPUTING TECHNIQUES; DYNAMIC POWER MANAGEMENT; DYNAMIC THERMAL MANAGEMENT; FEASIBILITY ANALYSIS; FEASIBILITY CONDITION; HARD REAL-TIME; IC TECHNOLOGY; INTER-DEPENDENCIES; LEAKAGE; PEAK TEMPERATURES; PERIODIC TASKS; POWER-AWARE; REAL TIME SCHEDULES; SUBMICRON SCALE; SUFFICIENT CONDITIONS; SUPPLY VOLTAGES; THERMAL MANAGEMENT;

EID: 77955712133     PISSN: 15513203     EISSN: None     Source Type: Journal    
DOI: 10.1109/TII.2010.2052057     Document Type: Article
Times cited : (58)

References (34)
  • 2
    • 34547261834 scopus 로고    scopus 로고
    • Thousand core chips: A technology perspective
    • S. Borkar, "Thousand core chips: A technology perspective," in Proc. DAC, 2007, pp. 746-749.
    • (2007) Proc. DAC , pp. 746-749
    • Borkar, S.1
  • 5
    • 2342499716 scopus 로고    scopus 로고
    • System-level power-aware design techniques in real-time systems
    • Jul.
    • O. S. Unsal and I. Koren, "System-level power-aware design techniques in real-time systems," Proc. IEEE, vol.91, no.7, pp. 1-15, Jul. 2003.
    • (2003) Proc. IEEE , vol.91 , Issue.7 , pp. 1-15
    • Unsal, O.S.1    Koren, I.2
  • 6
    • 33947225230 scopus 로고    scopus 로고
    • Speed scaling to manage energy and temperature
    • N. Bansal, T. Kimbrel, and K. Pruhs, "Speed scaling to manage energy and temperature," J. ACM, vol.54, no.1, pp. 1-39, 2007.
    • (2007) J. ACM , vol.54 , Issue.1 , pp. 1-39
    • Bansal, N.1    Kimbrel, T.2    Pruhs, K.3
  • 7
    • 34548138839 scopus 로고    scopus 로고
    • Thermal vs energy optimization for DVFS-enabled processors in embedded systems
    • Y. Liu, H. Yang, R. P. Dick, H. Wang, and L. Shang, "Thermal vs energy optimization for DVFS-enabled processors in embedded systems," in Proc. ISQED, 2007, pp. 204-209.
    • (2007) Proc. ISQED , pp. 204-209
    • Liu, Y.1    Yang, H.2    Dick, R.P.3    Wang, H.4    Shang, L.5
  • 8
    • 63349085876 scopus 로고    scopus 로고
    • Guaranteed scheduling for repetitive hard real-time tasks under the maximal temperature constraint
    • G. Quan, Y. Zhang, W. Wiles, and P. Pei, "Guaranteed scheduling for repetitive hard real-time tasks under the maximal temperature constraint," in Proc. ISSS+CODES, 2008, pp. 267-272.
    • (2008) Proc. ISSS+CODES , pp. 267-272
    • Quan, G.1    Zhang, Y.2    Wiles, W.3    Pei, P.4
  • 9
    • 67650230041 scopus 로고    scopus 로고
    • Proactive speed scheduling for real-time tasks under thermal constraints
    • J.-J. Chen, S. Wang, and L. Thiele, "Proactive speed scheduling for real-time tasks under thermal constraints," in Proc. RTAS, 2009, pp. 141-150.
    • (2009) Proc. RTAS , pp. 141-150
    • Chen, J.-J.1    Wang, S.2    Thiele, L.3
  • 10
    • 22544456242 scopus 로고    scopus 로고
    • Temperature and supply voltage aware performance and power modeling at microarchitecture level
    • W. Liao, L. He, and K. Lepak, "Temperature and supply voltage aware performance and power modeling at microarchitecture level," IEEE Trans. Comput.-Aided Design of Integrated Circuits Syst., vol.24, no.7, pp. 1042-1053, 2005.
    • (2005) IEEE Trans. Comput.-Aided Design of Integrated Circuits Syst. , vol.24 , Issue.7 , pp. 1042-1053
    • Liao, W.1    He, L.2    Lepak, K.3
  • 11
    • 67650300737 scopus 로고    scopus 로고
    • Hotleakage: A temperature-aware model of subthreshold and gate leakage for architects
    • Univ. Virginia , Charlottesville, VA, Tech. Rep.
    • Y. Zhang, D. Parikh, K. Sankaranarayanan, K. Skadron, and M. Stan, "Hotleakage: A temperature-aware model of subthreshold and gate leakage for architects," Dept. Comput. Sci., Univ. Virginia , Charlottesville, VA, Tech. Rep., 2003.
    • (2003) Dept. Comput. Sci.
    • Zhang, Y.1    Parikh, D.2    Sankaranarayanan, K.3    Skadron, K.4    Stan, M.5
  • 12
    • 34548137300 scopus 로고    scopus 로고
    • On the minimization of the instantaneous temperature for periodic real-time tasks
    • J. Chen, C. Hung, and T. Kuo, "On the minimization of the instantaneous temperature for periodic real-time tasks," in Proc. RTAS, 2007, pp. 236-248.
    • (2007) Proc. RTAS , pp. 236-248
    • Chen, J.1    Hung, C.2    Kuo, T.3
  • 13
    • 50249139685 scopus 로고    scopus 로고
    • Approximation algorithm for the temperature- aware scheduling problem
    • S. Zhang and K. S. Chatha, "Approximation algorithm for the temperature- aware scheduling problem," in Proc. ICCAD, 2007, pp. 281-288.
    • (2007) Proc. ICCAD , pp. 281-288
    • Zhang, S.1    Chatha, K.S.2
  • 14
    • 55949114476 scopus 로고    scopus 로고
    • Thermal management for 3d processors via task scheduling
    • X. Zhou, Y. Xu, Y. Du, Y. Zhang, and J. Yang, "Thermal management for 3d processors via task scheduling," in Proc. ICPP, 2008, pp. 115-122.
    • (2008) Proc. ICPP , pp. 115-122
    • Zhou, X.1    Xu, Y.2    Du, Y.3    Zhang, Y.4    Yang, J.5
  • 16
    • 49749109086 scopus 로고    scopus 로고
    • Temperature-aware scheduling and assignment for hard real-time applications on MPSoCs
    • T. Chantem, R. P. Dick, and X. S. Hu, "Temperature-aware scheduling and assignment for hard real-time applications on MPSoCs," in Proc. DATE, 2008, pp. 288-293.
    • (2008) Proc. DATE , pp. 288-293
    • Chantem, T.1    Dick, R.P.2    Hu, X.S.3
  • 17
    • 34247249821 scopus 로고    scopus 로고
    • An optimal analytical solution for processor speed control with thermal constraints
    • R. Rao, S. Vrudhula, C. Chakrabarti, and N. Chang, "An optimal analytical solution for processor speed control with thermal constraints," in Proc. ISLPED, 2006, pp. 292-297.
    • (2006) Proc. ISLPED , pp. 292-297
    • Rao, R.1    Vrudhula, S.2    Chakrabarti, C.3    Chang, N.4
  • 18
    • 52249084545 scopus 로고    scopus 로고
    • Dynamic thermal management through task scheduling
    • J. Yang, X. Zhou, M. Chrobak, Y. Zhang, and L. Jin, "Dynamic thermal management through task scheduling," in Proc. ISPASS, 2008, pp. 191-201.
    • (2008) Proc. ISPASS , pp. 191-201
    • Yang, J.1    Zhou, X.2    Chrobak, M.3    Zhang, Y.4    Jin, L.5
  • 19
    • 33947696762 scopus 로고    scopus 로고
    • Reactive speed control in temperature-constrained real-time systems
    • S. Wang and R. Bettati, "Reactive speed control in temperature-constrained real-time systems," in Proc. ECRTS, 2006, pp. 161-170.
    • (2006) Proc. ECRTS , pp. 161-170
    • Wang, S.1    Bettati, R.2
  • 20
    • 38949134147 scopus 로고    scopus 로고
    • Delay analysis in temperature-constrained hard real-time systems with general task arrivals
    • S. Wang and R. Bettati, "Delay analysis in temperature-constrained hard real-time systems with general task arrivals," in Proc. RTSS, 2006, pp. 323-334.
    • (2006) Proc. RTSS , pp. 323-334
    • Wang, S.1    Bettati, R.2
  • 21
    • 77955717950 scopus 로고    scopus 로고
    • Hotspot 4.2 temperature modeling tool
    • Univ. Virgina. Charlottesville, VA. Online. Available
    • "Hotspot 4.2 temperature modeling tool," Univ. Virgina. Charlottesville, VA. [Online]. Available: HotSpot, 2009
    • (2009) HotSpot
  • 22
    • 4444254095 scopus 로고    scopus 로고
    • System level leakage reduction considering the interdependence of temperature and leakage
    • L. He, W. Liao, and M. R. Stan, "System level leakage reduction considering the interdependence of temperature and leakage," in Proc. DAC, 2004, pp. 12-17.
    • (2004) Proc. DAC , pp. 12-17
    • He, L.1    Liao, W.2    Stan, M.R.3
  • 23
    • 46149101240 scopus 로고    scopus 로고
    • Temperature-aware leakage minimization technique for real-time systems
    • L. Yuan, S. Leventhal, and G. Qu, "Temperature-aware leakage minimization technique for real-time systems," in Proc. ICCAD, 2006, pp. 761-764.
    • (2006) Proc. ICCAD , pp. 761-764
    • Yuan, L.1    Leventhal, S.2    Qu, G.3
  • 24
    • 50949085618 scopus 로고    scopus 로고
    • Alt-dvs: Dynamic voltage scaling with awareness of leakage and temperature for real-time systems
    • L. Yuan and G. Qu, "Alt-dvs: Dynamic voltage scaling with awareness of leakage and temperature 45for real-time systems," in Proc. NASA/ESA Conf. Adaptive Hardware and Syst., 2007, pp. 660-670.
    • (2007) Proc. NASA/ESA Conf. Adaptive Hardware and Syst , pp. 660-670
    • Yuan, L.1    Qu, G.2
  • 25
    • 38849083845 scopus 로고    scopus 로고
    • Temperature-aware processor frequency assignment for MPSoCs using convex optimization
    • S. Murali, A. Mutapcic, D. Atienza, R. Gupta, S. Boyd, and G. D. Micheli, "Temperature-aware processor frequency assignment for MPSoCs using convex optimization," in Proc. CODES+ISSS, 2007, pp. 111-116.
    • (2007) Proc. Codes+Isss , pp. 111-116
    • Murali, S.1    Mutapcic, A.2    Atienza, D.3    Gupta, R.4    Boyd, S.5    Micheli, G.D.6
  • 26
    • 34548358706 scopus 로고    scopus 로고
    • Accurate temperaturedependent integrated circuit leakage power estimation is eas in
    • Y. Liu, R. P. Dick, L. Shang, and H. Yang, "Accurate temperaturedependent integrated circuit leakage power estimation is easy," in Proc. DATE, 2007, pp. 1526-1531.
    • (2007) Proc. DATE , pp. 1526-1531
    • Liu, Y.1    Dick, R.P.2    Shang, L.3    Yang, H.4
  • 27
    • 67650215127 scopus 로고    scopus 로고
    • Thermal-aware global real-time scheduling on multicore systems
    • N. Fisher, J.-J. Chen, S. Wang, and L. Thiele, "Thermal-aware global real-time scheduling on multicore systems," in Proc. RTAS, 2009, pp. 131-140.
    • (2009) Proc. RTAS , pp. 131-140
    • Fisher, N.1    Chen, J.-J.2    Wang, S.3    Thiele, L.4
  • 28
    • 70449561191 scopus 로고    scopus 로고
    • Leakage aware feasibility analysis for temperature- constrained hard real-time periodic tasks
    • G. Quan and Y. Zhang, "Leakage aware feasibility analysis for temperature- constrained hard real-time periodic tasks," in Proc. ECRTS, 2009, pp. 207-216.
    • (2009) Proc. ECRTS , pp. 207-216
    • Quan, G.1    Zhang, Y.2
  • 29
    • 70449723376 scopus 로고    scopus 로고
    • Online work maximization under a peak temperature constraint
    • T. Chantem, X. S. Hu, and R. Dick, "Online work maximization under a peak temperature constraint," in Proc. ISLPED, 2009, pp. 105-110.
    • (2009) Proc. ISLPED , pp. 105-110
    • Chantem, T.1    Hu, X.S.2    Dick, R.3
  • 30
    • 1142270611 scopus 로고    scopus 로고
    • Control-theoretic techniques and thermal-RC modeling for accurate and localized dynamic thermal management
    • K. Skadron, T. Abdelzaher,and M. R. Stan, "Control-theoretic techniques and thermal-RC modeling for accurate and localized dynamic thermal management," in Proc. HPCA, 2002, p. 17.
    • (2002) Proc. HPCA , pp. 17
    • Skadron, K.1    Abdelzaher, T.2    Stan, M.R.3
  • 32
    • 0012446421 scopus 로고    scopus 로고
    • Boston: Princeton University Press
    • P. J. Nahin, The Story of √-1 Boston: Princeton University Press, 1998.
    • (1998) The Story of √-1
    • Nahin, P.J.1
  • 33
    • 77955716101 scopus 로고    scopus 로고
    • Online Available
    • Wikipedia, Cubic Function, 2008. [Online]. Available: . wikipedia.org/wiki/Cubic-equation
    • (2008) Wikipedia Cubic Function
  • 34
    • 0029488569 scopus 로고
    • A scheduling model for reduced CPU energy
    • F. Yao, A. Demers, and S. Shenker, "A scheduling model for reduced CPU energy," in Proc. FOCS, 1995, pp. 374-382.
    • (1995) Proc. FOCS , pp. 374-382
    • Yao, F.1    Demers, A.2    Shenker, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.