메뉴 건너뛰기




Volumn 234, Issue 8, 2010, Pages 2530-2542

An integrated decision support approach for project investors in risky and uncertain environments

Author keywords

Fuzzy sets; Project evaluation; Project risk assessment; Simulation

Indexed keywords

DECISION MAKERS; ILLUSTRATIVE EXAMPLES; INTEGRATED DECISION; INVESTMENT DECISIONS; PROJECT EVALUATION; PROJECT PARAMETERS; PROJECT RISK; PROJECT RISK ASSESSMENT; RISK LEVELS; UNCERTAIN ENVIRONMENTS;

EID: 77955309157     PISSN: 03770427     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cam.2010.03.018     Document Type: Article
Times cited : (7)

References (33)
  • 3
    • 0026923798 scopus 로고
    • Use of intervals and possibility distributions in economic analysis
    • F. Choobineh, and A. Behrens Use of intervals and possibility distributions in economic analysis Journal of the Operational Research Society 43 9 1992 907 918
    • (1992) Journal of the Operational Research Society , vol.43 , Issue.9 , pp. 907-918
    • Choobineh, F.1    Behrens, A.2
  • 4
    • 0012393448 scopus 로고    scopus 로고
    • 3rd ed. Prentice-Hall, Inc. New Jersey, Upper Saddle River
    • C.S. Park Contemporary Engineering Economics 3rd ed. 2002 Prentice-Hall, Inc. New Jersey, Upper Saddle River
    • (2002) Contemporary Engineering Economics
    • Park, C.S.1
  • 9
    • 33847261101 scopus 로고    scopus 로고
    • A simulation optimization method that considers uncertainty and multiple performance measures
    • S.L. Rosen, C.M. Harmonosky, and M.T. Traband A simulation optimization method that considers uncertainty and multiple performance measures European Journal of Operational Research 181 2007 315 330
    • (2007) European Journal of Operational Research , vol.181 , pp. 315-330
    • Rosen, S.L.1    Harmonosky, C.M.2    Traband, M.T.3
  • 10
    • 77955306070 scopus 로고    scopus 로고
    • Evaluation of risky investment projects through simulation and response surface methodology
    • . Armaneri, and. Yalnkaya Evaluation of risky investment projects through simulation and response surface methodology Lectures on Modeling and Simulation 7 2 2006 21 30
    • (2006) Lectures on Modeling and Simulation , vol.7 , Issue.2 , pp. 21-30
    • Armaneri, Ö.1    Yalçnkaya, Ö.2
  • 11
    • 77955308023 scopus 로고    scopus 로고
    • Proje risk dü.zeyinin belirlenmesi içn simü.lasyonu ve bulank kü.meler teorisini temel alan bütünlşeik bir yaklaşm
    • Ö. Armaneri, G. Zdaolu, and. Yalnkaya Proje risk dzeyinin belirlenmesi iin simlasyonu ve bulank kmeler teorisini temel alan btnleik bir yaklam Journal of Science and Technology 9 2 2008 223 239 (in Turkish)
    • (2008) Journal of Science and Technology , vol.9 , Issue.2 , pp. 223-239
    • Armaneri, Ö.1    Zǧdǧaolu, G.2    Yalçnkaya, Ö.3
  • 12
    • 0022734760 scopus 로고
    • On the relevance of fuzzy sets for operations research
    • A. Kaufmann On the relevance of fuzzy sets for operations research European Journal of Operational Research 25 3 1986 330 335
    • (1986) European Journal of Operational Research , vol.25 , Issue.3 , pp. 330-335
    • Kaufmann, A.1
  • 13
    • 33748948720 scopus 로고    scopus 로고
    • Handling uncertainty in route choice models: From probabilistic to possibilistic approaches
    • V. Henn, and M. Ottomanelli Handling uncertainty in route choice models: from probabilistic to possibilistic approaches European Journal of Operational Research 175 2006 1526 1538
    • (2006) European Journal of Operational Research , vol.175 , pp. 1526-1538
    • Henn, V.1    Ottomanelli, M.2
  • 14
    • 33745160051 scopus 로고    scopus 로고
    • Evaluating IT/IS investments: A fuzzy multi-criteria decision model approach
    • T.Y. Chou, S.T. Chou, and G.H. Tzeng Evaluating IT/IS investments: a fuzzy multi-criteria decision model approach European Journal of Operational Research 173 2006 1026 1046
    • (2006) European Journal of Operational Research , vol.173 , pp. 1026-1046
    • Chou, T.Y.1    Chou, S.T.2    Tzeng, G.H.3
  • 19
    • 0032142045 scopus 로고    scopus 로고
    • Chance constrained integer programming models for capital budgeting in fuzzy environments
    • K. Iwamura, and B. Liu Chance constrained integer programming models for capital budgeting in fuzzy environments Journal of the Operational Research Society 49 1998 854 860 (Pubitemid 128592254)
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.8 , pp. 854-860
    • Iwamura, K.1    Liu, B.2
  • 20
    • 33748428941 scopus 로고    scopus 로고
    • Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters
    • DOI 10.1016/j.cam.2005.11.026, PII S0377042705007120
    • X. Huang Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters Journal of Computational and Applied Mathematics 198 2007 149 159 (Pubitemid 44345058)
    • (2007) Journal of Computational and Applied Mathematics , vol.198 , Issue.1 , pp. 149-159
    • Huang, X.1
  • 21
    • 0032003280 scopus 로고    scopus 로고
    • Neural network as a simulation metamodel in economic analysis of risky projects
    • A.B. Badiru, and D.B. Sieger Neural network as a simulation metamodel in economic analysis of risky projects European Journal of Operational Research 105 1998 130 142
    • (1998) European Journal of Operational Research , vol.105 , pp. 130-142
    • Badiru, A.B.1    Sieger, D.B.2
  • 22
    • 0032317852 scopus 로고    scopus 로고
    • R&D project evaluation model based on fuzzy set priority
    • H.S. Hwang, and J.C. Yu R&D project evaluation model based on fuzzy set priority Computers & Industrial Engineering 35 34 1998 567 570
    • (1998) Computers & Industrial Engineering , vol.35 , Issue.3-4 , pp. 567-570
    • Hwang, H.S.1    Yu, J.C.2
  • 23
    • 0034324933 scopus 로고    scopus 로고
    • Transportation projects selection process using fuzzy sets theory
    • E. Avineri, J. Prashker, and A. Ceder Transportation projects selection process using fuzzy sets theory Fuzzy Sets and Systems 116 2000 35 47
    • (2000) Fuzzy Sets and Systems , vol.116 , pp. 35-47
    • Avineri, E.1    Prashker, J.2    Ceder, A.3
  • 24
    • 0034047856 scopus 로고    scopus 로고
    • Risk management of an agricultural investment in a developing country utilising the CASPAR programme
    • T. Merna, and D.V. Storch Risk management of an agricultural investment in a developing country utilising the CASPAR programme International Journal of Project Management 18 2000 349 360
    • (2000) International Journal of Project Management , vol.18 , pp. 349-360
    • Merna, T.1    Storch, D.V.2
  • 25
    • 0000848285 scopus 로고    scopus 로고
    • Fuzzy capital budgeting
    • D. Kuchta Fuzzy capital budgeting Fuzzy Sets and Systems 111 2000 367 385
    • (2000) Fuzzy Sets and Systems , vol.111 , pp. 367-385
    • Kuchta, D.1
  • 26
    • 2942669281 scopus 로고    scopus 로고
    • Modelling project investment decisions under uncertainty using possibility theory
    • S. Mohamed, and A.K. McCowan Modelling project investment decisions under uncertainty using possibility theory International Journal of Project Management 19 2001 231 241
    • (2001) International Journal of Project Management , vol.19 , pp. 231-241
    • Mohamed, S.1    McCowan, A.K.2
  • 27
    • 0036571158 scopus 로고    scopus 로고
    • Capital budgeting techniques using discounted fuzzy versus probabilistic cash flows
    • C. Kahraman, D. Ruan, and E. Tolga Capital budgeting techniques using discounted fuzzy versus probabilistic cash flows Information Sciences 142 2002 57 76
    • (2002) Information Sciences , vol.142 , pp. 57-76
    • Kahraman, C.1    Ruan, D.2    Tolga, E.3
  • 28
    • 0037774791 scopus 로고    scopus 로고
    • Using simulation software to solve engineering economy problems
    • E.R. Coates, and M.E. Kuhl Using simulation software to solve engineering economy problems Computers & Industrial Engineering 45 2003 285 294
    • (2003) Computers & Industrial Engineering , vol.45 , pp. 285-294
    • Coates, E.R.1    Kuhl, M.E.2
  • 29
    • 8344233418 scopus 로고    scopus 로고
    • Characterization of optimal solutions of uncertainty investment problem
    • E. Ammar, and H.A. Khalifa Characterization of optimal solutions of uncertainty investment problem Applied Mathematics and Computation 160 2005 111 124
    • (2005) Applied Mathematics and Computation , vol.160 , pp. 111-124
    • Ammar, E.1    Khalifa, H.A.2
  • 31
    • 33846422432 scopus 로고    scopus 로고
    • Optimal project selection with random fuzzy parameters
    • X. Huang Optimal project selection with random fuzzy parameters International Journal of Production Economics 106 2 2007 513 522
    • (2007) International Journal of Production Economics , vol.106 , Issue.2 , pp. 513-522
    • Huang, X.1
  • 32
    • 33746239312 scopus 로고    scopus 로고
    • Fuzziness and randomness in investment project risk appraisal
    • B. Rebiasz Fuzziness and randomness in investment project risk appraisal Computers & Operations Research 34 2007 199 210
    • (2007) Computers & Operations Research , vol.34 , pp. 199-210
    • Rebiasz, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.