메뉴 건너뛰기




Volumn 49, Issue 5, 2010, Pages

Survey of cost models for space telescopes

Author keywords

cost model; parametric cost model; space telescope cost model

Indexed keywords

CONCEPT ANALYSIS; COST ESTIMATING RELATIONSHIPS; COST MODELS; GROUND BASED; INTERCOMPARISONS; LOGICAL FRAMEWORKS; PARAMETRIC COST MODEL; PRIMARY MIRRORS; TECHNOLOGY INVESTMENTS;

EID: 77955190097     PISSN: 00913286     EISSN: 15602303     Source Type: Journal    
DOI: 10.1117/1.3430603     Document Type: Article
Times cited : (49)

References (24)
  • 1
    • 33644775450 scopus 로고    scopus 로고
    • Multivariable parametric cost model for ground optical telescope assembly
    • H. P. Stahl, G. Holmes Rowell, G. Reese, and A. Byberg, "Multivariable parametric cost model for ground optical telescope assembly," Opt. Eng. 44(8), 083001 (2005).
    • (2005) Opt. Eng. , vol.44 , Issue.8 , pp. 083001
    • Stahl, H.P.1    Holmes Rowell, G.2    Reese, G.3    Byberg, A.4
  • 2
    • 0018545752 scopus 로고
    • Cost-scaling laws applicable to very large telescopes
    • A. B. Meinel, "Cost-scaling laws applicable to very large telescopes," Opt. Eng. 18(6), 645-647 (1979).
    • (1979) Opt. Eng. , vol.18 , Issue.6 , pp. 645-647
    • Meinel, A.B.1
  • 3
    • 0019938934 scopus 로고
    • Cost relationships for nonconventional telescope structural configurations
    • A. B. Meinel, "Cost relationships for nonconventional telescope structural configurations," J. Opt. Soc. Am. 2(1), 14-20 (1981).
    • (1981) J. Opt. Soc. Am. , vol.2 , Issue.1 , pp. 14-20
    • Meinel, A.B.1
  • 4
    • 1142267449 scopus 로고    scopus 로고
    • Optical phased array configuration for an extremely large telescope
    • A. B. Meinel and M. P. Meinel, "Optical phased array configuration for an extremely large telescope," Appl. Opt. 43(3), 601-607 (2004).
    • (2004) Appl. Opt. , vol.43 , Issue.3 , pp. 601-607
    • Meinel, A.B.1    Meinel, M.P.2
  • 6
    • 0038664193 scopus 로고    scopus 로고
    • Estimating the costs of extremely large telescopes
    • L. Stepp, L. Daggert, and P. Gillett, "Estimating the costs of extremely large telescopes," Proc. SPIE 4840, 309-321 (2002).
    • (2002) Proc. SPIE , vol.4840 , pp. 309-321
    • Stepp, L.1    Daggert, L.2    Gillett, P.3
  • 7
    • 77955193049 scopus 로고    scopus 로고
    • Single variable parametric cost models for space telescopes
    • in press
    • H. P. Stahl, K. Stephens, T. Henrichs, C. Smart, and F. A. Prince, "Single variable parametric cost models for space telescopes," Opt. Eng. 49 (2010) (in press).
    • (2010) Opt. Eng. , vol.49
    • Stahl, H.P.1    Stephens, K.2    Henrichs, T.3    Smart, C.4    Prince, F.A.5
  • 8
    • 78751624749 scopus 로고
    • Very large telescopes
    • Mar.
    • A. B. Meinel and M. Meinel, "Very large telescopes," Optics News 12(3), 9-14 (Mar. 1986).
    • (1986) Optics News , vol.12 , Issue.3 , pp. 9-14
    • Meinel, A.B.1    Meinel, M.2
  • 9
    • 0031357616 scopus 로고    scopus 로고
    • Telescope costs and cost reduction
    • T. Schmidt-Kaler and P. Rucks, "Telescope costs and cost reduction," Proc. SPIE 2871, 635-640 (1997).
    • (1997) Proc. SPIE , vol.2871 , pp. 635-640
    • Schmidt-Kaler, T.1    Rucks, P.2
  • 10
    • 10444223836 scopus 로고    scopus 로고
    • The scaling relationship between telescope cost and aperture size for very large telescopes
    • G. T. Bellea A. B. Meinel, and M. P. Meinel, "The scaling relationship between telescope cost and aperture size for very large telescopes," Proc. SPIE 5489, 563-570 (2004).
    • (2004) Proc. SPIE , vol.5489 , pp. 563-570
    • Bellea, A.B.1    Meinel, G.T.2    Meinel, M.P.3
  • 13
    • 81355166905 scopus 로고    scopus 로고
    • NASA Advanced Mission Cost Model
    • NASA Advanced Mission Cost Model, see http://cost.jsc.nasa.gov/AMCM.html.
  • 16
    • 81355166906 scopus 로고
    • Cost modeling
    • 2nd Ed., Larson and Wertz, Eds., Microcosm and Kluwer Academic Publishers, New York
    • R. Wong, "Cost modeling," Chap. 20 in Space Mission Analysis and Design, 2nd ed., Larson and Wertz, Eds., Microcosm and Kluwer Academic Publishers, New York, (1992).
    • (1992) Chap. 20 in Space Mission Analysis and Design
    • Wong, R.1
  • 17
    • 81355166904 scopus 로고
    • 5th ed., USAF Space Division, Directorate of Cost Analysis, El Segundo, CA
    • F. Fong, et al., Space Division Unmanned Spacecraft Cost Model, 5th ed., USAF Space Division, Directorate of Cost Analysis, El Segundo, CA (1981)
    • (1981) Space Division Unmanned Spacecraft Cost Model
    • Fong, F.1
  • 18
    • 81355137337 scopus 로고
    • 6th ed., USAF Space Division, Directorate of Cost Analysis, El Segundo, CA
    • P. Hillebrand, et al., Space Division Unmanned Spacecraft Cost Model, 6th ed., USAF Space Division, Directorate of Cost Analysis, El Segundo, CA (1988).
    • (1988) Space Division Unmanned Spacecraft Cost Model
    • Hillebrand, P.1
  • 21
    • 33846497000 scopus 로고    scopus 로고
    • A complexity-based risk assessment of low-cost planetary missions: When is a mission too fast and too cheap?
    • JHU/APL, Laurel, MD, 2-5 May
    • D. A. Bearden, "A complexity-based risk assessment of low-cost planetary missions: when is a mission too fast and too cheap?," 4th IAA Intl. Conf. Low-Cost Planetary Missions, JHU/APL, Laurel, MD, 2-5 May 2000.
    • (2000) 4th IAA Intl. Conf. Low-Cost Planetary Missions
    • Bearden, D.A.1
  • 22
    • 34548729075 scopus 로고    scopus 로고
    • Using historical NASA cost and schedule growth to set future programs and project reserve guidelines
    • Big Sky, MT, March 3-10
    • R. Bitten, D. Emmons, and C. Freaner, "Using historical NASA cost and schedule growth to set future programs and project reserve guidelines," IEEE Aerospace Conference, Big Sky, MT, March 3-10, 2007.
    • (2007) IEEE Aerospace Conference
    • Bitten, R.1    Emmons, D.2    Freaner, C.3
  • 23
    • 63549150896 scopus 로고    scopus 로고
    • An assessment of the inherent optimism in early conceptual designs and its effect on cost and schedule growth
    • ESTEC, Noordwijk, The Netherlands, 15-16 May 2008
    • C. W. Freaner, et al., "An assessment of the inherent optimism in early conceptual designs and its effect on cost and schedule growth," SSCAG/SCAF/EACE 2009 Joint International Conference, ESTEC, Noordwijk, The Netherlands, 15-16 May 2008.
    • SSCAG/SCAF/EACE 2009 Joint International Conference
    • Freaner, C.W.1
  • 24
    • 63549115947 scopus 로고    scopus 로고
    • Perspectives on NASA mission cost and schedule performance trends
    • NASA, 3 June
    • D. A. Bearden, "Perspectives on NASA mission cost and schedule performance trends," GSFC System Engineering Symp. NASA, 3 June 2008.
    • (2008) GSFC System Engineering Symp.
    • Bearden, D.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.