메뉴 건너뛰기




Volumn 16, Issue 7, 2010, Pages 1419-1426

Hybrid Pareto-based tabu search algorithm for solving the multi-objective flexible Job Shop scheduling problem

Author keywords

Flexible Job Shop scheduling; Multi objective optimization; Neighborhood structure; Pareto archives set; Tabu search

Indexed keywords

BLOCK STRUCTURES; COMPLETION TIME; FLEXIBLE JOB-SHOP SCHEDULING; FLEXIBLE JOB-SHOP SCHEDULING PROBLEM; HYBRID TABU SEARCH; MAKESPAN; MULTI OBJECTIVE; NEIGHBORHOOD STRUCTURE; PARETO ARCHIVE; PARETO SET; SEARCH SPACES; SIMULATION RESULT; SPEED-UPS; TABU SEARCH ALGORITHMS;

EID: 77955649729     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (23)

References (13)
  • 1
    • 0025531716 scopus 로고
    • Job-Shop scheduling with multi-purpose machines
    • BRUKER P, SCHLIE R. Job-Shop scheduling with multi-purpose machines [J]. Computing, 1990, 45 (4): 369-375.
    • (1990) Computing , vol.45 , Issue.4 , pp. 369-375
    • Bruker, P.1    Schlie, R.2
  • 2
    • 14044268702 scopus 로고    scopus 로고
    • An effective hybrid optimization approach for multi-objective flexible Job-Shop scheduling problems
    • XIA W J, WU Z M. An effective hybrid optimization approach for multi-objective flexible Job-Shop scheduling problems [J]. Computers and Industrial Engineering, 2005, 48 (2): 409-425.
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.2 , pp. 409-425
    • Xia, W.J.1    Wu, Z.M.2
  • 3
    • 33845540712 scopus 로고    scopus 로고
    • Multi objective flexible Job-Shop scheduling based on immune algorithm
    • in Chinese
    • YU Jianjun, SUN Shudong, HAO Jinghui. Multi objective flexible Job-Shop scheduling based on immune algorithm [J]. Computer Integrated Manufacturing Systems, 2006, 12 (10): 1643-1650 (in Chinese).
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.10 , pp. 1643-1650
    • Yu, J.1    Sun, S.2    Hao, J.3
  • 4
    • 33947192367 scopus 로고    scopus 로고
    • Improved genetic algorithm for the flexible Job-Shop scheduling with multi-object
    • in Chinese
    • YUAN Kun, ZHU Jianying. Improved genetic algorithm for the flexible Job-Shop scheduling with multi-object [J]. China Mechanical Engineering, 2007, 18 (2): 156-160 (in Chinese).
    • (2007) China Mechanical Engineering , vol.18 , Issue.2 , pp. 156-160
    • Yuan, K.1    Zhu, J.2
  • 5
    • 53749102032 scopus 로고    scopus 로고
    • Multi-objective flexible Job Shop schedule: Design and evaluation by simulation modeling
    • XING Lining, CHEN Yingwu, YANG Kewei. Multi-objective flexible Job Shop schedule: Design and evaluation by simulation modeling [J]. Applied Soft Computing, 2009, 9 (1): 362-376.
    • (2009) Applied Soft Computing , vol.9 , Issue.1 , pp. 362-376
    • Xing, L.1    Chen, Y.2    Yang, K.3
  • 6
    • 67349174559 scopus 로고    scopus 로고
    • An effective hybrid swarm optimization algorithm for multi-objective flexible Job-Shop scheduling problem
    • ZHANG G H, SHAO X Y, LI P G, et al. An effective hybrid swarm optimization algorithm for multi-objective flexible Job-Shop scheduling problem [J]. Computers and Industrial Engineering, 2009, 56 (4): 1309-1318.
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.4 , pp. 1309-1318
    • Zhang, G.H.1    Shao, X.Y.2    Li, P.G.3
  • 7
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible Job-Shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
    • KACEM I, HAMMADI S, BORNE P. Pareto-optimality approach for flexible Job-Shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic [J]. Mathematics and Computers in Simulation, 2002, 60 (3): 245-276.
    • (2002) Mathematics and Computers in Simulation , vol.60 , Issue.3 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 8
    • 33746559361 scopus 로고    scopus 로고
    • Research on multi-objective optimization for flexible Job Shop scheduling
    • in Chinese
    • WU Xiuli, SUN Shudong, YU Jianjun, et al. Research on multi-objective optimization for flexible Job Shop scheduling [J]. Computer Integrated Manufacturing Systems, 2006, 12 (5): 731-736 (in Chinese).
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.5 , pp. 731-736
    • Wu, X.1    Sun, S.2    Yu, J.3
  • 10
    • 58549115678 scopus 로고    scopus 로고
    • A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems
    • PAN Q K, WANG L, QIAN B. A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems [J]. Computers & Operations Research, 2009, 36 (8): 2498-2511.
    • (2009) Computers & Operations Research , vol.36 , Issue.8 , pp. 2498-2511
    • Pan, Q.K.1    Wang, L.2    Qian, B.3
  • 12
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multi-objective evolutionary optimization for flexible Job-Shop scheduling problems
    • Part C
    • KACEM I, HAMMADI S, BORNE P. Approach by localization and multi-objective evolutionary optimization for flexible Job-Shop scheduling problems [J]. IEEE Transactions on Systems, Man and Cybernetics, Part C, 2002, 32 (1): 408-419.
    • (2002) IEEE Transactions on Systems, Man and Cybernetics , vol.32 , Issue.1 , pp. 408-419
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 13
    • 33646145303 scopus 로고    scopus 로고
    • PSO based scheduling algorithm for open shop scheduling problem
    • in Chinese
    • GAO Liang, GAO Haibing, ZHOU Chi. PSO based scheduling algorithm for open shop scheduling problem [J]. Chinese Journal of Mechanical Engineering, 2006, 42 (2): 129-134 (in Chinese).
    • (2006) Chinese Journal of Mechanical Engineering , vol.42 , Issue.2 , pp. 129-134
    • Gao, L.1    Gao, H.2    Zhou, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.